Wind Farm Development

Wind Farm Development Bingo Card
Preview

This bingo card has 84 words: WTG, WEC, OEM, Land lease, permitting, pre-construction EY, met mast, MCP, layout optimisation, design life, availability contract, construction contracts, Free!, bankability, debt, equity, O&M contracts, BOP, SP, ISP, operator, owner, asset manager, interconnection, PPAs, substation, collector, transformer, trenching, splicing, cranes, telescopic, crawling, crane pads, laydown areas, senvion, GE, vestas, enercon, siemens-gamesa, nordex-acciona, suzlon, yaw, pitch, generator, gearbox, tower, blade, foundations, warranted power curve, scada, 10-minute, event, betz, wake, icing, derating, anemometer, wind vane, wildlife, dawn, low-winds, bats, due diligence, independent engineer, owner's engineer, SgurrEnergy, Wood, DNV, jp morgan, noise curtailment, P50, P95, P99, off-take, access road, turbine supply agreement (TSA), grid interconnection agreement, COD, Enercon EPK, Vestas SMA, lender, design life and blade heating.

⚠ This card has duplicate items: design life (2)

More like this:

Vestas Bingo - Wind Energy | Unit 4 - Architecture and Construction Bingo | Union | Architecture Construction | Career Exploration

Play Online

Share this URL with your players:

For more control of your online game, create a clone of this card first.

Learn how to conduct a bingo game.

Call List

Probabilities

With players vying for a you'll have to call about __ items before someone wins. There's a __% chance that a lucky player would win after calling __ items.

Tip: If you want your game to last longer (on average), add more unique words/images to it.