This bingo card has 36 words: Material code, Process capabillity, Failure Mode and Effects Analysis, Continuous Flow Manufacturing, JIT (Just In Time), Value Stream Mapping, Root causes analysis, Six sigma, Production readiness review, work in progress (WIP), Operational excellence, Standarization work, Non-Destructive Testing (NDT), Thermal cycle analysis, Dynamic load testing, Welding Automation, KPI, Change control board, Free!, Document control, Computer aided design, High strength low alloy steel, Process mapping, Interdepartamental collab, Supply chain, Manufacturing execution system, Product lifecycle management, Defect density, Lean Six sigma, Operational Risk Assessment, Quality assurance protocols, Lean manufcaturing, BOM, Non- value add, DXF and Design validation.
Lean Healthcare Bingo | ROI Lean Lingo Bingo | CI Bingo | Quality Week Bingo | Quality Week Bingo
Share this URL with your players:
For more control of your online game, create a clone of this card first.
Learn how to conduct a bingo game.
With players vying for a you'll have to call about __ items before someone wins. There's a __% chance that a lucky player would win after calling __ items.
Tip: If you want your game to last longer (on average), add more unique words/images to it.