Daily Stand- up Bottleneck Backlog Refinement Work in Progress (WIP) Column Transparency Scrum Master Definition of Done (DoD) Epic Continuous improvement Sprint Continuous Delivery Value- driven Pull system Timebox Agile mindset Release Planning Flow Inspect and adapt Iteration Product Owner Increment Adaptability Sprint Review Servant leadership Feature Pair Programming Sprint Backlog Backlog Item Cycle time Sprint Retrospective Story Points MVP (Minimum Viable Product) Development Team Prioritization Kanban board Acceptance Criteria Lead time Collaboration Velocity Card Throughput Product Backlog Burndown User Story Daily Stand- up Bottleneck Backlog Refinement Work in Progress (WIP) Column Transparency Scrum Master Definition of Done (DoD) Epic Continuous improvement Sprint Continuous Delivery Value- driven Pull system Timebox Agile mindset Release Planning Flow Inspect and adapt Iteration Product Owner Increment Adaptability Sprint Review Servant leadership Feature Pair Programming Sprint Backlog Backlog Item Cycle time Sprint Retrospective Story Points MVP (Minimum Viable Product) Development Team Prioritization Kanban board Acceptance Criteria Lead time Collaboration Velocity Card Throughput Product Backlog Burndown User Story
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Daily Stand-up
Bottleneck
Backlog Refinement
Work in Progress (WIP)
Column
Transparency
Scrum Master
Definition of Done (DoD)
Epic
Continuous improvement
Sprint
Continuous Delivery
Value-driven
Pull system
Timebox
Agile mindset
Release Planning
Flow
Inspect and adapt
Iteration
Product Owner
Increment
Adaptability
Sprint Review
Servant leadership
Feature
Pair Programming
Sprint Backlog
Backlog Item
Cycle time
Sprint Retrospective
Story Points
MVP (Minimum Viable Product)
Development Team
Prioritization
Kanban board
Acceptance Criteria
Lead time
Collaboration
Velocity
Card
Throughput
Product Backlog
Burndown
User Story