Inspect and adapt Increment Acceptance Criteria Timebox Backlog Refinement Collaboration Backlog Item Pull system User Story Adaptability MVP (Minimum Viable Product) Agile mindset Burndown Column Continuous Delivery Sprint Review Continuous improvement Velocity Pair Programming Servant leadership Sprint Product Backlog Feature Scrum Master Prioritization Story Points Card Bottleneck Epic Product Owner Lead time Definition of Done (DoD) Transparency Sprint Retrospective Iteration Release Planning Development Team Work in Progress (WIP) Flow Throughput Value- driven Cycle time Daily Stand- up Sprint Backlog Kanban board Inspect and adapt Increment Acceptance Criteria Timebox Backlog Refinement Collaboration Backlog Item Pull system User Story Adaptability MVP (Minimum Viable Product) Agile mindset Burndown Column Continuous Delivery Sprint Review Continuous improvement Velocity Pair Programming Servant leadership Sprint Product Backlog Feature Scrum Master Prioritization Story Points Card Bottleneck Epic Product Owner Lead time Definition of Done (DoD) Transparency Sprint Retrospective Iteration Release Planning Development Team Work in Progress (WIP) Flow Throughput Value- driven Cycle time Daily Stand- up Sprint Backlog Kanban board
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Inspect and adapt
Increment
Acceptance Criteria
Timebox
Backlog Refinement
Collaboration
Backlog Item
Pull system
User Story
Adaptability
MVP (Minimum Viable Product)
Agile mindset
Burndown
Column
Continuous Delivery
Sprint Review
Continuous improvement
Velocity
Pair Programming
Servant leadership
Sprint
Product Backlog
Feature
Scrum Master
Prioritization
Story Points
Card
Bottleneck
Epic
Product Owner
Lead time
Definition of Done (DoD)
Transparency
Sprint Retrospective
Iteration
Release Planning
Development Team
Work in Progress (WIP)
Flow
Throughput
Value-driven
Cycle time
Daily Stand-up
Sprint Backlog
Kanban board