Sustainment Continuous Improvement Reduce Waste Visual Management Cost Avoidance Black Belt PDCA Five Whys Straighten Safety Lean Six Sigma Fundamentals Improved Compliance Motion Skills SIPOC Value Stream Mapping Waiting Sustain JDI Sort Heijunka Lean Inventory Improved Throughput Overproduction Shine Fishbone Project Charter Error Proofing Overprocessing Transportation Standardize 8D DMAIC Cost Reduction Yellow Belt Time Studies Green Belt Kaizen Defects Sustainment Continuous Improvement Reduce Waste Visual Management Cost Avoidance Black Belt PDCA Five Whys Straighten Safety Lean Six Sigma Fundamentals Improved Compliance Motion Skills SIPOC Value Stream Mapping Waiting Sustain JDI Sort Heijunka Lean Inventory Improved Throughput Overproduction Shine Fishbone Project Charter Error Proofing Overprocessing Transportation Standardize 8D DMAIC Cost Reduction Yellow Belt Time Studies Green Belt Kaizen Defects
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Sustainment
Continuous Improvement
Reduce Waste
Visual Management
Cost Avoidance
Black Belt
PDCA
Five Whys
Straighten
Safety
Lean Six Sigma Fundamentals
Improved Compliance
Motion
Skills
SIPOC
Value Stream Mapping
Waiting
Sustain
JDI
Sort
Heijunka
Lean
Inventory
Improved Throughput
Overproduction
Shine
Fishbone
Project Charter
Error Proofing
Overprocessing
Transportation
Standardize
8D
DMAIC
Cost Reduction
Yellow Belt
Time Studies
Green Belt
Kaizen
Defects