Coupa Standard Operating Procedure Angela Hammon MONTHLY Liquid Line solenoid Heating, ventilation and air conditioning Roof Top Unit Variable Frequency Drive CIRCUIT BREAKER Blocked Air Flow 53 Downhill Lock Out/Tag Out $500 Fats Oils Grease RVP LED Computerized Maintenance Management System Service Channel Notes Preventative Maintenance Moving refrigerant Chrome fitting around sprinkler heads Absorb and Release Heat Josh Smith Clean out Backflow Safety Check/Lockout- tagout Old Fashioned Main Electrical Panel No Heating, ventilation and air conditioning Dosatron System 30% Grease Trap Motor speed $30k Emergency Generator Temperature logs Fire Department Connection 2415 Nantucket $3.4m Key Performance Indicator 12 Restaurant Technologies, Inc Reactive maintenance Yes Pushes hot water CAROLINE CHAMOUN Energy Management System CBES Deferred Maintenance EVAC Coupa Standard Operating Procedure Angela Hammon MONTHLY Liquid Line solenoid Heating, ventilation and air conditioning Roof Top Unit Variable Frequency Drive CIRCUIT BREAKER Blocked Air Flow 53 Downhill Lock Out/Tag Out $500 Fats Oils Grease RVP LED Computerized Maintenance Management System Service Channel Notes Preventative Maintenance Moving refrigerant Chrome fitting around sprinkler heads Absorb and Release Heat Josh Smith Clean out Backflow Safety Check/Lockout- tagout Old Fashioned Main Electrical Panel No Heating, ventilation and air conditioning Dosatron System 30% Grease Trap Motor speed $30k Emergency Generator Temperature logs Fire Department Connection 2415 Nantucket $3.4m Key Performance Indicator 12 Restaurant Technologies, Inc Reactive maintenance Yes Pushes hot water CAROLINE CHAMOUN Energy Management System CBES Deferred Maintenance EVAC
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Coupa
Standard Operating Procedure
Angela Hammon
MONTHLY
Liquid Line solenoid
Heating, ventilation and air conditioning
Roof Top Unit
Variable Frequency Drive
CIRCUIT BREAKER
Blocked Air Flow
53
Downhill
Lock Out/Tag Out
$500
Fats Oils Grease
RVP
LED
Computerized Maintenance Management System
Service Channel Notes
Preventative Maintenance
Moving refrigerant
Chrome fitting around sprinkler heads
Absorb and Release Heat
Josh Smith
Clean out
Backflow
Safety Check/Lockout-tagout
Old Fashioned
Main Electrical Panel
No
Heating, ventilation and air conditioning
Dosatron System
30%
Grease Trap
Motor speed
$30k
Emergency Generator
Temperature logs
Fire Department Connection
2415 Nantucket $3.4m
Key Performance Indicator
12
Restaurant Technologies, Inc
Reactive maintenance
Yes
Pushes hot water
CAROLINE CHAMOUN
Energy Management System
CBES
Deferred Maintenance
EVAC