12th Century 1970s Computer Models Taller Floors Underground 55 or 56 Meters Tall Freestanding Campanile Soil Composition Soil to Settle 5.44 Degrees 3-meter Foundation Bell Chamber Italian Corps of Engineers Architects Southern Side Counterbalanced Piles Sudden Drop Stabilize 1.6 Degrees 1992 Greek Word 1838 Diagonal Tunnels Massive Stone Pillars Mud 1173 600 Tons of Lead 800- year Center of Gravity Clay 1990 Giovanni di Simone Tipping Point Marshy Land 1935 Steel Cables Stable Bedrock Top Engineers Walkway Prolonged Warfare Beauty of Imperfection Ancient Romans Seventh Floor Excavation Cathedral Square Magnificent Landmark World War II 5.5 Degrees 4 Degrees Fatal Flaw Fourth Story Sunken Foundation Republic Computing Technology Injected Mortar 1272 Plaza Extra Masonry Bell Tower 300 Years Wet Sand 38 Cubic Meters of Soil 12th Century 1970s Computer Models Taller Floors Underground 55 or 56 Meters Tall Freestanding Campanile Soil Composition Soil to Settle 5.44 Degrees 3-meter Foundation Bell Chamber Italian Corps of Engineers Architects Southern Side Counterbalanced Piles Sudden Drop Stabilize 1.6 Degrees 1992 Greek Word 1838 Diagonal Tunnels Massive Stone Pillars Mud 1173 600 Tons of Lead 800- year Center of Gravity Clay 1990 Giovanni di Simone Tipping Point Marshy Land 1935 Steel Cables Stable Bedrock Top Engineers Walkway Prolonged Warfare Beauty of Imperfection Ancient Romans Seventh Floor Excavation Cathedral Square Magnificent Landmark World War II 5.5 Degrees 4 Degrees Fatal Flaw Fourth Story Sunken Foundation Republic Computing Technology Injected Mortar 1272 Plaza Extra Masonry Bell Tower 300 Years Wet Sand 38 Cubic Meters of Soil
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
12th Century
1970s
Computer Models
Taller Floors
Underground
55 or 56 Meters Tall
Freestanding Campanile
Soil Composition
Soil to Settle
5.44 Degrees
3-meter Foundation
Bell Chamber
Italian Corps of Engineers
Architects
Southern Side
Counterbalanced
Piles
Sudden Drop
Stabilize
1.6 Degrees
1992
Greek Word
1838
Diagonal Tunnels
Massive Stone Pillars
Mud
1173
600 Tons of Lead
800-year
Center of Gravity
Clay
1990
Giovanni di Simone
Tipping Point
Marshy Land
1935
Steel Cables
Stable Bedrock
Top Engineers
Walkway
Prolonged Warfare
Beauty of Imperfection
Ancient Romans
Seventh Floor
Excavation
Cathedral Square
Magnificent Landmark
World War II
5.5 Degrees
4 Degrees
Fatal Flaw
Fourth Story
Sunken Foundation
Republic
Computing Technology
Injected Mortar
1272
Plaza
Extra Masonry
Bell Tower
300 Years
Wet Sand
38 Cubic Meters of Soil