(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
I show the actual point-to-point electrical connections between devices and terminals. Identify me.
Wiring Diagram
I convert delivery commitments into shop-floor activities, quantities and target dates. Identify me
Production Plan
I provide an item-by-item quantity breakdown of the required materials, equipment or work. Identify me.
Bill of Quantities (BOQ)
I prove that a representative design successfully passed prescribed design-verification tests. Identify me
Type Test Certificate
I show the equipment’s overall dimensions, arrangement, interfaces and major components. Identify me
General Arrangement Drawing
I communicate the buyer’s intention to award work before the detailed order arrives. Identify me
Letter of Intent (LOI)
I connect every fabricated component to its original material heat number and certificate. Identify me
Material Traceability Register
I list manufacturing and inspection stages and classify them as Hold, Witness, Review or Surveillance points. Identify me.
Inspection and Test Plan
I tell the welder which process, filler material, parameters and heat-treatment requirements to use. Identify me
Welding Procedure Specification
I contain the test results proving that a proposed welding procedure can produce an acceptable weld. Identify me
Procedure Qualification Record
I show process equipment, pipelines, valves, instruments and their functional relationships—but not the exact physical routing. Identify me
Piping and Instrumentation Diagram
I use a portable analyser to confirm that the alloy composition matches the specified material grade. Identify my report.
Positive Material Identification Report
I define the temperature, heating rate, soaking time and cooling cycle required after welding. Identify me
Heat Treatment Procedure
I prove that a particular welder is qualified for specified processes, materials and welding positions. Identify me
Welder Qualification Record
My heat-specific chemical and mechanical results help confirm that the correct raw-material grade was supplied. Identify me.
Material Test Certificate
I combine test boundaries, drawings, pressure requirements, vents, drains and inspection records for a piping pressure test. Identify me
Hydrotest Package
I am the official order that defines what the vendor must supply and under what commercial conditions. Identify me
Purchase Order (PO)
The vendor should not begin controlled manufacturing until I am issued after the required engineering approvals. Identify me
Manufacturing Clearance
I record checks of weld profile, size and visible surface defects. Identify me
Weld Visual Inspection Report
I use high-frequency sound waves to find internal discontinuities or measure material thickness. Identify my report.
Ultrasonic Test Report
I define the overall quality controls, applicable procedures, acceptance requirements and responsibilities for a package. Identify me.
Quality Assurance Plan
I invite potential suppliers to submit their technical and commercial offers for a defined requirement. Identify me.
Request for Quotation
Raise me when material, workmanship or test results do not meet an approved requirement. Identify me.
Non-Conformance Report
I am a significant checkpoint used to measure project or manufacturing progress. Identify me
Milestone