OJT Non- Productive Time Cycle Time Scrap Gantt Chart Visual Controls Just In Time Single Source 5S Gemba Walk Inventory Single Batch WIP Supplier Quality Poka- Yoke Waiting Transport Kanban Bottleneck Pull Production Future State Hoshin Valued- Added Standard Work Continuous Flow Takt Time Safety Stock Quality Control Waste Lead Time Defects Over- production Value Stream SIPOC OJT Non- Productive Time Cycle Time Scrap Gantt Chart Visual Controls Just In Time Single Source 5S Gemba Walk Inventory Single Batch WIP Supplier Quality Poka- Yoke Waiting Transport Kanban Bottleneck Pull Production Future State Hoshin Valued- Added Standard Work Continuous Flow Takt Time Safety Stock Quality Control Waste Lead Time Defects Over- production Value Stream SIPOC
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
OJT
Non-Productive Time
Cycle Time
Scrap
Gantt Chart
Visual Controls
Just In Time
Single Source
5S
Gemba Walk
Inventory
Single Batch
WIP
Supplier Quality
Poka-Yoke
Waiting
Transport
Kanban
Bottleneck
Pull Production
Future State
Hoshin
Valued-Added
Standard Work
Continuous Flow
Takt Time
Safety Stock
Quality Control
Waste
Lead Time
Defects
Over-production
Value Stream
SIPOC