(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
process requirements and product specifications are met
required tools and equipment
arrange to move the box to a more comfortable working height
less than both static friction and kinetic friction
pivot force
tool and equipment requirements for particular part numbers
drill undersize
establish a baseline measurement for process improvements
Dwell
immediate supervisor
oil and fluid levels
confirm that gauges have correct calibration stickers
customer orders another of the same product
Counterclockwise
Materials
production specifications are accurately met
Inches
internal customer or supplier
Ensure that the first piece or production run meets specifications
commitment from top level management
address customer quality issues
Reaming
Material
increasing consistency of work flow and quality
locate and assist the appropriate contact to address the problem
all necessary resources are at the workstations when required.
Shank
there are changes to the manufacturing process
CNC Turning Center
item counts in the inventory
Measurable
cycle count
enlarges a hole for a portion of its depth
ensure warranty reports meet ISO requirements after an audit