Hallway Size,Time ofIntervention &Inconvenience20WeeksResponseEffortItems inClassroomRecyclablesinTrashcansUniversityinSoutheastTexasDiscriminativeStimulus (SD)Items inClassroomA-B-A-BReversalDesignAntecedentControlProcedureStimulusPrompt12EstablishingOperation(EO)AbolishingOperation(AO)2017CorrectRecyclingBaseline251MillionTonsMotivatingOperation(MO)100%Students,Employees,and VisitorsPurposeof Study$1,177OfficeSuitesPresenting the SDor cue, Arrangingan establishingoperation,Decreasing theresponse effortRemoving the SDor cues,Presenting anabolishingoperation,Increasing theresponse effortHallway Size,Time ofIntervention &Inconvenience20WeeksResponseEffortItems inClassroomRecyclablesinTrashcansUniversityinSoutheastTexasDiscriminativeStimulus (SD)Items inClassroomA-B-A-BReversalDesignAntecedentControlProcedureStimulusPrompt12EstablishingOperation(EO)AbolishingOperation(AO)2017CorrectRecyclingBaseline251MillionTonsMotivatingOperation(MO)100%Students,Employees,and VisitorsPurposeof Study$1,177OfficeSuitesPresenting the SDor cue, Arrangingan establishingoperation,Decreasing theresponse effortRemoving the SDor cues,Presenting anabolishingoperation,Increasing theresponse effort

Antecedent Control - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
  1. Hallway Size, Time of Intervention & Inconvenience
  2. 20 Weeks
  3. Response Effort
  4. Items in Classroom
  5. Recyclables in Trashcans
  6. University in Southeast Texas
  7. Discriminative Stimulus (SD)
  8. Items in Classroom
  9. A-B-A-B Reversal Design
  10. Antecedent Control Procedure
  11. Stimulus Prompt
  12. 12
  13. Establishing Operation (EO)
  14. Abolishing Operation (AO)
  15. 2017
  16. Correct Recycling
  17. Baseline
  18. 251 Million Tons
  19. Motivating Operation (MO)
  20. 100%
  21. Students, Employees, and Visitors
  22. Purpose of Study
  23. $1,177
  24. Office Suites
  25. Presenting the SD or cue, Arranging an establishing operation, Decreasing the response effort
  26. Removing the SD or cues, Presenting an abolishing operation, Increasing the response effort