$1,177Presenting the SDor cue, Arrangingan establishingoperation,Decreasing theresponse effortResponseEffortEstablishingOperation(EO)CorrectRecycling251MillionTonsRecyclablesinTrashcansAbolishingOperation(AO)DiscriminativeStimulus (SD)UniversityinSoutheastTexasAntecedentControlProcedureBaselineStimulusPrompt2017100%Items inClassroomPurposeof StudyRemoving the SDor cues,Presenting anabolishingoperation,Increasing theresponse effortA-B-A-BReversalDesignOfficeSuites12Students,Employees,and VisitorsMotivatingOperation(MO)Items inClassroomHallway Size,Time ofIntervention &Inconvenience20Weeks$1,177Presenting the SDor cue, Arrangingan establishingoperation,Decreasing theresponse effortResponseEffortEstablishingOperation(EO)CorrectRecycling251MillionTonsRecyclablesinTrashcansAbolishingOperation(AO)DiscriminativeStimulus (SD)UniversityinSoutheastTexasAntecedentControlProcedureBaselineStimulusPrompt2017100%Items inClassroomPurposeof StudyRemoving the SDor cues,Presenting anabolishingoperation,Increasing theresponse effortA-B-A-BReversalDesignOfficeSuites12Students,Employees,and VisitorsMotivatingOperation(MO)Items inClassroomHallway Size,Time ofIntervention &Inconvenience20Weeks

Antecedent Control - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
  1. $1,177
  2. Presenting the SD or cue, Arranging an establishing operation, Decreasing the response effort
  3. Response Effort
  4. Establishing Operation (EO)
  5. Correct Recycling
  6. 251 Million Tons
  7. Recyclables in Trashcans
  8. Abolishing Operation (AO)
  9. Discriminative Stimulus (SD)
  10. University in Southeast Texas
  11. Antecedent Control Procedure
  12. Baseline
  13. Stimulus Prompt
  14. 2017
  15. 100%
  16. Items in Classroom
  17. Purpose of Study
  18. Removing the SD or cues, Presenting an abolishing operation, Increasing the response effort
  19. A-B-A-B Reversal Design
  20. Office Suites
  21. 12
  22. Students, Employees, and Visitors
  23. Motivating Operation (MO)
  24. Items in Classroom
  25. Hallway Size, Time of Intervention & Inconvenience
  26. 20 Weeks