EstablishingOperation(EO)RecyclablesinTrashcans251MillionTonsPresenting the SDor cue, Arrangingan establishingoperation &Decreasing theresponse effortA-B-A-BReversalDesign100%Items inClassroom12Removing the SDor cues,Presenting anabolishingoperation &Increasing theresponse effortCorrectRecyclingAbolishingOperation(AO)2017Students,Employees,and VisitorsHallway Size,Time ofIntervention &InconvenienceUniversityinSoutheastTexasBaselineAntecedentControlProcedurePurposeof Study$1,177DiscriminativeStimulus (SD)StimulusPromptResponseEffortOfficeSuitesMotivatingoperation(MO)20WeeksEstablishingOperation(EO)RecyclablesinTrashcans251MillionTonsPresenting the SDor cue, Arrangingan establishingoperation &Decreasing theresponse effortA-B-A-BReversalDesign100%Items inClassroom12Removing the SDor cues,Presenting anabolishingoperation &Increasing theresponse effortCorrectRecyclingAbolishingOperation(AO)2017Students,Employees,and VisitorsHallway Size,Time ofIntervention &InconvenienceUniversityinSoutheastTexasBaselineAntecedentControlProcedurePurposeof Study$1,177DiscriminativeStimulus (SD)StimulusPromptResponseEffortOfficeSuitesMotivatingoperation(MO)20Weeks

Antecedent Strategy - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
  1. Establishing Operation (EO)
  2. Recyclables in Trashcans
  3. 251 Million Tons
  4. Presenting the SD or cue, Arranging an establishing operation & Decreasing the response effort
  5. A-B-A-B Reversal Design
  6. 100%
  7. Items in Classroom
  8. 12
  9. Removing the SD or cues, Presenting an abolishing operation & Increasing the response effort
  10. Correct Recycling
  11. Abolishing Operation (AO)
  12. 2017
  13. Students, Employees, and Visitors
  14. Hallway Size, Time of Intervention & Inconvenience
  15. University in Southeast Texas
  16. Baseline
  17. Antecedent Control Procedure
  18. Purpose of Study
  19. $1,177
  20. Discriminative Stimulus (SD)
  21. Stimulus Prompt
  22. Response Effort
  23. Office Suites
  24. Motivating operation (MO)
  25. 20 Weeks