I'm going to lose subs if we delay further This will add two more weeks I didn't create this problem You don't understand Want to reduce it 10% Cliff has been working hard I had to do this do keep the job moving I'm not even marking up the sub What else could I do I've done nothing but help I've been working at this hotel a long time The subs can increase their cost due to time I was trying to solve design issue I didn't charge you my full cost I thought you were a dumb owner's rep I'm losing money on this project There was no other way I haven't charged all my time Want to reduce it 25% I've never had this from a PM before This was the best solution I have a lot of experience I tried that You're budget is wrong I'm going to lose subs if we delay further This will add two more weeks I didn't create this problem You don't understand Want to reduce it 10% Cliff has been working hard I had to do this do keep the job moving I'm not even marking up the sub What else could I do I've done nothing but help I've been working at this hotel a long time The subs can increase their cost due to time I was trying to solve design issue I didn't charge you my full cost I thought you were a dumb owner's rep I'm losing money on this project There was no other way I haven't charged all my time Want to reduce it 25% I've never had this from a PM before This was the best solution I have a lot of experience I tried that You're budget is wrong
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
I'm going to lose subs if we delay further
This will add two more weeks
I didn't create this problem
You don't understand
Want to reduce it 10%
Cliff has been working hard
I had to do this do keep the job moving
I'm not even marking up the sub
What else could I do
I've done nothing but help
I've been working at this hotel a long time
The subs can increase their cost due to time
I was trying to solve design issue
I didn't charge you my full cost
I thought you were a dumb owner's rep
I'm losing money on this project
There was no other way
I haven't charged all my time
Want to reduce it 25%
I've never had this from a PM before
This was the best solution
I have a lot of experience
I tried that
You're budget is wrong