ALPS 3000Plate Sealerdoes anythingbut what itssupposed toBlindsightedby someoneelse'sinstrumentpurchasePower/HVAC/FacilityoutagePipette wasfound in adrawer or otherconfusinglocationIT requestbottleneckRequestinga quoteonly tochange itRandom emailfrom QA/TechSupervisor who isthe only one noton an email threadyou didn't startSticky noteinstead ofproperformJanitorialstaff forgetsto documentcleaningVendorshows up atunexpectedtimeCan't find:Showerdrain stick,freezer key,Testo probeCriticalEquipmentFailureWaited atleast a dayfor a vendorservicereportMissing/latesignatureson labpaperworkemail forIT/facilities/automationsupport that has to bererouted to anotherteam for resolutionFreezerExcursion fromsomeone otherthan BSM orSample PrepCapEx takes anadditional 3days forapprovalbecause of onepersonSomeonecomplains aboutsomething the labis doing/wants todo that you can'tcontrolGetting a requestvia email or in-person and notBenchtopSupportCreatedan InstallChecklistRepairconsisted ofturninginstrument onand off againSomeonedoesn't mutethemselveson a TeamsmeetingEquipmentdelivery isunnecessarilycomplicatedAny sort ofproblems withan automaticor manualdecapperALPS 3000Plate Sealerdoes anythingbut what itssupposed toBlindsightedby someoneelse'sinstrumentpurchasePower/HVAC/FacilityoutagePipette wasfound in adrawer or otherconfusinglocationIT requestbottleneckRequestinga quoteonly tochange itRandom emailfrom QA/TechSupervisor who isthe only one noton an email threadyou didn't startSticky noteinstead ofproperformJanitorialstaff forgetsto documentcleaningVendorshows up atunexpectedtimeCan't find:Showerdrain stick,freezer key,Testo probeCriticalEquipmentFailureWaited atleast a dayfor a vendorservicereportMissing/latesignatureson labpaperworkemail forIT/facilities/automationsupport that has to bererouted to anotherteam for resolutionFreezerExcursion fromsomeone otherthan BSM orSample PrepCapEx takes anadditional 3days forapprovalbecause of onepersonSomeonecomplains aboutsomething the labis doing/wants todo that you can'tcontrolGetting a requestvia email or in-person and notBenchtopSupportCreatedan InstallChecklistRepairconsisted ofturninginstrument onand off againSomeonedoesn't mutethemselveson a TeamsmeetingEquipmentdelivery isunnecessarilycomplicatedAny sort ofproblems withan automaticor manualdecapper

Adaptive Facilities Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. ALPS 3000 Plate Sealer does anything but what its supposed to
  2. Blindsighted by someone else's instrument purchase
  3. Power/HVAC/Facility outage
  4. Pipette was found in a drawer or other confusing location
  5. IT request bottleneck
  6. Requesting a quote only to change it
  7. Random email from QA/Tech Supervisor who is the only one not on an email thread you didn't start
  8. Sticky note instead of proper form
  9. Janitorial staff forgets to document cleaning
  10. Vendor shows up at unexpected time
  11. Can't find: Shower drain stick, freezer key, Testo probe
  12. Critical Equipment Failure
  13. Waited at least a day for a vendor service report
  14. Missing/late signatures on lab paperwork
  15. email for IT/facilities/automation support that has to be rerouted to another team for resolution
  16. Freezer Excursion from someone other than BSM or Sample Prep
  17. CapEx takes an additional 3 days for approval because of one person
  18. Someone complains about something the lab is doing/wants to do that you can't control
  19. Getting a request via email or in-person and not BenchtopSupport
  20. Created an Install Checklist
  21. Repair consisted of turning instrument on and off again
  22. Someone doesn't mute themselves on a Teams meeting
  23. Equipment delivery is unnecessarily complicated
  24. Any sort of problems with an automatic or manual decapper