Colin'ssafetyoutfitIntegrating3rd partequipmentwithoutsupportRobot makesit to the fieldwith FANUCshipping labelstill onProject issold withoutreach orrate studyCustomerdoes notsend enoughproductCustomerchangespallet patternat FATBAEdeliverslateBill: "I'm tellingyou right now,that's notgonna happen""We'removingto Indy""It wassold thatway""Borrow" apart fromone systemto use onanother"What'sthestandard?""We'vealwaysdone itthat way"Engineersent outon ServicecallSafedistancecalculationsare broughtupBrad isthe firstone with aquestionBrandtwanderingthe shop ona phone callNocommissioningengineer orservice techassignedAaronJones:"Make it agreat day"FATdatemovesONEBASTIANKohler:"Optimize""There'san AOIfor that"OurpreferredsupplierchangesagainIncentivesgetchangedagain.free space:product isout of spec"Do it likewe didon Tesla"8 weekleadtimeHalf ofengineeringhas latetimesheetsSillydrawing onprojectwhiteboardCustomerwants labelsout aftersaying theydidn't care"fix it inthefield"Ludicrouslytall camerastand"I wasn'tthe lastoneonsite..."Colin'ssafetyoutfitIntegrating3rd partequipmentwithoutsupportRobot makesit to the fieldwith FANUCshipping labelstill onProject issold withoutreach orrate studyCustomerdoes notsend enoughproductCustomerchangespallet patternat FATBAEdeliverslateBill: "I'm tellingyou right now,that's notgonna happen""We'removingto Indy""It wassold thatway""Borrow" apart fromone systemto use onanother"What'sthestandard?""We'vealwaysdone itthat way"Engineersent outon ServicecallSafedistancecalculationsare broughtupBrad isthe firstone with aquestionBrandtwanderingthe shop ona phone callNocommissioningengineer orservice techassignedAaronJones:"Make it agreat day"FATdatemovesONEBASTIANKohler:"Optimize""There'san AOIfor that"OurpreferredsupplierchangesagainIncentivesgetchangedagain.free space:product isout of spec"Do it likewe didon Tesla"8 weekleadtimeHalf ofengineeringhas latetimesheetsSillydrawing onprojectwhiteboardCustomerwants labelsout aftersaying theydidn't care"fix it inthefield"Ludicrouslytall camerastand"I wasn'tthe lastoneonsite..."

Untitled Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
  1. Colin's safety outfit
  2. Integrating 3rd part equipment without support
  3. Robot makes it to the field with FANUC shipping label still on
  4. Project is sold without reach or rate study
  5. Customer does not send enough product
  6. Customer changes pallet pattern at FAT
  7. BAE delivers late
  8. Bill: "I'm telling you right now, that's not gonna happen"
  9. "We're moving to Indy"
  10. "It was sold that way"
  11. "Borrow" a part from one system to use on another
  12. "What's the standard?"
  13. "We've always done it that way"
  14. Engineer sent out on Service call
  15. Safe distance calculations are brought up
  16. Brad is the first one with a question
  17. Brandt wandering the shop on a phone call
  18. No commissioning engineer or service tech assigned
  19. Aaron Jones: "Make it a great day"
  20. FAT date moves
  21. ONE BASTIAN
  22. Kohler: "Optimize"
  23. "There's an AOI for that"
  24. Our preferred supplier changes again
  25. Incentives get changed again.
  26. free space: product is out of spec
  27. "Do it like we did on Tesla"
  28. 8 week lead time
  29. Half of engineering has late timesheets
  30. Silly drawing on project whiteboard
  31. Customer wants labels out after saying they didn't care
  32. "fix it in the field"
  33. Ludicrously tall camera stand
  34. "I wasn't the last one onsite..."