When adefect isentered inPFSANDON is a combination ofvisuals, and audio to helpkeep quality in station, andnot allow defective units tomove through the system.The goal is for this to beaccomplished withoutstopping the line.Identifytop losseson aconveyorThe conveyor willstop 5 secs afterbeing tagged inPFS regardless ofwhere unit/carrier islocated.Man,Machine,Method,Material InSystemDamageBe specificas possibleand includeroot cause ifknownAid for operatorin pickingcorrect part forvehicle - mistakeproofingAdding defectsto vehicleswhich don’texist on PFSchecklist.To trackdefects onvehicle usingthe VINnumberPerformanceFeedbackSystem.Train teammembers on theANDON culture andteach them thebenefits of it to theplant when usedproperly.If a persondoes notcomplete theirjob in theallotted cycletime.Establishwhat defectswill be tied toANDONsystemMachinebreakdowns,alarms andcycle timesWhen adefect isentered inPFSFactoryInformationSystemTimedLineStopReal timevisualization ofthe operation ofplant floormachinery /throughputAutomaticLine StopWhen adefect isentered inPFSANDON is a combination ofvisuals, and audio to helpkeep quality in station, andnot allow defective units tomove through the system.The goal is for this to beaccomplished withoutstopping the line.Identifytop losseson aconveyorThe conveyor willstop 5 secs afterbeing tagged inPFS regardless ofwhere unit/carrier islocated.Man,Machine,Method,Material InSystemDamageBe specificas possibleand includeroot cause ifknownAid for operatorin pickingcorrect part forvehicle - mistakeproofingAdding defectsto vehicleswhich don’texist on PFSchecklist.To trackdefects onvehicle usingthe VINnumberPerformanceFeedbackSystem.Train teammembers on theANDON culture andteach them thebenefits of it to theplant when usedproperly.If a persondoes notcomplete theirjob in theallotted cycletime.Establishwhat defectswill be tied toANDONsystemMachinebreakdowns,alarms andcycle timesWhen adefect isentered inPFSFactoryInformationSystemTimedLineStopReal timevisualization ofthe operation ofplant floormachinery /throughputAutomaticLine Stop

AndON, PFS, FIS Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
  1. When a defect is entered in PFS
  2. ANDON is a combination of visuals, and audio to help keep quality in station, and not allow defective units to move through the system. The goal is for this to be accomplished without stopping the line.
  3. Identify top losses on a conveyor
  4. The conveyor will stop 5 secs after being tagged in PFS regardless of where unit/carrier is located.
  5. Man, Machine, Method, Material
  6. In System Damage
  7. Be specific as possible and include root cause if known
  8. Aid for operator in picking correct part for vehicle - mistake proofing
  9. Adding defects to vehicles which don’t exist on PFS checklist.
  10. To track defects on vehicle using the VIN number
  11. Performance Feedback System.
  12. Train team members on the ANDON culture and teach them the benefits of it to the plant when used properly.
  13. If a person does not complete their job in the allotted cycle time.
  14. Establish what defects will be tied to ANDON system
  15. Machine breakdowns, alarms and cycle times
  16. When a defect is entered in PFS
  17. Factory Information System
  18. Timed Line Stop
  19. Real time visualization of the operation of plant floor machinery / throughput
  20. Automatic Line Stop