Aid for operatorin pickingcorrect part forvehicle - mistakeproofingANDON is a combination ofvisuals, and audio to helpkeep quality in station, andnot allow defective units tomove through the system.The goal is for this to beaccomplished withoutstopping the line.Machinebreakdowns,alarms andcycle timesTo trackdefects onvehicle usingthe VINnumberIf a persondoes notcomplete theirjob in theallotted cycletime.When adefect isentered inPFSFactoryInformationSystemEstablishwhat defectswill be tied toANDONsystemAdding defectsto vehicleswhich don’texist on PFSchecklist.TimedLineStopThe conveyor willstop 5 secs afterbeing tagged inPFS regardless ofwhere unit/carrier islocated.Train teammembers on theANDON culture andteach them thebenefits of it to theplant when usedproperly.PerformanceFeedbackSystem.Man,Machine,Method,Material Be specificas possibleand includeroot cause ifknownAutomaticLine StopInSystemDamageReal timevisualization ofthe operation ofplant floormachinery /throughputWhen adefect isentered inPFSIdentifytop losseson aconveyorAid for operatorin pickingcorrect part forvehicle - mistakeproofingANDON is a combination ofvisuals, and audio to helpkeep quality in station, andnot allow defective units tomove through the system.The goal is for this to beaccomplished withoutstopping the line.Machinebreakdowns,alarms andcycle timesTo trackdefects onvehicle usingthe VINnumberIf a persondoes notcomplete theirjob in theallotted cycletime.When adefect isentered inPFSFactoryInformationSystemEstablishwhat defectswill be tied toANDONsystemAdding defectsto vehicleswhich don’texist on PFSchecklist.TimedLineStopThe conveyor willstop 5 secs afterbeing tagged inPFS regardless ofwhere unit/carrier islocated.Train teammembers on theANDON culture andteach them thebenefits of it to theplant when usedproperly.PerformanceFeedbackSystem.Man,Machine,Method,Material Be specificas possibleand includeroot cause ifknownAutomaticLine StopInSystemDamageReal timevisualization ofthe operation ofplant floormachinery /throughputWhen adefect isentered inPFSIdentifytop losseson aconveyor

AndON, PFS, FIS Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
  1. Aid for operator in picking correct part for vehicle - mistake proofing
  2. ANDON is a combination of visuals, and audio to help keep quality in station, and not allow defective units to move through the system. The goal is for this to be accomplished without stopping the line.
  3. Machine breakdowns, alarms and cycle times
  4. To track defects on vehicle using the VIN number
  5. If a person does not complete their job in the allotted cycle time.
  6. When a defect is entered in PFS
  7. Factory Information System
  8. Establish what defects will be tied to ANDON system
  9. Adding defects to vehicles which don’t exist on PFS checklist.
  10. Timed Line Stop
  11. The conveyor will stop 5 secs after being tagged in PFS regardless of where unit/carrier is located.
  12. Train team members on the ANDON culture and teach them the benefits of it to the plant when used properly.
  13. Performance Feedback System.
  14. Man, Machine, Method, Material
  15. Be specific as possible and include root cause if known
  16. Automatic Line Stop
  17. In System Damage
  18. Real time visualization of the operation of plant floor machinery / throughput
  19. When a defect is entered in PFS
  20. Identify top losses on a conveyor