Train teammembers on theANDON culture andteach them thebenefits of it to theplant when usedproperly.Be specificas possibleand includeroot cause ifknownThe conveyor willstop 5 secs afterbeing tagged inPFS regardless ofwhere unit/carrier islocated.To trackdefects onvehicle usingthe VINnumberWhen adefect isentered inPFSMachinebreakdowns,alarms andcycle timesTimedLineStopAutomaticLine StopReal timevisualization ofthe operation ofplant floormachinery /throughputPerformanceFeedbackSystem.InSystemDamageEstablishwhat defectswill be tied toANDONsystemANDON is a combination ofvisuals, and audio to helpkeep quality in station, andnot allow defective units tomove through the system.The goal is for this to beaccomplished withoutstopping the line.Identifytop losseson aconveyorAdding defectsto vehicleswhich don’texist on PFSchecklist.If a persondoes notcomplete theirjob in theallotted cycletime.FactoryInformationSystemWhen adefect isentered inPFSMan,Machine,Method,Material Aid for operatorin pickingcorrect part forvehicle - mistakeproofingTrain teammembers on theANDON culture andteach them thebenefits of it to theplant when usedproperly.Be specificas possibleand includeroot cause ifknownThe conveyor willstop 5 secs afterbeing tagged inPFS regardless ofwhere unit/carrier islocated.To trackdefects onvehicle usingthe VINnumberWhen adefect isentered inPFSMachinebreakdowns,alarms andcycle timesTimedLineStopAutomaticLine StopReal timevisualization ofthe operation ofplant floormachinery /throughputPerformanceFeedbackSystem.InSystemDamageEstablishwhat defectswill be tied toANDONsystemANDON is a combination ofvisuals, and audio to helpkeep quality in station, andnot allow defective units tomove through the system.The goal is for this to beaccomplished withoutstopping the line.Identifytop losseson aconveyorAdding defectsto vehicleswhich don’texist on PFSchecklist.If a persondoes notcomplete theirjob in theallotted cycletime.FactoryInformationSystemWhen adefect isentered inPFSMan,Machine,Method,Material Aid for operatorin pickingcorrect part forvehicle - mistakeproofing

AndON, PFS, FIS Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
  1. Train team members on the ANDON culture and teach them the benefits of it to the plant when used properly.
  2. Be specific as possible and include root cause if known
  3. The conveyor will stop 5 secs after being tagged in PFS regardless of where unit/carrier is located.
  4. To track defects on vehicle using the VIN number
  5. When a defect is entered in PFS
  6. Machine breakdowns, alarms and cycle times
  7. Timed Line Stop
  8. Automatic Line Stop
  9. Real time visualization of the operation of plant floor machinery / throughput
  10. Performance Feedback System.
  11. In System Damage
  12. Establish what defects will be tied to ANDON system
  13. ANDON is a combination of visuals, and audio to help keep quality in station, and not allow defective units to move through the system. The goal is for this to be accomplished without stopping the line.
  14. Identify top losses on a conveyor
  15. Adding defects to vehicles which don’t exist on PFS checklist.
  16. If a person does not complete their job in the allotted cycle time.
  17. Factory Information System
  18. When a defect is entered in PFS
  19. Man, Machine, Method, Material
  20. Aid for operator in picking correct part for vehicle - mistake proofing