(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Timed Line Stop
To track defects on vehicle using the VIN number
Automatic Line Stop
Train team members on the ANDON culture and teach them the benefits of it to the plant when used properly.
Man, Machine, Method, Material
Performance Feedback System.
Adding defects to vehicles which don’t exist on PFS checklist.
Factory Information System
Be specific as possible and include root cause if known
Real time visualization of the operation of plant floor machinery / throughput
If a person does not complete their job in the allotted cycle time.
Aid for operator in picking correct part for vehicle - mistake proofing
Machine breakdowns, alarms and cycle times
Identify top losses on a conveyor
ANDON is a combination of visuals, and audio to help keep quality in station, and not allow defective units to move through the system. The goal is for this to be accomplished without stopping the line.
Establish what defects will be tied to ANDON system
When a defect is entered in PFS
In System Damage
When a defect is entered in PFS
The conveyor will stop 5 secs after being tagged in PFS regardless of where unit/carrier is located.