(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
When a defect is entered in PFS
Machine breakdowns, alarms and cycle times
The conveyor will stop 5 secs after being tagged in PFS regardless of where unit/carrier is located.
To track defects on vehicle using the VIN number
Aid for operator in picking correct part for vehicle - mistake proofing
Establish what defects will be tied to ANDON system
Factory Information System
Performance Feedback System.
Adding defects to vehicles which don’t exist on PFS checklist.
Identify top losses on a conveyor
In System Damage
When a defect is entered in PFS
If a person does not complete their job in the allotted cycle time.
Train team members on the ANDON culture and teach them the benefits of it to the plant when used properly.
Timed Line Stop
ANDON is a combination of visuals, and audio to help keep quality in station, and not allow defective units to move through the system. The goal is for this to be accomplished without stopping the line.
Real time visualization of the operation of plant floor machinery / throughput
Automatic Line Stop
Be specific as possible and include root cause if known