TimedLineStopTo trackdefects onvehicle usingthe VINnumberAutomaticLine StopTrain teammembers on theANDON culture andteach them thebenefits of it to theplant when usedproperly.Man,Machine,Method,Material PerformanceFeedbackSystem.Adding defectsto vehicleswhich don’texist on PFSchecklist.FactoryInformationSystemBe specificas possibleand includeroot cause ifknownReal timevisualization ofthe operation ofplant floormachinery /throughputIf a persondoes notcomplete theirjob in theallotted cycletime.Aid for operatorin pickingcorrect part forvehicle - mistakeproofingMachinebreakdowns,alarms andcycle timesIdentifytop losseson aconveyorANDON is a combination ofvisuals, and audio to helpkeep quality in station, andnot allow defective units tomove through the system.The goal is for this to beaccomplished withoutstopping the line.Establishwhat defectswill be tied toANDONsystemWhen adefect isentered inPFSInSystemDamageWhen adefect isentered inPFSThe conveyor willstop 5 secs afterbeing tagged inPFS regardless ofwhere unit/carrier islocated.TimedLineStopTo trackdefects onvehicle usingthe VINnumberAutomaticLine StopTrain teammembers on theANDON culture andteach them thebenefits of it to theplant when usedproperly.Man,Machine,Method,Material PerformanceFeedbackSystem.Adding defectsto vehicleswhich don’texist on PFSchecklist.FactoryInformationSystemBe specificas possibleand includeroot cause ifknownReal timevisualization ofthe operation ofplant floormachinery /throughputIf a persondoes notcomplete theirjob in theallotted cycletime.Aid for operatorin pickingcorrect part forvehicle - mistakeproofingMachinebreakdowns,alarms andcycle timesIdentifytop losseson aconveyorANDON is a combination ofvisuals, and audio to helpkeep quality in station, andnot allow defective units tomove through the system.The goal is for this to beaccomplished withoutstopping the line.Establishwhat defectswill be tied toANDONsystemWhen adefect isentered inPFSInSystemDamageWhen adefect isentered inPFSThe conveyor willstop 5 secs afterbeing tagged inPFS regardless ofwhere unit/carrier islocated.

AndON, PFS, FIS Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
  1. Timed Line Stop
  2. To track defects on vehicle using the VIN number
  3. Automatic Line Stop
  4. Train team members on the ANDON culture and teach them the benefits of it to the plant when used properly.
  5. Man, Machine, Method, Material
  6. Performance Feedback System.
  7. Adding defects to vehicles which don’t exist on PFS checklist.
  8. Factory Information System
  9. Be specific as possible and include root cause if known
  10. Real time visualization of the operation of plant floor machinery / throughput
  11. If a person does not complete their job in the allotted cycle time.
  12. Aid for operator in picking correct part for vehicle - mistake proofing
  13. Machine breakdowns, alarms and cycle times
  14. Identify top losses on a conveyor
  15. ANDON is a combination of visuals, and audio to help keep quality in station, and not allow defective units to move through the system. The goal is for this to be accomplished without stopping the line.
  16. Establish what defects will be tied to ANDON system
  17. When a defect is entered in PFS
  18. In System Damage
  19. When a defect is entered in PFS
  20. The conveyor will stop 5 secs after being tagged in PFS regardless of where unit/carrier is located.