Establishwhat defectswill be tied toANDONsystemIdentifytop losseson aconveyorMachinebreakdowns,alarms andcycle timesInSystemDamageThe conveyor willstop 5 secs afterbeing tagged inPFS regardless ofwhere unit/carrier islocated.FactoryInformationSystemANDON is a combination ofvisuals, and audio to helpkeep quality in station, andnot allow defective units tomove through the system.The goal is for this to beaccomplished withoutstopping the line.Real timevisualization ofthe operation ofplant floormachinery /throughputWhen adefect isentered inPFSIf a persondoes notcomplete theirjob in theallotted cycletime.Man,Machine,Method,Material Adding defectsto vehicleswhich don’texist on PFSchecklist.When adefect isentered inPFSTrain teammembers on theANDON culture andteach them thebenefits of it to theplant when usedproperly.Be specificas possibleand includeroot cause ifknownTimedLineStopPerformanceFeedbackSystem.Aid for operatorin pickingcorrect part forvehicle - mistakeproofingTo trackdefects onvehicle usingthe VINnumberAutomaticLine StopEstablishwhat defectswill be tied toANDONsystemIdentifytop losseson aconveyorMachinebreakdowns,alarms andcycle timesInSystemDamageThe conveyor willstop 5 secs afterbeing tagged inPFS regardless ofwhere unit/carrier islocated.FactoryInformationSystemANDON is a combination ofvisuals, and audio to helpkeep quality in station, andnot allow defective units tomove through the system.The goal is for this to beaccomplished withoutstopping the line.Real timevisualization ofthe operation ofplant floormachinery /throughputWhen adefect isentered inPFSIf a persondoes notcomplete theirjob in theallotted cycletime.Man,Machine,Method,Material Adding defectsto vehicleswhich don’texist on PFSchecklist.When adefect isentered inPFSTrain teammembers on theANDON culture andteach them thebenefits of it to theplant when usedproperly.Be specificas possibleand includeroot cause ifknownTimedLineStopPerformanceFeedbackSystem.Aid for operatorin pickingcorrect part forvehicle - mistakeproofingTo trackdefects onvehicle usingthe VINnumberAutomaticLine Stop

AndON, PFS, FIS Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
  1. Establish what defects will be tied to ANDON system
  2. Identify top losses on a conveyor
  3. Machine breakdowns, alarms and cycle times
  4. In System Damage
  5. The conveyor will stop 5 secs after being tagged in PFS regardless of where unit/carrier is located.
  6. Factory Information System
  7. ANDON is a combination of visuals, and audio to help keep quality in station, and not allow defective units to move through the system. The goal is for this to be accomplished without stopping the line.
  8. Real time visualization of the operation of plant floor machinery / throughput
  9. When a defect is entered in PFS
  10. If a person does not complete their job in the allotted cycle time.
  11. Man, Machine, Method, Material
  12. Adding defects to vehicles which don’t exist on PFS checklist.
  13. When a defect is entered in PFS
  14. Train team members on the ANDON culture and teach them the benefits of it to the plant when used properly.
  15. Be specific as possible and include root cause if known
  16. Timed Line Stop
  17. Performance Feedback System.
  18. Aid for operator in picking correct part for vehicle - mistake proofing
  19. To track defects on vehicle using the VIN number
  20. Automatic Line Stop