Story addedin the middleof the sprint"Let'sskip theretro"Operatingdirectlyon the DBUnderestimatedOverestimatedPR hasno tech-debtaddressed"I'm stillwaiting forreview" :(Story hasnoacceptancecriteriaStorygotblockedPR hasnotestsStorymergedwithoutacceptance"Test env isvery differentfromProductionfor this"Storymergedwithout codereview"Let'sskipstandup"Backlogis notprioritized"You haveto talkwithDevOps"Story hasnodescriptionPushingdirectly tomainbranchWe brokeProductionPR has nodescriptionStoryremoved inthe middle ofthe sprintUnansweredcommentsin storyChangedestimationtypeOvercommittingStory addedin the middleof the sprint"Let'sskip theretro"Operatingdirectlyon the DBUnderestimatedOverestimatedPR hasno tech-debtaddressed"I'm stillwaiting forreview" :(Story hasnoacceptancecriteriaStorygotblockedPR hasnotestsStorymergedwithoutacceptance"Test env isvery differentfromProductionfor this"Storymergedwithout codereview"Let'sskipstandup"Backlogis notprioritized"You haveto talkwithDevOps"Story hasnodescriptionPushingdirectly tomainbranchWe brokeProductionPR has nodescriptionStoryremoved inthe middle ofthe sprintUnansweredcommentsin storyChangedestimationtypeOvercommitting

Agility Checkup Bingo! - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. Story added in the middle of the sprint
  2. "Let's skip the retro"
  3. Operating directly on the DB
  4. Underestimated
  5. Overestimated
  6. PR has no tech-debt addressed
  7. "I'm still waiting for review" :(
  8. Story has no acceptance criteria
  9. Story got blocked
  10. PR has no tests
  11. Story merged without acceptance
  12. "Test env is very different from Production for this"
  13. Story merged without code review
  14. "Let's skip standup"
  15. Backlog is not prioritized
  16. "You have to talk with DevOps"
  17. Story has no description
  18. Pushing directly to main branch
  19. We broke Production
  20. PR has no description
  21. Story removed in the middle of the sprint
  22. Unanswered comments in story
  23. Changed estimation type
  24. Overcommitting