ChangedestimationtypeStory hasnodescriptionStorygotblockedStoryremoved inthe middle ofthe sprintPushingdirectly tomainbranch"I'm stillwaiting forreview" :(Story hasnoacceptancecriteria"Test env isvery differentfromProductionfor this""Let'sskipstandup"UnderestimatedWe brokeProductionStorymergedwithout codereviewPR has nodescriptionBacklogis notprioritizedPR hasnotests"Let'sskip theretro"OverestimatedPR hasno tech-debtaddressed"You haveto talkwithDevOps"Operatingdirectlyon the DBStorymergedwithoutacceptanceOvercommittingStory addedin the middleof the sprintUnansweredcommentsin storyChangedestimationtypeStory hasnodescriptionStorygotblockedStoryremoved inthe middle ofthe sprintPushingdirectly tomainbranch"I'm stillwaiting forreview" :(Story hasnoacceptancecriteria"Test env isvery differentfromProductionfor this""Let'sskipstandup"UnderestimatedWe brokeProductionStorymergedwithout codereviewPR has nodescriptionBacklogis notprioritizedPR hasnotests"Let'sskip theretro"OverestimatedPR hasno tech-debtaddressed"You haveto talkwithDevOps"Operatingdirectlyon the DBStorymergedwithoutacceptanceOvercommittingStory addedin the middleof the sprintUnansweredcommentsin story

Agility Checkup Bingo! - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. Changed estimation type
  2. Story has no description
  3. Story got blocked
  4. Story removed in the middle of the sprint
  5. Pushing directly to main branch
  6. "I'm still waiting for review" :(
  7. Story has no acceptance criteria
  8. "Test env is very different from Production for this"
  9. "Let's skip standup"
  10. Underestimated
  11. We broke Production
  12. Story merged without code review
  13. PR has no description
  14. Backlog is not prioritized
  15. PR has no tests
  16. "Let's skip the retro"
  17. Overestimated
  18. PR has no tech-debt addressed
  19. "You have to talk with DevOps"
  20. Operating directly on the DB
  21. Story merged without acceptance
  22. Overcommitting
  23. Story added in the middle of the sprint
  24. Unanswered comments in story