Storyremoved inthe middle ofthe sprintStorygotblockedStory hasnodescriptionPR hasno tech-debtaddressedPushingdirectly tomainbranch"Test env isvery differentfromProductionfor this"Unansweredcommentsin storyChangedestimationtypeUnderestimated"I'm stillwaiting forreview" :(Story hasnoacceptancecriteria"Let'sskipstandup"Backlogis notprioritizedStorymergedwithoutacceptanceWe brokeProductionOvercommittingStorymergedwithout codereviewOperatingdirectlyon the DBPR hasnotests"Let'sskip theretro"Story addedin the middleof the sprintPR has nodescription"You haveto talkwithDevOps"OverestimatedStoryremoved inthe middle ofthe sprintStorygotblockedStory hasnodescriptionPR hasno tech-debtaddressedPushingdirectly tomainbranch"Test env isvery differentfromProductionfor this"Unansweredcommentsin storyChangedestimationtypeUnderestimated"I'm stillwaiting forreview" :(Story hasnoacceptancecriteria"Let'sskipstandup"Backlogis notprioritizedStorymergedwithoutacceptanceWe brokeProductionOvercommittingStorymergedwithout codereviewOperatingdirectlyon the DBPR hasnotests"Let'sskip theretro"Story addedin the middleof the sprintPR has nodescription"You haveto talkwithDevOps"Overestimated

Agility Checkup Bingo! - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. Story removed in the middle of the sprint
  2. Story got blocked
  3. Story has no description
  4. PR has no tech-debt addressed
  5. Pushing directly to main branch
  6. "Test env is very different from Production for this"
  7. Unanswered comments in story
  8. Changed estimation type
  9. Underestimated
  10. "I'm still waiting for review" :(
  11. Story has no acceptance criteria
  12. "Let's skip standup"
  13. Backlog is not prioritized
  14. Story merged without acceptance
  15. We broke Production
  16. Overcommitting
  17. Story merged without code review
  18. Operating directly on the DB
  19. PR has no tests
  20. "Let's skip the retro"
  21. Story added in the middle of the sprint
  22. PR has no description
  23. "You have to talk with DevOps"
  24. Overestimated