Overestimated"I'm stillwaiting forreview" :(PR has nodescriptionPR hasnotestsStorymergedwithout codereviewUnansweredcommentsin storyUnderestimated"You haveto talkwithDevOps"Backlogis notprioritizedStorygotblockedStory hasnodescription"Let'sskip theretro""Test env isvery differentfromProductionfor this"OvercommittingPushingdirectly tomainbranchStory hasnoacceptancecriteriaStorymergedwithoutacceptanceOperatingdirectlyon the DBChangedestimationtypeWe brokeProductionStory addedin the middleof the sprint"Let'sskipstandup"Storyremoved inthe middle ofthe sprintPR hasno tech-debtaddressedOverestimated"I'm stillwaiting forreview" :(PR has nodescriptionPR hasnotestsStorymergedwithout codereviewUnansweredcommentsin storyUnderestimated"You haveto talkwithDevOps"Backlogis notprioritizedStorygotblockedStory hasnodescription"Let'sskip theretro""Test env isvery differentfromProductionfor this"OvercommittingPushingdirectly tomainbranchStory hasnoacceptancecriteriaStorymergedwithoutacceptanceOperatingdirectlyon the DBChangedestimationtypeWe brokeProductionStory addedin the middleof the sprint"Let'sskipstandup"Storyremoved inthe middle ofthe sprintPR hasno tech-debtaddressed

Agility Checkup Bingo! - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. Overestimated
  2. "I'm still waiting for review" :(
  3. PR has no description
  4. PR has no tests
  5. Story merged without code review
  6. Unanswered comments in story
  7. Underestimated
  8. "You have to talk with DevOps"
  9. Backlog is not prioritized
  10. Story got blocked
  11. Story has no description
  12. "Let's skip the retro"
  13. "Test env is very different from Production for this"
  14. Overcommitting
  15. Pushing directly to main branch
  16. Story has no acceptance criteria
  17. Story merged without acceptance
  18. Operating directly on the DB
  19. Changed estimation type
  20. We broke Production
  21. Story added in the middle of the sprint
  22. "Let's skip standup"
  23. Story removed in the middle of the sprint
  24. PR has no tech-debt addressed