Pushingdirectly tomainbranch"You haveto talkwithDevOps"OvercommittingUnansweredcommentsin story"Let'sskipstandup"PR has nodescriptionBacklogis notprioritizedStory hasnodescriptionStorymergedwithout codereviewStory hasnoacceptancecriteriaStorygotblockedWe brokeProductionChangedestimationtypeStorymergedwithoutacceptanceOverestimatedStory addedin the middleof the sprintUnderestimated"Let'sskip theretro""I'm stillwaiting forreview" :("Test env isvery differentfromProductionfor this"Storyremoved inthe middle ofthe sprintOperatingdirectlyon the DBPR hasno tech-debtaddressedPR hasnotestsPushingdirectly tomainbranch"You haveto talkwithDevOps"OvercommittingUnansweredcommentsin story"Let'sskipstandup"PR has nodescriptionBacklogis notprioritizedStory hasnodescriptionStorymergedwithout codereviewStory hasnoacceptancecriteriaStorygotblockedWe brokeProductionChangedestimationtypeStorymergedwithoutacceptanceOverestimatedStory addedin the middleof the sprintUnderestimated"Let'sskip theretro""I'm stillwaiting forreview" :("Test env isvery differentfromProductionfor this"Storyremoved inthe middle ofthe sprintOperatingdirectlyon the DBPR hasno tech-debtaddressedPR hasnotests

Agility Checkup Bingo! - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. Pushing directly to main branch
  2. "You have to talk with DevOps"
  3. Overcommitting
  4. Unanswered comments in story
  5. "Let's skip standup"
  6. PR has no description
  7. Backlog is not prioritized
  8. Story has no description
  9. Story merged without code review
  10. Story has no acceptance criteria
  11. Story got blocked
  12. We broke Production
  13. Changed estimation type
  14. Story merged without acceptance
  15. Overestimated
  16. Story added in the middle of the sprint
  17. Underestimated
  18. "Let's skip the retro"
  19. "I'm still waiting for review" :(
  20. "Test env is very different from Production for this"
  21. Story removed in the middle of the sprint
  22. Operating directly on the DB
  23. PR has no tech-debt addressed
  24. PR has no tests