PR hasnotestsStory hasnoacceptancecriteriaStorymergedwithoutacceptanceUnansweredcommentsin storyStorygotblockedStory addedin the middleof the sprintUnderestimatedBacklogis notprioritized"Let'sskipstandup"Operatingdirectlyon the DB"I'm stillwaiting forreview" :(PR hasno tech-debtaddressedStory hasnodescriptionPR has nodescriptionOverestimatedPushingdirectly tomainbranchStoryremoved inthe middle ofthe sprintOvercommitting"Let'sskip theretro"Storymergedwithout codereview"Test env isvery differentfromProductionfor this"Changedestimationtype"You haveto talkwithDevOps"We brokeProductionPR hasnotestsStory hasnoacceptancecriteriaStorymergedwithoutacceptanceUnansweredcommentsin storyStorygotblockedStory addedin the middleof the sprintUnderestimatedBacklogis notprioritized"Let'sskipstandup"Operatingdirectlyon the DB"I'm stillwaiting forreview" :(PR hasno tech-debtaddressedStory hasnodescriptionPR has nodescriptionOverestimatedPushingdirectly tomainbranchStoryremoved inthe middle ofthe sprintOvercommitting"Let'sskip theretro"Storymergedwithout codereview"Test env isvery differentfromProductionfor this"Changedestimationtype"You haveto talkwithDevOps"We brokeProduction

Agility Checkup Bingo! - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. PR has no tests
  2. Story has no acceptance criteria
  3. Story merged without acceptance
  4. Unanswered comments in story
  5. Story got blocked
  6. Story added in the middle of the sprint
  7. Underestimated
  8. Backlog is not prioritized
  9. "Let's skip standup"
  10. Operating directly on the DB
  11. "I'm still waiting for review" :(
  12. PR has no tech-debt addressed
  13. Story has no description
  14. PR has no description
  15. Overestimated
  16. Pushing directly to main branch
  17. Story removed in the middle of the sprint
  18. Overcommitting
  19. "Let's skip the retro"
  20. Story merged without code review
  21. "Test env is very different from Production for this"
  22. Changed estimation type
  23. "You have to talk with DevOps"
  24. We broke Production