FIREALARMSBEINGTESTEDMDF TO IDFFIBER NOTCOMPLETEORMISSINGINCORRECTCOPIERPOWERNO MDFCOOLINGNO MDFPOWERWHEN WEARRIVENOTENOUGHNETWORKDROPS INOFFICEPATCHCABLEISSUESPATCHEDMDF FORUSGYM A/VSYSTEMMISSINGNOPATCHPANELLABELSINCORRECTUPS POWEROBSCUREPAGINGSYSTEMISSUESOMETHINGLOST INSHIPPINGNEW NSOPROJECTOUT OFNOWHEREPAGINGSYSTEMISPERFECTIDFCABINET12FTHIGHDRYWALLFINISHEDBEFOREA/VCABLINGNOPOWERISSUESMDFCOVEREDINDRYWALLDUSTPAGINGAMPS NOTINSTALLEDCLEANMDFINCORRECTAPPLACEMENTWORKROOMNETWORKDROPPROBLEMSSUB-SUBCONTRACTORFIREALARMSBEINGTESTEDMDF TO IDFFIBER NOTCOMPLETEORMISSINGINCORRECTCOPIERPOWERNO MDFCOOLINGNO MDFPOWERWHEN WEARRIVENOTENOUGHNETWORKDROPS INOFFICEPATCHCABLEISSUESPATCHEDMDF FORUSGYM A/VSYSTEMMISSINGNOPATCHPANELLABELSINCORRECTUPS POWEROBSCUREPAGINGSYSTEMISSUESOMETHINGLOST INSHIPPINGNEW NSOPROJECTOUT OFNOWHEREPAGINGSYSTEMISPERFECTIDFCABINET12FTHIGHDRYWALLFINISHEDBEFOREA/VCABLINGNOPOWERISSUESMDFCOVEREDINDRYWALLDUSTPAGINGAMPS NOTINSTALLEDCLEANMDFINCORRECTAPPLACEMENTWORKROOMNETWORKDROPPROBLEMSSUB-SUBCONTRACTOR

NHA NSO BINGO - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. FIRE ALARMS BEING TESTED
  2. MDF TO IDF FIBER NOT COMPLETE OR MISSING
  3. INCORRECT COPIER POWER
  4. NO MDF COOLING
  5. NO MDF POWER WHEN WE ARRIVE
  6. NOT ENOUGH NETWORK DROPS IN OFFICE
  7. PATCH CABLE ISSUES
  8. PATCHED MDF FOR US
  9. GYM A/V SYSTEM MISSING
  10. NO PATCH PANEL LABELS
  11. INCORRECT UPS POWER
  12. OBSCURE PAGING SYSTEM ISSUE
  13. SOMETHING LOST IN SHIPPING
  14. NEW NSO PROJECT OUT OF NOWHERE
  15. PAGING SYSTEM IS PERFECT
  16. IDF CABINET 12FT HIGH
  17. DRYWALL FINISHED BEFORE A/V CABLING
  18. NO POWER ISSUES
  19. MDF COVERED IN DRYWALL DUST
  20. PAGING AMPS NOT INSTALLED
  21. CLEAN MDF
  22. INCORRECT AP PLACEMENT
  23. WORKROOM NETWORK DROP PROBLEMS
  24. SUB-SUB CONTRACTOR