Had 0 appsrequireround 2+revisionsScheduled atraining withJosh Gibsonafter gettingrevisions backMarkingup PolesAvg Time:<15 mins3 apps passed QCat 100% on initialQC round Project/App:____Project/App:____Project/App:____WE 9/23:Avg time perrevised pole<5 mins<100revisedpoles forthe month List the 3pillars onthe backSubmitted timetracker on time9/2:________9/10:________9/17:________9/24:________ Complimentedanother co-worker withinIPE regardingtheir work,leadership, etc.Completedall assignedtoolbox talksWhat is theOSP PolesReleased goalfor FY21?A:_________1 app (25 poles)passed QC at100% on initial QCround Project: ______App: _______WE 9/16:<5 groundstreetlighterrorsMet polegoal of 135w/ <25revisedpolesMet pole goalof 110 w/orevised poles WE: ________UsedMidAmAutomationfor all apps <2 hours Avgtime on sheets9/2:_________9/10:________9/17:________9/24:________ WE 9/9: <5drip loopserrors fromQCWorked 5full 8 hourdaysMake a(reasonable)suggestion to helpimprove quality(Ryan, Josh, orBrittany)Met polegoal of 110w/ <25revisedpolesHad 0timesheeterrors thewhole monthMet pole goalof 135 w/orevised poles WE: _______Engineered atleast 440 polesfor the month(Doesn't includerevised poles)Had 0 appsrequireround 2+revisionsScheduled atraining withJosh Gibsonafter gettingrevisions backMarkingup PolesAvg Time:<15 mins3 apps passed QCat 100% on initialQC round Project/App:____Project/App:____Project/App:____WE 9/23:Avg time perrevised pole<5 mins<100revisedpoles forthe month List the 3pillars onthe backSubmitted timetracker on time9/2:________9/10:________9/17:________9/24:________ Complimentedanother co-worker withinIPE regardingtheir work,leadership, etc.Completedall assignedtoolbox talksWhat is theOSP PolesReleased goalfor FY21?A:_________1 app (25 poles)passed QC at100% on initial QCround Project: ______App: _______WE 9/16:<5 groundstreetlighterrorsMet polegoal of 135w/ <25revisedpolesMet pole goalof 110 w/orevised poles WE: ________UsedMidAmAutomationfor all apps <2 hours Avgtime on sheets9/2:_________9/10:________9/17:________9/24:________ WE 9/9: <5drip loopserrors fromQCWorked 5full 8 hourdaysMake a(reasonable)suggestion to helpimprove quality(Ryan, Josh, orBrittany)Met polegoal of 110w/ <25revisedpolesHad 0timesheeterrors thewhole monthMet pole goalof 135 w/orevised poles WE: _______Engineered atleast 440 polesfor the month(Doesn't includerevised poles)

Metronet IPE Bingo (September 2021) - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. Had 0 apps require round 2+ revisions
  2. Scheduled a training with Josh Gibson after getting revisions back
  3. Marking up Poles Avg Time: <15 mins
  4. 3 apps passed QC at 100% on initial QC round Project/App:____ Project/App:____ Project/App:____
  5. WE 9/23: Avg time per revised pole <5 mins
  6. <100 revised poles for the month
  7. List the 3 pillars on the back
  8. Submitted time tracker on time 9/2:________ 9/10:________ 9/17:________ 9/24:________
  9. Complimented another co-worker within IPE regarding their work, leadership, etc.
  10. Completed all assigned toolbox talks
  11. What is the OSP Poles Released goal for FY21? A:_________
  12. 1 app (25 poles) passed QC at 100% on initial QC round Project: ______ App: _______
  13. WE 9/16: <5 ground streetlight errors
  14. Met pole goal of 135 w/ <25 revised poles
  15. Met pole goal of 110 w/o revised poles WE: ________
  16. Used MidAm Automation for all apps
  17. <2 hours Avg time on sheets 9/2:_________ 9/10:________ 9/17:________ 9/24:________
  18. WE 9/9: <5 drip loops errors from QC
  19. Worked 5 full 8 hour days
  20. Make a (reasonable) suggestion to help improve quality (Ryan, Josh, or Brittany)
  21. Met pole goal of 110 w/ <25 revised poles
  22. Had 0 timesheet errors the whole month
  23. Met pole goal of 135 w/o revised poles WE: _______
  24. Engineered at least 440 poles for the month (Doesn't include revised poles)