<2 hours Avgtime on sheets9/2:_________9/10:________9/17:________9/24:________ Scheduled atraining withJosh Gibsonafter gettingrevisions backUsedMidAmAutomationfor all apps Complimentedanother co-worker withinIPE regardingtheir work,leadership, etc.Markingup PolesAvg Time:<15 minsHad 0timesheeterrors thewhole monthWE 9/23:Avg time perrevised pole<5 minsList the 3pillars onthe backWE 9/16:<5 groundstreetlighterrors1 app (25 poles)passed QC at100% on initial QCround Project: ______App: _______Make a(reasonable)suggestion to helpimprove quality(Ryan, Josh, orBrittany)Met polegoal of 135w/ <25revisedpolesCompletedall assignedtoolbox talksMet pole goalof 135 w/orevised poles WE: _______WE 9/9: <5drip loopserrors fromQCMet polegoal of 110w/ <25revisedpoles<100revisedpoles forthe month 3 apps passed QCat 100% on initialQC round Project/App:____Project/App:____Project/App:____Submitted timetracker on time9/2:________9/10:________9/17:________9/24:________ Worked 5full 8 hourdaysHad 0 appsrequireround 2+revisionsEngineered atleast 440 polesfor the month(Doesn't includerevised poles)Met pole goalof 110 w/orevised poles WE: ________What is theOSP PolesReleased goalfor FY21?A:_________<2 hours Avgtime on sheets9/2:_________9/10:________9/17:________9/24:________ Scheduled atraining withJosh Gibsonafter gettingrevisions backUsedMidAmAutomationfor all apps Complimentedanother co-worker withinIPE regardingtheir work,leadership, etc.Markingup PolesAvg Time:<15 minsHad 0timesheeterrors thewhole monthWE 9/23:Avg time perrevised pole<5 minsList the 3pillars onthe backWE 9/16:<5 groundstreetlighterrors1 app (25 poles)passed QC at100% on initial QCround Project: ______App: _______Make a(reasonable)suggestion to helpimprove quality(Ryan, Josh, orBrittany)Met polegoal of 135w/ <25revisedpolesCompletedall assignedtoolbox talksMet pole goalof 135 w/orevised poles WE: _______WE 9/9: <5drip loopserrors fromQCMet polegoal of 110w/ <25revisedpoles<100revisedpoles forthe month 3 apps passed QCat 100% on initialQC round Project/App:____Project/App:____Project/App:____Submitted timetracker on time9/2:________9/10:________9/17:________9/24:________ Worked 5full 8 hourdaysHad 0 appsrequireround 2+revisionsEngineered atleast 440 polesfor the month(Doesn't includerevised poles)Met pole goalof 110 w/orevised poles WE: ________What is theOSP PolesReleased goalfor FY21?A:_________

Metronet IPE Bingo (September 2021) - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. <2 hours Avg time on sheets 9/2:_________ 9/10:________ 9/17:________ 9/24:________
  2. Scheduled a training with Josh Gibson after getting revisions back
  3. Used MidAm Automation for all apps
  4. Complimented another co-worker within IPE regarding their work, leadership, etc.
  5. Marking up Poles Avg Time: <15 mins
  6. Had 0 timesheet errors the whole month
  7. WE 9/23: Avg time per revised pole <5 mins
  8. List the 3 pillars on the back
  9. WE 9/16: <5 ground streetlight errors
  10. 1 app (25 poles) passed QC at 100% on initial QC round Project: ______ App: _______
  11. Make a (reasonable) suggestion to help improve quality (Ryan, Josh, or Brittany)
  12. Met pole goal of 135 w/ <25 revised poles
  13. Completed all assigned toolbox talks
  14. Met pole goal of 135 w/o revised poles WE: _______
  15. WE 9/9: <5 drip loops errors from QC
  16. Met pole goal of 110 w/ <25 revised poles
  17. <100 revised poles for the month
  18. 3 apps passed QC at 100% on initial QC round Project/App:____ Project/App:____ Project/App:____
  19. Submitted time tracker on time 9/2:________ 9/10:________ 9/17:________ 9/24:________
  20. Worked 5 full 8 hour days
  21. Had 0 apps require round 2+ revisions
  22. Engineered at least 440 poles for the month (Doesn't include revised poles)
  23. Met pole goal of 110 w/o revised poles WE: ________
  24. What is the OSP Poles Released goal for FY21? A:_________