Had 0timesheeterrors thewhole monthEngineered atleast 440 polesfor the month(Doesn't includerevised poles)Make a(reasonable)suggestion to helpimprove quality(Ryan, Josh, orBrittany)WE 9/16:<5 groundstreetlighterrorsComplimentedanother co-worker withinIPE regardingtheir work,leadership, etc.UsedMidAmAutomationfor all apps Submitted timetracker on time9/2:________9/10:________9/17:________9/24:________ <100revisedpoles forthe month <2 hours Avgtime on sheets9/2:_________9/10:________9/17:________9/24:________ Scheduled atraining withJosh Gibsonafter gettingrevisions backList the 3pillars onthe backCompletedall assignedtoolbox talksWorked 5full 8 hourdaysMarkingup PolesAvg Time:<15 minsWhat is theOSP PolesReleased goalfor FY21?A:_________Had 0 appsrequireround 2+revisionsWE 9/9: <5drip loopserrors fromQCWE 9/23:Avg time perrevised pole<5 minsMet polegoal of 135w/ <25revisedpolesMet pole goalof 110 w/orevised poles WE: ________Met pole goalof 135 w/orevised poles WE: _______1 app (25 poles)passed QC at100% on initial QCround Project: ______App: _______3 apps passed QCat 100% on initialQC round Project/App:____Project/App:____Project/App:____Met polegoal of 110w/ <25revisedpolesHad 0timesheeterrors thewhole monthEngineered atleast 440 polesfor the month(Doesn't includerevised poles)Make a(reasonable)suggestion to helpimprove quality(Ryan, Josh, orBrittany)WE 9/16:<5 groundstreetlighterrorsComplimentedanother co-worker withinIPE regardingtheir work,leadership, etc.UsedMidAmAutomationfor all apps Submitted timetracker on time9/2:________9/10:________9/17:________9/24:________ <100revisedpoles forthe month <2 hours Avgtime on sheets9/2:_________9/10:________9/17:________9/24:________ Scheduled atraining withJosh Gibsonafter gettingrevisions backList the 3pillars onthe backCompletedall assignedtoolbox talksWorked 5full 8 hourdaysMarkingup PolesAvg Time:<15 minsWhat is theOSP PolesReleased goalfor FY21?A:_________Had 0 appsrequireround 2+revisionsWE 9/9: <5drip loopserrors fromQCWE 9/23:Avg time perrevised pole<5 minsMet polegoal of 135w/ <25revisedpolesMet pole goalof 110 w/orevised poles WE: ________Met pole goalof 135 w/orevised poles WE: _______1 app (25 poles)passed QC at100% on initial QCround Project: ______App: _______3 apps passed QCat 100% on initialQC round Project/App:____Project/App:____Project/App:____Met polegoal of 110w/ <25revisedpoles

Metronet IPE Bingo (September 2021) - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. Had 0 timesheet errors the whole month
  2. Engineered at least 440 poles for the month (Doesn't include revised poles)
  3. Make a (reasonable) suggestion to help improve quality (Ryan, Josh, or Brittany)
  4. WE 9/16: <5 ground streetlight errors
  5. Complimented another co-worker within IPE regarding their work, leadership, etc.
  6. Used MidAm Automation for all apps
  7. Submitted time tracker on time 9/2:________ 9/10:________ 9/17:________ 9/24:________
  8. <100 revised poles for the month
  9. <2 hours Avg time on sheets 9/2:_________ 9/10:________ 9/17:________ 9/24:________
  10. Scheduled a training with Josh Gibson after getting revisions back
  11. List the 3 pillars on the back
  12. Completed all assigned toolbox talks
  13. Worked 5 full 8 hour days
  14. Marking up Poles Avg Time: <15 mins
  15. What is the OSP Poles Released goal for FY21? A:_________
  16. Had 0 apps require round 2+ revisions
  17. WE 9/9: <5 drip loops errors from QC
  18. WE 9/23: Avg time per revised pole <5 mins
  19. Met pole goal of 135 w/ <25 revised poles
  20. Met pole goal of 110 w/o revised poles WE: ________
  21. Met pole goal of 135 w/o revised poles WE: _______
  22. 1 app (25 poles) passed QC at 100% on initial QC round Project: ______ App: _______
  23. 3 apps passed QC at 100% on initial QC round Project/App:____ Project/App:____ Project/App:____
  24. Met pole goal of 110 w/ <25 revised poles