Scheduled ameeting withJosh Gibsonafter gettingrevisions back <2 hours Avgtime on sheets9/2:_______9/10:_______9/17:_______9/24:_______WE 9/23:Avg time perrevised pole<5 mins.Met polegoal of 110w/ <25revisedpolescompletedall assignedtoolbox talksUsedMidAmAutomationfor all appsSubmitted timetracker on time9/2:________9/10:_______9/17:_______9/24:_______Had 0timesheeterrors thewhole monthHad 0 appsrequireround 2+revisionsMake a(reasonable)suggestion to helpimprove quality(Ryan, Josh, orBrittany)Markingup PolesAvg Time:<15 minsMet polegoal of 135w/ <25revisedpolesMet pole goalof 1101/orevised polesWE:_______Met pole goalof 135 w/orevised polesWE:________Engineered atleast 440 polesfor the month(Doesn't includerevised poles.)WE 9/16<5 groundstreetlighterrors.List the 3pillars onthe backComplimentedanother co-worker withinIPE regardingtheir work,leadership, etc.Worked 5full 8 hourdays<100revisedpoles forthe monthWhat is theOSP PolesReleased goalfor FY21?A:_______WE 9/9 <5drip looperrors fromQC1 app (25 poles)passed QC at100% on initial QCround Project:_______App:_______3 apps passed QCat 100% on theinitial Q roundProject/App:_____Project/App:_____Project/App:_____Scheduled ameeting withJosh Gibsonafter gettingrevisions back <2 hours Avgtime on sheets9/2:_______9/10:_______9/17:_______9/24:_______WE 9/23:Avg time perrevised pole<5 mins.Met polegoal of 110w/ <25revisedpolescompletedall assignedtoolbox talksUsedMidAmAutomationfor all appsSubmitted timetracker on time9/2:________9/10:_______9/17:_______9/24:_______Had 0timesheeterrors thewhole monthHad 0 appsrequireround 2+revisionsMake a(reasonable)suggestion to helpimprove quality(Ryan, Josh, orBrittany)Markingup PolesAvg Time:<15 minsMet polegoal of 135w/ <25revisedpolesMet pole goalof 1101/orevised polesWE:_______Met pole goalof 135 w/orevised polesWE:________Engineered atleast 440 polesfor the month(Doesn't includerevised poles.)WE 9/16<5 groundstreetlighterrors.List the 3pillars onthe backComplimentedanother co-worker withinIPE regardingtheir work,leadership, etc.Worked 5full 8 hourdays<100revisedpoles forthe monthWhat is theOSP PolesReleased goalfor FY21?A:_______WE 9/9 <5drip looperrors fromQC1 app (25 poles)passed QC at100% on initial QCround Project:_______App:_______3 apps passed QCat 100% on theinitial Q roundProject/App:_____Project/App:_____Project/App:_____

Metronet IPE Bingo (September 2021) - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. Scheduled a meeting with Josh Gibson after getting revisions back
  2. <2 hours Avg time on sheets 9/2:_______ 9/10:_______ 9/17:_______ 9/24:_______
  3. WE 9/23: Avg time per revised pole <5 mins.
  4. Met pole goal of 110 w/ <25 revised poles
  5. completed all assigned toolbox talks
  6. Used MidAm Automation for all apps
  7. Submitted time tracker on time 9/2:________ 9/10:_______ 9/17:_______ 9/24:_______
  8. Had 0 timesheet errors the whole month
  9. Had 0 apps require round 2+ revisions
  10. Make a (reasonable) suggestion to help improve quality (Ryan, Josh, or Brittany)
  11. Marking up Poles Avg Time: <15 mins
  12. Met pole goal of 135 w/ <25 revised poles
  13. Met pole goal of 1101/o revised poles WE:_______
  14. Met pole goal of 135 w/o revised poles WE:________
  15. Engineered at least 440 poles for the month (Doesn't include revised poles.)
  16. WE 9/16 <5 ground streetlight errors.
  17. List the 3 pillars on the back
  18. Complimented another co-worker within IPE regarding their work, leadership, etc.
  19. Worked 5 full 8 hour days
  20. <100 revised poles for the month
  21. What is the OSP Poles Released goal for FY21? A:_______
  22. WE 9/9 <5 drip loop errors from QC
  23. 1 app (25 poles) passed QC at 100% on initial QC round Project:_______ App:_______
  24. 3 apps passed QC at 100% on the initial Q round Project/App:_____ Project/App:_____ Project/App:_____