completedall assignedtoolbox talksMarkingup PolesAvg Time:<15 minsWE 9/9 <5drip looperrors fromQCUsedMidAmAutomationfor all appsMet polegoal of 110w/ <25revisedpolesMake a(reasonable)suggestion to helpimprove quality(Ryan, Josh, orBrittany)Met polegoal of 135w/ <25revisedpolesList the 3pillars onthe back<2 hours Avgtime on sheets9/2:_______9/10:_______9/17:_______9/24:_______WE 9/16<5 groundstreetlighterrors.Engineered atleast 440 polesfor the month(Doesn't includerevised poles.)Had 0timesheeterrors thewhole monthHad 0 appsrequireround 2+revisionsWE 9/23:Avg time perrevised pole<5 mins.1 app (25 poles)passed QC at100% on initial QCround Project:_______App:_______<100revisedpoles forthe monthMet pole goalof 1101/orevised polesWE:_______Submitted timetracker on time9/2:________9/10:_______9/17:_______9/24:_______What is theOSP PolesReleased goalfor FY21?A:_______Met pole goalof 135 w/orevised polesWE:________Scheduled ameeting withJosh Gibsonafter gettingrevisions back Complimentedanother co-worker withinIPE regardingtheir work,leadership, etc.Worked 5full 8 hourdays3 apps passed QCat 100% on theinitial Q roundProject/App:_____Project/App:_____Project/App:_____completedall assignedtoolbox talksMarkingup PolesAvg Time:<15 minsWE 9/9 <5drip looperrors fromQCUsedMidAmAutomationfor all appsMet polegoal of 110w/ <25revisedpolesMake a(reasonable)suggestion to helpimprove quality(Ryan, Josh, orBrittany)Met polegoal of 135w/ <25revisedpolesList the 3pillars onthe back<2 hours Avgtime on sheets9/2:_______9/10:_______9/17:_______9/24:_______WE 9/16<5 groundstreetlighterrors.Engineered atleast 440 polesfor the month(Doesn't includerevised poles.)Had 0timesheeterrors thewhole monthHad 0 appsrequireround 2+revisionsWE 9/23:Avg time perrevised pole<5 mins.1 app (25 poles)passed QC at100% on initial QCround Project:_______App:_______<100revisedpoles forthe monthMet pole goalof 1101/orevised polesWE:_______Submitted timetracker on time9/2:________9/10:_______9/17:_______9/24:_______What is theOSP PolesReleased goalfor FY21?A:_______Met pole goalof 135 w/orevised polesWE:________Scheduled ameeting withJosh Gibsonafter gettingrevisions back Complimentedanother co-worker withinIPE regardingtheir work,leadership, etc.Worked 5full 8 hourdays3 apps passed QCat 100% on theinitial Q roundProject/App:_____Project/App:_____Project/App:_____

Metronet IPE Bingo (September 2021) - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. completed all assigned toolbox talks
  2. Marking up Poles Avg Time: <15 mins
  3. WE 9/9 <5 drip loop errors from QC
  4. Used MidAm Automation for all apps
  5. Met pole goal of 110 w/ <25 revised poles
  6. Make a (reasonable) suggestion to help improve quality (Ryan, Josh, or Brittany)
  7. Met pole goal of 135 w/ <25 revised poles
  8. List the 3 pillars on the back
  9. <2 hours Avg time on sheets 9/2:_______ 9/10:_______ 9/17:_______ 9/24:_______
  10. WE 9/16 <5 ground streetlight errors.
  11. Engineered at least 440 poles for the month (Doesn't include revised poles.)
  12. Had 0 timesheet errors the whole month
  13. Had 0 apps require round 2+ revisions
  14. WE 9/23: Avg time per revised pole <5 mins.
  15. 1 app (25 poles) passed QC at 100% on initial QC round Project:_______ App:_______
  16. <100 revised poles for the month
  17. Met pole goal of 1101/o revised poles WE:_______
  18. Submitted time tracker on time 9/2:________ 9/10:_______ 9/17:_______ 9/24:_______
  19. What is the OSP Poles Released goal for FY21? A:_______
  20. Met pole goal of 135 w/o revised poles WE:________
  21. Scheduled a meeting with Josh Gibson after getting revisions back
  22. Complimented another co-worker within IPE regarding their work, leadership, etc.
  23. Worked 5 full 8 hour days
  24. 3 apps passed QC at 100% on the initial Q round Project/App:_____ Project/App:_____ Project/App:_____