Met polegoal of 135w/ <25revisedpolesMake a(reasonable)suggestion to helpimprove quality(Ryan, Josh, orBrittany)UsedMidAmAutomationfor all appsMet pole goalof 135 w/orevised polesWE:________Complimentedanother co-worker withinIPE regardingtheir work,leadership, etc.What is theOSP PolesReleased goalfor FY21?A:_______Scheduled ameeting withJosh Gibsonafter gettingrevisions back Worked 5full 8 hourdays<100revisedpoles forthe monthHad 0 appsrequireround 2+revisionsMet pole goalof 1101/orevised polesWE:_______completedall assignedtoolbox talksWE 9/9 <5drip looperrors fromQCSubmitted timetracker on time9/2:________9/10:_______9/17:_______9/24:_______Met polegoal of 110w/ <25revisedpolesEngineered atleast 440 polesfor the month(Doesn't includerevised poles.)WE 9/23:Avg time perrevised pole<5 mins.WE 9/16<5 groundstreetlighterrors.List the 3pillars onthe backHad 0timesheeterrors thewhole month3 apps passed QCat 100% on theinitial Q roundProject/App:_____Project/App:_____Project/App:_____Markingup PolesAvg Time:<15 mins1 app (25 poles)passed QC at100% on initial QCround Project:_______App:_______<2 hours Avgtime on sheets9/2:_______9/10:_______9/17:_______9/24:_______Met polegoal of 135w/ <25revisedpolesMake a(reasonable)suggestion to helpimprove quality(Ryan, Josh, orBrittany)UsedMidAmAutomationfor all appsMet pole goalof 135 w/orevised polesWE:________Complimentedanother co-worker withinIPE regardingtheir work,leadership, etc.What is theOSP PolesReleased goalfor FY21?A:_______Scheduled ameeting withJosh Gibsonafter gettingrevisions back Worked 5full 8 hourdays<100revisedpoles forthe monthHad 0 appsrequireround 2+revisionsMet pole goalof 1101/orevised polesWE:_______completedall assignedtoolbox talksWE 9/9 <5drip looperrors fromQCSubmitted timetracker on time9/2:________9/10:_______9/17:_______9/24:_______Met polegoal of 110w/ <25revisedpolesEngineered atleast 440 polesfor the month(Doesn't includerevised poles.)WE 9/23:Avg time perrevised pole<5 mins.WE 9/16<5 groundstreetlighterrors.List the 3pillars onthe backHad 0timesheeterrors thewhole month3 apps passed QCat 100% on theinitial Q roundProject/App:_____Project/App:_____Project/App:_____Markingup PolesAvg Time:<15 mins1 app (25 poles)passed QC at100% on initial QCround Project:_______App:_______<2 hours Avgtime on sheets9/2:_______9/10:_______9/17:_______9/24:_______

Metronet IPE Bingo (September 2021) - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. Met pole goal of 135 w/ <25 revised poles
  2. Make a (reasonable) suggestion to help improve quality (Ryan, Josh, or Brittany)
  3. Used MidAm Automation for all apps
  4. Met pole goal of 135 w/o revised poles WE:________
  5. Complimented another co-worker within IPE regarding their work, leadership, etc.
  6. What is the OSP Poles Released goal for FY21? A:_______
  7. Scheduled a meeting with Josh Gibson after getting revisions back
  8. Worked 5 full 8 hour days
  9. <100 revised poles for the month
  10. Had 0 apps require round 2+ revisions
  11. Met pole goal of 1101/o revised poles WE:_______
  12. completed all assigned toolbox talks
  13. WE 9/9 <5 drip loop errors from QC
  14. Submitted time tracker on time 9/2:________ 9/10:_______ 9/17:_______ 9/24:_______
  15. Met pole goal of 110 w/ <25 revised poles
  16. Engineered at least 440 poles for the month (Doesn't include revised poles.)
  17. WE 9/23: Avg time per revised pole <5 mins.
  18. WE 9/16 <5 ground streetlight errors.
  19. List the 3 pillars on the back
  20. Had 0 timesheet errors the whole month
  21. 3 apps passed QC at 100% on the initial Q round Project/App:_____ Project/App:_____ Project/App:_____
  22. Marking up Poles Avg Time: <15 mins
  23. 1 app (25 poles) passed QC at 100% on initial QC round Project:_______ App:_______
  24. <2 hours Avg time on sheets 9/2:_______ 9/10:_______ 9/17:_______ 9/24:_______