JIT (Just In Time) Toyota production system (TPS) 6S Teach and learn Jidoka FIFO "T" type leader Socratic method Shu Ha Ri Hoshin Kanri Pull system WIP Hansei Value stream mapping Cycle Time Red team PDCA (Plan-Do- Check- Act) Poka- yoke Over- production Muda Defects Lean Andon Hai Genchi Gembutsu Stakeholder A3 report Flow Kaizen Heijunka Future state Value added Gemba Kata Push system Autonomation Kanban KPI: (Key Performance Indicators) “Pull the rope” Current State Five Whys Supermarket Takt time Theory of constraints (TOC) JIT (Just In Time) Toyota production system (TPS) 6S Teach and learn Jidoka FIFO "T" type leader Socratic method Shu Ha Ri Hoshin Kanri Pull system WIP Hansei Value stream mapping Cycle Time Red team PDCA (Plan-Do- Check- Act) Poka- yoke Over- production Muda Defects Lean Andon Hai Genchi Gembutsu Stakeholder A3 report Flow Kaizen Heijunka Future state Value added Gemba Kata Push system Autonomation Kanban KPI: (Key Performance Indicators) “Pull the rope” Current State Five Whys Supermarket Takt time Theory of constraints (TOC)
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
JIT (Just In Time)
Toyota production system (TPS)
6S
Teach and learn
Jidoka
FIFO
"T" type leader
Socratic method
Shu Ha Ri
Hoshin Kanri
Pull system
WIP
Hansei
Value stream mapping
Cycle Time
Red team
PDCA (Plan-Do-Check-Act)
Poka-yoke
Over-production
Muda
Defects
Lean
Andon
Hai
Genchi Gembutsu
Stakeholder
A3 report
Flow
Kaizen
Heijunka
Future state
Value added
Gemba
Kata
Push system
Autonomation
Kanban
KPI: (Key Performance Indicators)
“Pull the rope”
Current State
Five Whys
Supermarket
Takt time
Theory of constraints (TOC)