HeijunkaCurrentStateJidokaFuturestatePDCA(Plan-Do-Check-Act)TakttimeKPI: (KeyPerformanceIndicators)GembaKaizenAutonomationShuHa Ri"T"typeleaderPullsystemHaiCycleTimeSupermarketOver-productionDefectsA3reportJIT(Just InTime)AndonPushsystemTeachandlearn“Pulltherope”Poka-yokeSocraticmethodHoshinKanriFiveWhysKataLeanFlowToyotaproductionsystem(TPS)ValuestreammappingValueaddedGenchiGembutsu6SWIPStakeholderHanseiKanbanMudaTheory ofconstraints(TOC)RedteamFIFOHeijunkaCurrentStateJidokaFuturestatePDCA(Plan-Do-Check-Act)TakttimeKPI: (KeyPerformanceIndicators)GembaKaizenAutonomationShuHa Ri"T"typeleaderPullsystemHaiCycleTimeSupermarketOver-productionDefectsA3reportJIT(Just InTime)AndonPushsystemTeachandlearn“Pulltherope”Poka-yokeSocraticmethodHoshinKanriFiveWhysKataLeanFlowToyotaproductionsystem(TPS)ValuestreammappingValueaddedGenchiGembutsu6SWIPStakeholderHanseiKanbanMudaTheory ofconstraints(TOC)RedteamFIFO

Lean Lingo Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
  1. Heijunka
  2. Current State
  3. Jidoka
  4. Future state
  5. PDCA (Plan-Do-Check-Act)
  6. Takt time
  7. KPI: (Key Performance Indicators)
  8. Gemba
  9. Kaizen
  10. Autonomation
  11. Shu Ha Ri
  12. "T" type leader
  13. Pull system
  14. Hai
  15. Cycle Time
  16. Supermarket
  17. Over-production
  18. Defects
  19. A3 report
  20. JIT (Just In Time)
  21. Andon
  22. Push system
  23. Teach and learn
  24. “Pull the rope”
  25. Poka-yoke
  26. Socratic method
  27. Hoshin Kanri
  28. Five Whys
  29. Kata
  30. Lean
  31. Flow
  32. Toyota production system (TPS)
  33. Value stream mapping
  34. Value added
  35. Genchi Gembutsu
  36. 6S
  37. WIP
  38. Stakeholder
  39. Hansei
  40. Kanban
  41. Muda
  42. Theory of constraints (TOC)
  43. Red team
  44. FIFO