KPI: (Key Performance Indicators) Hai Kaizen Stakeholder Genchi Gembutsu Hansei "T" type leader Kata JIT (Just In Time) Takt time Lean Kanban FIFO Push system Five Whys A3 report Theory of constraints (TOC) Value stream mapping Supermarket Hoshin Kanri Teach and learn Heijunka MudaOver- production Defects Flow Value added Cycle Time Future state PDCA (Plan-Do- Check- Act) Gemba WIP Toyota production system (TPS) Socratic method Pull system Jidoka “Pull the rope” Poka- yoke Autonomation Shu Ha Ri Red team Current State Andon 6S KPI: (Key Performance Indicators) Hai Kaizen Stakeholder Genchi Gembutsu Hansei "T" type leader Kata JIT (Just In Time) Takt time Lean Kanban FIFO Push system Five Whys A3 report Theory of constraints (TOC) Value stream mapping Supermarket Hoshin Kanri Teach and learn Heijunka MudaOver- production Defects Flow Value added Cycle Time Future state PDCA (Plan-Do- Check- Act) Gemba WIP Toyota production system (TPS) Socratic method Pull system Jidoka “Pull the rope” Poka- yoke Autonomation Shu Ha Ri Red team Current State Andon 6S
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
KPI: (Key Performance Indicators)
Hai
Kaizen
Stakeholder
Genchi Gembutsu
Hansei
"T" type leader
Kata
JIT (Just In Time)
Takt time
Lean
Kanban
FIFO
Push system
Five Whys
A3 report
Theory of constraints (TOC)
Value stream mapping
Supermarket
Hoshin Kanri
Teach and learn
Heijunka
MudaOver-production
Defects
Flow
Value added
Cycle Time
Future state
PDCA (Plan-Do-Check-Act)
Gemba
WIP
Toyota production system (TPS)
Socratic method
Pull system
Jidoka
“Pull the rope”
Poka-yoke
Autonomation
Shu Ha Ri
Red team
Current State
Andon
6S