PDCA (Plan-Do- Check- Act) KPI: (Key Performance Indicators) Defects Hoshin Kanri Teach and learn Autonomation Cycle Time Value stream mapping Hansei Genchi Gembutsu Flow Kanban Red team Five Whys FIFO Value added Theory of constraints (TOC) Supermarket "T" type leader Lean Future state Toyota production system (TPS) JIT (Just In Time) Over- production Muda Jidoka Heijunka Kaizen Andon Socratic method Current State Stakeholder Gemba “Pull the rope” Poka- yoke Push system Kata 6S Hai WIP Takt time A3 report Shu Ha Ri Pull system PDCA (Plan-Do- Check- Act) KPI: (Key Performance Indicators) Defects Hoshin Kanri Teach and learn Autonomation Cycle Time Value stream mapping Hansei Genchi Gembutsu Flow Kanban Red team Five Whys FIFO Value added Theory of constraints (TOC) Supermarket "T" type leader Lean Future state Toyota production system (TPS) JIT (Just In Time) Over- production Muda Jidoka Heijunka Kaizen Andon Socratic method Current State Stakeholder Gemba “Pull the rope” Poka- yoke Push system Kata 6S Hai WIP Takt time A3 report Shu Ha Ri Pull system
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
PDCA (Plan-Do-Check-Act)
KPI: (Key Performance Indicators)
Defects
Hoshin Kanri
Teach and learn
Autonomation
Cycle Time
Value stream mapping
Hansei
Genchi Gembutsu
Flow
Kanban
Red team
Five Whys
FIFO
Value added
Theory of constraints (TOC)
Supermarket
"T" type leader
Lean
Future state
Toyota production system (TPS)
JIT (Just In Time)
Over-production
Muda
Jidoka
Heijunka
Kaizen
Andon
Socratic method
Current State
Stakeholder
Gemba
“Pull the rope”
Poka-yoke
Push system
Kata
6S
Hai
WIP
Takt time
A3 report
Shu Ha Ri
Pull system