Heijunka Flow Jidoka WIP PDCA (Plan-Do- Check- Act) Teach and learn Stakeholder A3 report KPI: (Key Performance Indicators) Toyota production system (TPS) Current State Value stream mapping Muda Kanban Value added Red team JIT (Just In Time) Pull system Shu Ha Ri Defects Lean Theory of constraints (TOC) Takt time Autonomation Hansei Kaizen Supermarket "T" type leader Poka- yoke FIFO 6S Five Whys Future state Hai Kata Socratic method Andon Push system Hoshin Kanri “Pull the rope” Cycle Time Over- production Genchi Gembutsu Gemba Heijunka Flow Jidoka WIP PDCA (Plan-Do- Check- Act) Teach and learn Stakeholder A3 report KPI: (Key Performance Indicators) Toyota production system (TPS) Current State Value stream mapping Muda Kanban Value added Red team JIT (Just In Time) Pull system Shu Ha Ri Defects Lean Theory of constraints (TOC) Takt time Autonomation Hansei Kaizen Supermarket "T" type leader Poka- yoke FIFO 6S Five Whys Future state Hai Kata Socratic method Andon Push system Hoshin Kanri “Pull the rope” Cycle Time Over- production Genchi Gembutsu Gemba
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Heijunka
Flow
Jidoka
WIP
PDCA (Plan-Do-Check-Act)
Teach and learn
Stakeholder
A3 report
KPI: (Key Performance Indicators)
Toyota production system (TPS)
Current State
Value stream mapping
Muda
Kanban
Value added
Red team
JIT (Just In Time)
Pull system
Shu Ha Ri
Defects
Lean
Theory of constraints (TOC)
Takt time
Autonomation
Hansei
Kaizen
Supermarket
"T" type leader
Poka-yoke
FIFO
6S
Five Whys
Future state
Hai
Kata
Socratic method
Andon
Push system
Hoshin Kanri
“Pull the rope”
Cycle Time
Over-production
Genchi Gembutsu
Gemba