“Pull the rope” Pull system Red team Shu Ha Ri Kaizen Toyota production system (TPS) "T" type leader Flow Value stream mapping Poka- yoke Hansei Muda Supermarket FIFO Stakeholder KPI: (Key Performance Indicators) Hai Hoshin Kanri Current State Jidoka Over- production WIP Defects Push system Theory of constraints (TOC) Lean 6S Cycle Time JIT (Just In Time) Genchi Gembutsu Socratic method A3 report Kata Future state Teach and learn PDCA (Plan-Do- Check- Act) Kanban Gemba Five Whys Heijunka Autonomation Takt time Value added Andon “Pull the rope” Pull system Red team Shu Ha Ri Kaizen Toyota production system (TPS) "T" type leader Flow Value stream mapping Poka- yoke Hansei Muda Supermarket FIFO Stakeholder KPI: (Key Performance Indicators) Hai Hoshin Kanri Current State Jidoka Over- production WIP Defects Push system Theory of constraints (TOC) Lean 6S Cycle Time JIT (Just In Time) Genchi Gembutsu Socratic method A3 report Kata Future state Teach and learn PDCA (Plan-Do- Check- Act) Kanban Gemba Five Whys Heijunka Autonomation Takt time Value added Andon
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
“Pull the rope”
Pull system
Red team
Shu Ha Ri
Kaizen
Toyota production system (TPS)
"T" type leader
Flow
Value stream mapping
Poka-yoke
Hansei
Muda
Supermarket
FIFO
Stakeholder
KPI: (Key Performance Indicators)
Hai
Hoshin Kanri
Current State
Jidoka
Over-production
WIP
Defects
Push system
Theory of constraints (TOC)
Lean
6S
Cycle Time
JIT (Just In Time)
Genchi Gembutsu
Socratic method
A3 report
Kata
Future state
Teach and learn
PDCA (Plan-Do-Check-Act)
Kanban
Gemba
Five Whys
Heijunka
Autonomation
Takt time
Value added
Andon