Administrator Remarks OA2 C-1 Process Design AMI Probe AMI CMWS C- Connection KCS Qualified Electrical Worker Huddle Storm Service Suite C-2 Problem Solving Supervisor Engagement Safety Insulated Tools Disconnects SaMM Completion Codes POD Super Beast Primary Overhead Line Safety Stand Down MPT FCC IAC Control Unit COE C-3 Knowledge Sharing P- Pathway Single Phase Testing O- Process Output A- Activity WH Control Units Shift Worker Process Dispatch Time Four Blocks Turn on Pontiac EFO Schedule Detroit Job Code Re phase Testing OPT- OUT Macomb Meter Shop General Supervisor Training Ann Arbor DPMO Defects Lapeer Manager True North CSB Safety Workers Observations SaMM Playbook Demolition Port Huron DTE Energy NAEC Yokogawa DO Western Wayne OPCA Field Rep CI C-4 Leader as Teacher Meter Closures PRT Fluke Order Type Administrator Remarks OA2 C-1 Process Design AMI Probe AMI CMWS C- Connection KCS Qualified Electrical Worker Huddle Storm Service Suite C-2 Problem Solving Supervisor Engagement Safety Insulated Tools Disconnects SaMM Completion Codes POD Super Beast Primary Overhead Line Safety Stand Down MPT FCC IAC Control Unit COE C-3 Knowledge Sharing P- Pathway Single Phase Testing O- Process Output A- Activity WH Control Units Shift Worker Process Dispatch Time Four Blocks Turn on Pontiac EFO Schedule Detroit Job Code Re phase Testing OPT- OUT Macomb Meter Shop General Supervisor Training Ann Arbor DPMO Defects Lapeer Manager True North CSB Safety Workers Observations SaMM Playbook Demolition Port Huron DTE Energy NAEC Yokogawa DO Western Wayne OPCA Field Rep CI C-4 Leader as Teacher Meter Closures PRT Fluke Order Type
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Administrator
Remarks
OA2
C-1 Process Design
AMI Probe
AMI
CMWS
C-Connection
KCS
Qualified Electrical Worker
Huddle
Storm
Service Suite
C-2 Problem Solving
Supervisor
Engagement
Safety
Insulated Tools
Disconnects
SaMM
Completion Codes
POD
Super Beast
Primary
Overhead Line
Safety Stand Down
MPT
FCC
IAC Control Unit
COE
C-3 Knowledge Sharing
P-Pathway
Single Phase Testing
O-Process Output
A-Activity
WH Control Units
Shift Worker
Process
Dispatch Time
Four Blocks
Turn on
Pontiac
EFO Schedule
Detroit
Job Code
Re phase Testing
OPT-OUT
Macomb
Meter Shop
General Supervisor
Training
Ann Arbor
DPMO Defects
Lapeer
Manager
True North
CSB
Safety Workers Observations
SaMM Playbook
Demolition
Port Huron
DTE Energy
NAEC
Yokogawa
DO
Western Wayne
OPCA
Field Rep
CI
C-4 Leader as Teacher
Meter Closures
PRT
Fluke
Order Type