inletdiverterasettlerby steamejectorsystem andcondenserafter thereactionoccursplatesthe highestpermissiblegaugepressurestrengthof thematerial Free!catalystprocessfilterabsorbfluctuations inthe processstream orflowOSHA1910.106(A)(26)designorfunctionreactorcontactorat eachend byheadsthe type ofcontaminantandcomposition ofthe processstreamlocationlockout/tagoutthe filterneeds to becleaned orreplacedpressurevesselfailuresteampurgelow-pointdrainsand bleedvalvespackingincrease thevessel’shydrostaticpressurethefractioningcolumndistillationASME coderequirementsprimaryseparation,gravity, andmisteliminationgascoalesceroperatorinletdiverterasettlerby steamejectorsystem andcondenserafter thereactionoccursplatesthe highestpermissiblegaugepressurestrengthof thematerialFree!catalystprocessfilterabsorbfluctuations inthe processstream orflowOSHA1910.106(A)(26)designorfunctionreactorcontactorat eachend byheadsthe type ofcontaminantandcomposition ofthe processstreamlocationlockout/tagoutthe filterneeds to becleaned orreplacedpressurevesselfailuresteampurgelow-pointdrainsand bleedvalvespackingincrease thevessel’shydrostaticpressurethefractioningcolumndistillationASME coderequirementsprimaryseparation,gravity, andmisteliminationgascoalesceroperator

Pressure Vessels Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
  1. inlet diverter
  2. a settler
  3. by steam ejector system and condenser
  4. after the reaction occurs
  5. plates
  6. the highest permissible gauge pressure
  7. strength of the material
  8. Free!
  9. catalyst
  10. process filter
  11. absorb fluctuations in the process stream or flow
  12. OSHA 1910.106(A)(26)
  13. design or function
  14. reactor
  15. contactor
  16. at each end by heads
  17. the type of contaminant and composition of the process stream
  18. location
  19. lock out/tag out
  20. the filter needs to be cleaned or replaced
  21. pressure vessel failure
  22. steam purge
  23. low-point drains and bleed valves
  24. packing
  25. increase the vessel’s hydrostatic pressure
  26. the fractioning column
  27. distillation
  28. ASME code requirements
  29. primary separation, gravity, and mist elimination
  30. gas coalescer
  31. operator