strengthof thematerialafter thereactionoccursdistillationat eachend byheadsdesignorfunctionoperatorpressurevesselfailureabsorbfluctuations inthe processstream orflowthe highestpermissiblegaugepressuregascoalescerinletdiverterreactorthe type ofcontaminantandcomposition ofthe processstreamthe filterneeds to becleaned orreplacedcatalystASME coderequirementslockout/tagoutlocationprimaryseparation,gravity, andmisteliminationby steamejectorsystem andcondenserasettlerOSHA1910.106(A)(26)contactorplatespackingincrease thevessel’shydrostaticpressure Free!low-pointdrainsand bleedvalvessteampurgethefractioningcolumnprocessfilterstrengthof thematerialafter thereactionoccursdistillationat eachend byheadsdesignorfunctionoperatorpressurevesselfailureabsorbfluctuations inthe processstream orflowthe highestpermissiblegaugepressuregascoalescerinletdiverterreactorthe type ofcontaminantandcomposition ofthe processstreamthe filterneeds to becleaned orreplacedcatalystASME coderequirementslockout/tagoutlocationprimaryseparation,gravity, andmisteliminationby steamejectorsystem andcondenserasettlerOSHA1910.106(A)(26)contactorplatespackingincrease thevessel’shydrostaticpressureFree!low-pointdrainsand bleedvalvessteampurgethefractioningcolumnprocessfilter

Pressure Vessels Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
  1. strength of the material
  2. after the reaction occurs
  3. distillation
  4. at each end by heads
  5. design or function
  6. operator
  7. pressure vessel failure
  8. absorb fluctuations in the process stream or flow
  9. the highest permissible gauge pressure
  10. gas coalescer
  11. inlet diverter
  12. reactor
  13. the type of contaminant and composition of the process stream
  14. the filter needs to be cleaned or replaced
  15. catalyst
  16. ASME code requirements
  17. lock out/tag out
  18. location
  19. primary separation, gravity, and mist elimination
  20. by steam ejector system and condenser
  21. a settler
  22. OSHA 1910.106(A)(26)
  23. contactor
  24. plates
  25. packing
  26. increase the vessel’s hydrostatic pressure
  27. Free!
  28. low-point drains and bleed valves
  29. steam purge
  30. the fractioning column
  31. process filter