low-pointdrainsand bleedvalvesdistillationby steamejectorsystem andcondenserlockout/tagoutpackingcatalystabsorbfluctuations inthe processstream orflowthe filterneeds to becleaned orreplacedasettlerat eachend byheadsASME coderequirementsafter thereactionoccursOSHA1910.106(A)(26)locationcontactorplatesinletdiverterthe type ofcontaminantandcomposition ofthe processstreamgascoalescersteampurgeprocessfilter Free!pressurevesselfailureprimaryseparation,gravity, andmisteliminationdesignorfunctionthefractioningcolumnoperatorreactorthe highestpermissiblegaugepressureincrease thevessel’shydrostaticpressurestrengthof themateriallow-pointdrainsand bleedvalvesdistillationby steamejectorsystem andcondenserlockout/tagoutpackingcatalystabsorbfluctuations inthe processstream orflowthe filterneeds to becleaned orreplacedasettlerat eachend byheadsASME coderequirementsafter thereactionoccursOSHA1910.106(A)(26)locationcontactorplatesinletdiverterthe type ofcontaminantandcomposition ofthe processstreamgascoalescersteampurgeprocessfilterFree!pressurevesselfailureprimaryseparation,gravity, andmisteliminationdesignorfunctionthefractioningcolumnoperatorreactorthe highestpermissiblegaugepressureincrease thevessel’shydrostaticpressurestrengthof thematerial

Pressure Vessels Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
  1. low-point drains and bleed valves
  2. distillation
  3. by steam ejector system and condenser
  4. lock out/tag out
  5. packing
  6. catalyst
  7. absorb fluctuations in the process stream or flow
  8. the filter needs to be cleaned or replaced
  9. a settler
  10. at each end by heads
  11. ASME code requirements
  12. after the reaction occurs
  13. OSHA 1910.106(A)(26)
  14. location
  15. contactor
  16. plates
  17. inlet diverter
  18. the type of contaminant and composition of the process stream
  19. gas coalescer
  20. steam purge
  21. process filter
  22. Free!
  23. pressure vessel failure
  24. primary separation, gravity, and mist elimination
  25. design or function
  26. the fractioning column
  27. operator
  28. reactor
  29. the highest permissible gauge pressure
  30. increase the vessel’s hydrostatic pressure
  31. strength of the material