We need toshipbecausewe're pastdue.You'remeasuring itwrong if itmeasures intolerance.What doyou mean,"revisionlevel"?Did youdo acapabilitystudy?Can youreworkit?It's asupplierissue.The operatorwasn't followingthe workinstructionsbut...We needsomebody tosort.(We meanQuality)Why didn'tthe supplier[thing thatgot missed]?Is there aQualityAlert?Can youmeasureit?Did you auditthat [fill inthing thatfailed]recently?QualityissueBut it worksat [sistercompanylocation].___ partis bad (nopart #)Why didn'tyou catchthis atincominginspection?Is it in theworkinstructions?Shouldwe rejectit?We needreworkinstructionsto fix theparts.Can you makethe CMMdimensions tomatch theproduct?Can wedeviateit?Will thecustomeraccept itas it is?Correctiveaction?What doyou mean?JustreduceinspectioncriteriaWe need toshipbecausewe're pastdue.You'remeasuring itwrong if itmeasures intolerance.What doyou mean,"revisionlevel"?Did youdo acapabilitystudy?Can youreworkit?It's asupplierissue.The operatorwasn't followingthe workinstructionsbut...We needsomebody tosort.(We meanQuality)Why didn'tthe supplier[thing thatgot missed]?Is there aQualityAlert?Can youmeasureit?Did you auditthat [fill inthing thatfailed]recently?QualityissueBut it worksat [sistercompanylocation].___ partis bad (nopart #)Why didn'tyou catchthis atincominginspection?Is it in theworkinstructions?Shouldwe rejectit?We needreworkinstructionsto fix theparts.Can you makethe CMMdimensions tomatch theproduct?Can wedeviateit?Will thecustomeraccept itas it is?Correctiveaction?What doyou mean?Justreduceinspectioncriteria

Production Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. We need to ship because we're past due.
  2. You're measuring it wrong if it measures in tolerance.
  3. What do you mean, "revision level"?
  4. Did you do a capability study?
  5. Can you rework it?
  6. It's a supplier issue.
  7. The operator wasn't following the work instructions but...
  8. We need somebody to sort. (We mean Quality)
  9. Why didn't the supplier [thing that got missed]?
  10. Is there a Quality Alert?
  11. Can you measure it?
  12. Did you audit that [fill in thing that failed] recently?
  13. Quality issue
  14. But it works at [sister company location].
  15. ___ part is bad (no part #)
  16. Why didn't you catch this at incoming inspection?
  17. Is it in the work instructions?
  18. Should we reject it?
  19. We need rework instructions to fix the parts.
  20. Can you make the CMM dimensions to match the product?
  21. Can we deviate it?
  22. Will the customer accept it as it is?
  23. Corrective action? What do you mean?
  24. Just reduce inspection criteria