Is it in theworkinstructions?Will thecustomeraccept itas it is?It's asupplierissue.___ partis bad (nopart #)We need toshipbecausewe're pastdue.Can youreworkit?We needreworkinstructionsto fix theparts.Why didn'tyou catchthis atincominginspection?Did youdo acapabilitystudy?Shouldwe rejectit?JustreduceinspectioncriteriaCan youmeasureit?We needsomebody tosort.(We meanQuality)QualityissueWhat doyou mean,"revisionlevel"?But it worksat [sistercompanylocation].Can wedeviateit?Is there aQualityAlert?You'remeasuring itwrong if itmeasures intolerance.Can you makethe CMMdimensions tomatch theproduct?Correctiveaction?What doyou mean?The operatorwasn't followingthe workinstructionsbut...Why didn'tthe supplier[thing thatgot missed]?Did you auditthat [fill inthing thatfailed]recently?Is it in theworkinstructions?Will thecustomeraccept itas it is?It's asupplierissue.___ partis bad (nopart #)We need toshipbecausewe're pastdue.Can youreworkit?We needreworkinstructionsto fix theparts.Why didn'tyou catchthis atincominginspection?Did youdo acapabilitystudy?Shouldwe rejectit?JustreduceinspectioncriteriaCan youmeasureit?We needsomebody tosort.(We meanQuality)QualityissueWhat doyou mean,"revisionlevel"?But it worksat [sistercompanylocation].Can wedeviateit?Is there aQualityAlert?You'remeasuring itwrong if itmeasures intolerance.Can you makethe CMMdimensions tomatch theproduct?Correctiveaction?What doyou mean?The operatorwasn't followingthe workinstructionsbut...Why didn'tthe supplier[thing thatgot missed]?Did you auditthat [fill inthing thatfailed]recently?

Production Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. Is it in the work instructions?
  2. Will the customer accept it as it is?
  3. It's a supplier issue.
  4. ___ part is bad (no part #)
  5. We need to ship because we're past due.
  6. Can you rework it?
  7. We need rework instructions to fix the parts.
  8. Why didn't you catch this at incoming inspection?
  9. Did you do a capability study?
  10. Should we reject it?
  11. Just reduce inspection criteria
  12. Can you measure it?
  13. We need somebody to sort. (We mean Quality)
  14. Quality issue
  15. What do you mean, "revision level"?
  16. But it works at [sister company location].
  17. Can we deviate it?
  18. Is there a Quality Alert?
  19. You're measuring it wrong if it measures in tolerance.
  20. Can you make the CMM dimensions to match the product?
  21. Corrective action? What do you mean?
  22. The operator wasn't following the work instructions but...
  23. Why didn't the supplier [thing that got missed]?
  24. Did you audit that [fill in thing that failed] recently?