Can youreworkit?It's asupplierissue.Can youmeasureit?Correctiveaction?What doyou mean?Shouldwe rejectit?Did you auditthat [fill inthing thatfailed]recently?The operatorwasn't followingthe workinstructionsbut...We needsomebody tosort.(We meanQuality)Will thecustomeraccept itas it is?Why didn'tthe supplier[thing thatgot missed]?You'remeasuring itwrong if itmeasures intolerance.Is it in theworkinstructions?Did youdo acapabilitystudy?Can wedeviateit?Can you makethe CMMdimensions tomatch theproduct?JustreduceinspectioncriteriaWe needreworkinstructionsto fix theparts.We need toshipbecausewe're pastdue.Qualityissue___ partis bad (nopart #)Why didn'tyou catchthis atincominginspection?But it worksat [sistercompanylocation].What doyou mean,"revisionlevel"?Is there aQualityAlert?Can youreworkit?It's asupplierissue.Can youmeasureit?Correctiveaction?What doyou mean?Shouldwe rejectit?Did you auditthat [fill inthing thatfailed]recently?The operatorwasn't followingthe workinstructionsbut...We needsomebody tosort.(We meanQuality)Will thecustomeraccept itas it is?Why didn'tthe supplier[thing thatgot missed]?You'remeasuring itwrong if itmeasures intolerance.Is it in theworkinstructions?Did youdo acapabilitystudy?Can wedeviateit?Can you makethe CMMdimensions tomatch theproduct?JustreduceinspectioncriteriaWe needreworkinstructionsto fix theparts.We need toshipbecausewe're pastdue.Qualityissue___ partis bad (nopart #)Why didn'tyou catchthis atincominginspection?But it worksat [sistercompanylocation].What doyou mean,"revisionlevel"?Is there aQualityAlert?

Production Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. Can you rework it?
  2. It's a supplier issue.
  3. Can you measure it?
  4. Corrective action? What do you mean?
  5. Should we reject it?
  6. Did you audit that [fill in thing that failed] recently?
  7. The operator wasn't following the work instructions but...
  8. We need somebody to sort. (We mean Quality)
  9. Will the customer accept it as it is?
  10. Why didn't the supplier [thing that got missed]?
  11. You're measuring it wrong if it measures in tolerance.
  12. Is it in the work instructions?
  13. Did you do a capability study?
  14. Can we deviate it?
  15. Can you make the CMM dimensions to match the product?
  16. Just reduce inspection criteria
  17. We need rework instructions to fix the parts.
  18. We need to ship because we're past due.
  19. Quality issue
  20. ___ part is bad (no part #)
  21. Why didn't you catch this at incoming inspection?
  22. But it works at [sister company location].
  23. What do you mean, "revision level"?
  24. Is there a Quality Alert?