Shouldwe rejectit?We need toshipbecausewe're pastdue.Is it in theworkinstructions?Did youdo acapabilitystudy?___ partis bad (nopart #)Can youreworkit?Did you auditthat [fill inthing thatfailed]recently?You'remeasuring itwrong if itmeasures intolerance.We needsomebody tosort.(We meanQuality)Correctiveaction?What doyou mean?We needreworkinstructionsto fix theparts.Why didn'tyou catchthis atincominginspection?But it worksat [sistercompanylocation].JustreduceinspectioncriteriaCan youmeasureit?Will thecustomeraccept itas it is?Can wedeviateit?Is there aQualityAlert?QualityissueWhy didn'tthe supplier[thing thatgot missed]?Can you makethe CMMdimensions tomatch theproduct?It's asupplierissue.What doyou mean,"revisionlevel"?The operatorwasn't followingthe workinstructionsbut...Shouldwe rejectit?We need toshipbecausewe're pastdue.Is it in theworkinstructions?Did youdo acapabilitystudy?___ partis bad (nopart #)Can youreworkit?Did you auditthat [fill inthing thatfailed]recently?You'remeasuring itwrong if itmeasures intolerance.We needsomebody tosort.(We meanQuality)Correctiveaction?What doyou mean?We needreworkinstructionsto fix theparts.Why didn'tyou catchthis atincominginspection?But it worksat [sistercompanylocation].JustreduceinspectioncriteriaCan youmeasureit?Will thecustomeraccept itas it is?Can wedeviateit?Is there aQualityAlert?QualityissueWhy didn'tthe supplier[thing thatgot missed]?Can you makethe CMMdimensions tomatch theproduct?It's asupplierissue.What doyou mean,"revisionlevel"?The operatorwasn't followingthe workinstructionsbut...

Production Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. Should we reject it?
  2. We need to ship because we're past due.
  3. Is it in the work instructions?
  4. Did you do a capability study?
  5. ___ part is bad (no part #)
  6. Can you rework it?
  7. Did you audit that [fill in thing that failed] recently?
  8. You're measuring it wrong if it measures in tolerance.
  9. We need somebody to sort. (We mean Quality)
  10. Corrective action? What do you mean?
  11. We need rework instructions to fix the parts.
  12. Why didn't you catch this at incoming inspection?
  13. But it works at [sister company location].
  14. Just reduce inspection criteria
  15. Can you measure it?
  16. Will the customer accept it as it is?
  17. Can we deviate it?
  18. Is there a Quality Alert?
  19. Quality issue
  20. Why didn't the supplier [thing that got missed]?
  21. Can you make the CMM dimensions to match the product?
  22. It's a supplier issue.
  23. What do you mean, "revision level"?
  24. The operator wasn't following the work instructions but...