Supplierorcontractorgoes bustKevinisexcitedThehouse isNOT childfriendlyWindows aredelayed /take too longKevingives ahistorylessonEcofriendlyfeaturesPilesaredrivenStaircasedoesn'tfitOwnerhas smallchildrenLots ofconcreteis pouredKevinmakessomethingKevinlends ahandOwnerdesigned itthemselvesGrasson theroofThingsorderedfromEuropeRun out ofmoneybeforefinishedPlanningpermissiongrantedOwner fallsout with thearchitect orbuilderSomeonecries ornearlycriesWindowsdon't fitProblemswith theplanningdepartmentNohardhatsKevindoes ademoKevinsays'Bespoke'ConjugaltensionsBadweatherstops thebuildOwnerprojectmanages itthemselvesArchitectwalksoutOwnerworks onthe buildOriginalbuildingfallingdownOwnersmove inbefore it'sfinishedCountrysidelocationVisit toasupplierSomethingfalls downKevin wearsmore thanone coat atthe sametimeSomethingdoesn't fitKevinisworriedContractorwalks outOwner livesin caravanduring buildWayoverbudgetSomeonegets illduring thebuildActs ofGod stopthe buildKevinloves itSolarpanelsOwner liveswith relativesduring buildProblemswith theneighboursLocalwoodcladdingSomeonehasregretsThey wantto be in byChristmasOriginalbuildinghas to bedemolishedCitylocationNew babyarrivesduringbuildGradelistedbuildingKevinraiseseyebrowsSupplierorcontractorgoes bustKevinisexcitedThehouse isNOT childfriendlyWindows aredelayed /take too longKevingives ahistorylessonEcofriendlyfeaturesPilesaredrivenStaircasedoesn'tfitOwnerhas smallchildrenLots ofconcreteis pouredKevinmakessomethingKevinlends ahandOwnerdesigned itthemselvesGrasson theroofThingsorderedfromEuropeRun out ofmoneybeforefinishedPlanningpermissiongrantedOwner fallsout with thearchitect orbuilderSomeonecries ornearlycriesWindowsdon't fitProblemswith theplanningdepartmentNohardhatsKevindoes ademoKevinsays'Bespoke'ConjugaltensionsBadweatherstops thebuildOwnerprojectmanages itthemselvesArchitectwalksoutOwnerworks onthe buildOriginalbuildingfallingdownOwnersmove inbefore it'sfinishedCountrysidelocationVisit toasupplierSomethingfalls downKevin wearsmore thanone coat atthe sametimeSomethingdoesn't fitKevinisworriedContractorwalks outOwner livesin caravanduring buildWayoverbudgetSomeonegets illduring thebuildActs ofGod stopthe buildKevinloves itSolarpanelsOwner liveswith relativesduring buildProblemswith theneighboursLocalwoodcladdingSomeonehasregretsThey wantto be in byChristmasOriginalbuildinghas to bedemolishedCitylocationNew babyarrivesduringbuildGradelistedbuildingKevinraiseseyebrows

C4 Grand Designs - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
  1. Supplier or contractor goes bust
  2. Kevin is excited
  3. The house is NOT child friendly
  4. Windows are delayed / take too long
  5. Kevin gives a history lesson
  6. Eco friendly features
  7. Piles are driven
  8. Staircase doesn't fit
  9. Owner has small children
  10. Lots of concrete is poured
  11. Kevin makes something
  12. Kevin lends a hand
  13. Owner designed it themselves
  14. Grass on the roof
  15. Things ordered from Europe
  16. Run out of money before finished
  17. Planning permission granted
  18. Owner falls out with the architect or builder
  19. Someone cries or nearly cries
  20. Windows don't fit
  21. Problems with the planning department
  22. No hard hats
  23. Kevin does a demo
  24. Kevin says 'Bespoke'
  25. Conjugal tensions
  26. Bad weather stops the build
  27. Owner project manages it themselves
  28. Architect walks out
  29. Owner works on the build
  30. Original building falling down
  31. Owners move in before it's finished
  32. Countryside location
  33. Visit to a supplier
  34. Something falls down
  35. Kevin wears more than one coat at the same time
  36. Something doesn't fit
  37. Kevin is worried
  38. Contractor walks out
  39. Owner lives in caravan during build
  40. Way over budget
  41. Someone gets ill during the build
  42. Acts of God stop the build
  43. Kevin loves it
  44. Solar panels
  45. Owner lives with relatives during build
  46. Problems with the neighbours
  47. Local wood cladding
  48. Someone has regrets
  49. They want to be in by Christmas
  50. Original building has to be demolished
  51. City location
  52. New baby arrives during build
  53. Grade listed building
  54. Kevin raises eyebrows