Ownerhas smallchildrenSupplierorcontractorgoes bustOwnerprojectmanages itthemselvesOriginalbuildingfallingdownSomethingdoesn't fitLocalwoodcladdingStaircasedoesn'tfitKevinraiseseyebrowsProblemswith theneighboursWindows aredelayed /take too longCountrysidelocationThey wantto be in byChristmasThingsorderedfromEuropeNew babyarrivesduringbuildOwner liveswith relativesduring buildContractorwalks outKevinsays'Bespoke'PilesaredrivenOwnerdesigned itthemselvesGrasson theroofOwner fallsout with thearchitect orbuilderSomeonecries ornearlycriesKevin wearsmore thanone coat atthe sametimeArchitectwalksoutKevinisworriedOwner livesin caravanduring buildOriginalbuildinghas to bedemolishedOwnersmove inbefore it'sfinishedVisit toasupplierConjugaltensionsCitylocationKevinmakessomethingWindowsdon't fitOwnerworks onthe buildSomeonehasregretsKevingives ahistorylessonPlanningpermissiongrantedThehouse isNOT childfriendlyKevinloves itLots ofconcreteis pouredBadweatherstops thebuildWayoverbudgetSolarpanelsProblemswith theplanningdepartmentKevinisexcitedKevindoes ademoEcofriendlyfeaturesRun out ofmoneybeforefinishedNohardhatsGradelistedbuildingKevinlends ahandSomethingfalls downActs ofGod stopthe buildSomeonegets illduring thebuildOwnerhas smallchildrenSupplierorcontractorgoes bustOwnerprojectmanages itthemselvesOriginalbuildingfallingdownSomethingdoesn't fitLocalwoodcladdingStaircasedoesn'tfitKevinraiseseyebrowsProblemswith theneighboursWindows aredelayed /take too longCountrysidelocationThey wantto be in byChristmasThingsorderedfromEuropeNew babyarrivesduringbuildOwner liveswith relativesduring buildContractorwalks outKevinsays'Bespoke'PilesaredrivenOwnerdesigned itthemselvesGrasson theroofOwner fallsout with thearchitect orbuilderSomeonecries ornearlycriesKevin wearsmore thanone coat atthe sametimeArchitectwalksoutKevinisworriedOwner livesin caravanduring buildOriginalbuildinghas to bedemolishedOwnersmove inbefore it'sfinishedVisit toasupplierConjugaltensionsCitylocationKevinmakessomethingWindowsdon't fitOwnerworks onthe buildSomeonehasregretsKevingives ahistorylessonPlanningpermissiongrantedThehouse isNOT childfriendlyKevinloves itLots ofconcreteis pouredBadweatherstops thebuildWayoverbudgetSolarpanelsProblemswith theplanningdepartmentKevinisexcitedKevindoes ademoEcofriendlyfeaturesRun out ofmoneybeforefinishedNohardhatsGradelistedbuildingKevinlends ahandSomethingfalls downActs ofGod stopthe buildSomeonegets illduring thebuild

C4 Grand Designs - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
  1. Owner has small children
  2. Supplier or contractor goes bust
  3. Owner project manages it themselves
  4. Original building falling down
  5. Something doesn't fit
  6. Local wood cladding
  7. Staircase doesn't fit
  8. Kevin raises eyebrows
  9. Problems with the neighbours
  10. Windows are delayed / take too long
  11. Countryside location
  12. They want to be in by Christmas
  13. Things ordered from Europe
  14. New baby arrives during build
  15. Owner lives with relatives during build
  16. Contractor walks out
  17. Kevin says 'Bespoke'
  18. Piles are driven
  19. Owner designed it themselves
  20. Grass on the roof
  21. Owner falls out with the architect or builder
  22. Someone cries or nearly cries
  23. Kevin wears more than one coat at the same time
  24. Architect walks out
  25. Kevin is worried
  26. Owner lives in caravan during build
  27. Original building has to be demolished
  28. Owners move in before it's finished
  29. Visit to a supplier
  30. Conjugal tensions
  31. City location
  32. Kevin makes something
  33. Windows don't fit
  34. Owner works on the build
  35. Someone has regrets
  36. Kevin gives a history lesson
  37. Planning permission granted
  38. The house is NOT child friendly
  39. Kevin loves it
  40. Lots of concrete is poured
  41. Bad weather stops the build
  42. Way over budget
  43. Solar panels
  44. Problems with the planning department
  45. Kevin is excited
  46. Kevin does a demo
  47. Eco friendly features
  48. Run out of money before finished
  49. No hard hats
  50. Grade listed building
  51. Kevin lends a hand
  52. Something falls down
  53. Acts of God stop the build
  54. Someone gets ill during the build