Cyclic Correction Non- cyclic Built In Quality DTV/Alignment Final Standard Task Sheet People Improvement Take Shelter COMMWIP Continuous Improvement Be Bold Personal Protective Equipment Careline Motion Waiting TL, GL, Business Manager Be Inclusive Processing One Team Practical Problem Solving Standard Operation Sheet Inventory Electronic Job Board It's On Me Layered Audit Win with Integrity Material Movement Evacuation GPICS Follow standardized work Fire Safe Cabinets Standardization Short Lead Time JIT Status BPD Level 4 Throughput Improvement Process Employee Safety Concern Andon BPD Level 5 Five Innovate Now GSIP Think Customer Waste Over- producing Look Ahead Cyclic Correction Non- cyclic Built In Quality DTV/Alignment Final Standard Task Sheet People Improvement Take Shelter COMMWIP Continuous Improvement Be Bold Personal Protective Equipment Careline Motion Waiting TL, GL, Business Manager Be Inclusive Processing One Team Practical Problem Solving Standard Operation Sheet Inventory Electronic Job Board It's On Me Layered Audit Win with Integrity Material Movement Evacuation GPICS Follow standardized work Fire Safe Cabinets Standardization Short Lead Time JIT Status BPD Level 4 Throughput Improvement Process Employee Safety Concern Andon BPD Level 5 Five Innovate Now GSIP Think Customer Waste Over- producing Look Ahead
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Cyclic
Correction
Non-cyclic
Built In Quality
DTV/Alignment
Final
Standard Task Sheet
People Improvement
Take Shelter
COMMWIP
Continuous Improvement
Be Bold
Personal Protective Equipment
Careline
Motion
Waiting
TL,
GL,
Business Manager
Be Inclusive
Processing
One Team
Practical Problem Solving
Standard Operation Sheet
Inventory
Electronic Job Board
It's On Me
Layered Audit
Win with Integrity
Material Movement
Evacuation
GPICS
Follow standardized work
Fire Safe Cabinets
Standardization
Short Lead Time
JIT Status
BPD Level 4
Throughput Improvement Process
Employee Safety Concern
Andon
BPD Level 5
Five
Innovate Now
GSIP
Think Customer
Waste
Over-producing
Look Ahead