building automation system (BAS condenser comfort zone four- pipe system two- pipe system backflow preventer ampere convection demand charge energy charge deduct meter feeder trap grease separator voltage frequency riser potability air handling units wet bulb temperature sanitary sewer system ground fault circuit interrupter (GFCI)— vapor compression cooling tower building automation system (BAS condenser comfort zone four- pipe system two- pipe system backflow preventer ampere convection demand charge energy charge deduct meter feeder trap grease separator voltage frequency riser potability air handling units wet bulb temperature sanitary sewer system ground fault circuit interrupter (GFCI)— vapor compression cooling tower
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
building automation system (BAS
condenser
comfort zone
four-pipe system
two-pipe system
backflow preventer
ampere
convection
demand charge
energy charge
deduct meter
feeder
trap
grease separator
voltage
frequency
riser
potability
air handling units
wet bulb temperature
sanitary sewer system
ground fault circuit interrupter (GFCI)—
vapor compression
cooling tower