demand charge two- pipe system convection frequency voltage air handling units condenser ampere wet bulb temperature energy charge feeder backflow preventer cooling tower ground fault circuit interrupter (GFCI)— building automation system (BAS riser potability sanitary sewer system deduct meter comfort zone trap grease separator four- pipe system vapor compression demand charge two- pipe system convection frequency voltage air handling units condenser ampere wet bulb temperature energy charge feeder backflow preventer cooling tower ground fault circuit interrupter (GFCI)— building automation system (BAS riser potability sanitary sewer system deduct meter comfort zone trap grease separator four- pipe system vapor compression
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
demand charge
two-pipe system
convection
frequency
voltage
air handling units
condenser
ampere
wet bulb temperature
energy charge
feeder
backflow preventer
cooling tower
ground fault circuit interrupter (GFCI)—
building automation system (BAS
riser
potability
sanitary sewer system
deduct meter
comfort zone
trap
grease separator
four-pipe system
vapor compression