Been at Skanska for >2 years Asked Ruby for help/question Grew up outside of CA Manage/ Managed structure (framing, concrete) Only worked for Skanska as a GC Visited Skanska USB HQ @ Empire State Bldg Had Dusty Robotics onsite Been onsite past 7pm Been at Skanska for <1 year Completed Closeout with Skanska Have more than bachelor's degree Worked Saturday OT Received a non- engineering/ CM college degree Family works in Construction Drove to the jobsite without laptop on accident Been on a Skanska project start to finish Manage/ Managed finish trades Worked outside of CA for Skanska Manage/ Managed site utilities Grew up in SoCal Went to school outside of CA Manage/ Managed MEP trades Had a commute to job site <30 mins Worked for a subcontractor Been at Skanska for >2 years Asked Ruby for help/question Grew up outside of CA Manage/ Managed structure (framing, concrete) Only worked for Skanska as a GC Visited Skanska USB HQ @ Empire State Bldg Had Dusty Robotics onsite Been onsite past 7pm Been at Skanska for <1 year Completed Closeout with Skanska Have more than bachelor's degree Worked Saturday OT Received a non- engineering/ CM college degree Family works in Construction Drove to the jobsite without laptop on accident Been on a Skanska project start to finish Manage/ Managed finish trades Worked outside of CA for Skanska Manage/ Managed site utilities Grew up in SoCal Went to school outside of CA Manage/ Managed MEP trades Had a commute to job site <30 mins Worked for a subcontractor
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Been at Skanska for >2 years
Asked Ruby for help/question
Grew up outside of CA
Manage/ Managed structure (framing, concrete)
Only worked for Skanska as a GC
Visited Skanska USB HQ @ Empire State Bldg
Had Dusty Robotics onsite
Been onsite past 7pm
Been at Skanska for <1 year
Completed Closeout with Skanska
Have more than bachelor's degree
Worked Saturday OT
Received a non-engineering/ CM college degree
Family works in Construction
Drove to the jobsite without laptop on accident
Been on a Skanska project start to finish
Manage/ Managed finish trades
Worked outside of CA for Skanska
Manage/ Managed site utilities
Grew up in SoCal
Went to school outside of CA
Manage/ Managed MEP trades
Had a commute to job site <30 mins
Worked for a subcontractor