PPE Cabinet in Refurb or talk to your supervisor One Customer Satisfaction Safety Trainings Closed Toe Shoes Refurb & Elevator Chair, Keyboard, anti-fatigue mat Environment Leads Your Supervisor & HR A workplace Accident and Injury Reduction Group Leader Secondary Container Close PC Audits Employee Contain it Door #5/ maintenance Severe Weather Shelter Area/Lockers Staying Hydrated Pillows Data Destruction Cage & Refurb 15 Immediately & no more than 24 hours ISO Book Reduce # of Plastic water bottles Spill Proof Employee Health & Safety Shelf in paint storage room Facility Inspections February 28th - March 3rd Lunchroom Loading Dock & behind the foam room PPE Cabinet in Refurb or talk to your supervisor One Customer Satisfaction Safety Trainings Closed Toe Shoes Refurb & Elevator Chair, Keyboard, anti-fatigue mat Environment Leads Your Supervisor & HR A workplace Accident and Injury Reduction Group Leader Secondary Container Close PC Audits Employee Contain it Door #5/ maintenance Severe Weather Shelter Area/Lockers Staying Hydrated Pillows Data Destruction Cage & Refurb 15 Immediately & no more than 24 hours ISO Book Reduce # of Plastic water bottles Spill Proof Employee Health & Safety Shelf in paint storage room Facility Inspections February 28th - March 3rd Lunchroom Loading Dock & behind the foam room
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
PPE Cabinet in Refurb or talk to your supervisor
One
Customer Satisfaction
Safety Trainings
Closed Toe Shoes
Refurb & Elevator
Chair,
Keyboard,
anti-fatigue mat
Environment
Leads
Your Supervisor & HR
A workplace Accident and Injury Reduction
Group Leader
Secondary Container
Close
PC Audits
Employee
Contain it
Door #5/
maintenance
Severe Weather Shelter Area/Lockers
Staying Hydrated
Pillows
Data Destruction Cage & Refurb
15
Immediately & no more than 24 hours
ISO Book
Reduce # of Plastic water bottles
Spill Proof
Employee Health & Safety
Shelf in paint storage room
Facility Inspections
February 28th - March 3rd
Lunchroom
Loading Dock & behind the foam room