Someoneasks youto hurry upfor releaseMBR haspre-SagetemplateYourreviewcontainsan NCRDaysbetweencompletionand turn-inTheobservationrecord has atime stampYou find a'completion'TALCThe MBRis for aRawMaterialTrackedmore than 3lots of onematerialContains aConcessionTrackedthewrong lotSomethingwasn'tcircled /checkedMBR/TLFcontains aprintedtypoYourreviewcontains aDefectYourreviewcontains aVarianceYou forget toinitial status log/ assignmentslog (post-review)Initialsfrom exemployeeTechniciancorrectedthemselvesin-processSupposedto tracksomethingand didn'tRequiredadditionaldiluting /concentrating(Spiked)Forgot toinitialand dateSomeoneusingcolorfulinkContainshand writingyou canhardly readQuantity> WOpredictedYou seerepeatingnumbers (ex.555mg)Someoneasks youto hurry upfor releaseMBR haspre-SagetemplateYourreviewcontainsan NCRDaysbetweencompletionand turn-inTheobservationrecord has atime stampYou find a'completion'TALCThe MBRis for aRawMaterialTrackedmore than 3lots of onematerialContains aConcessionTrackedthewrong lotSomethingwasn'tcircled /checkedMBR/TLFcontains aprintedtypoYourreviewcontains aDefectYourreviewcontains aVarianceYou forget toinitial status log/ assignmentslog (post-review)Initialsfrom exemployeeTechniciancorrectedthemselvesin-processSupposedto tracksomethingand didn'tRequiredadditionaldiluting /concentrating(Spiked)Forgot toinitialand dateSomeoneusingcolorfulinkContainshand writingyou canhardly readQuantity> WOpredictedYou seerepeatingnumbers (ex.555mg)

Techlab Reviewer's Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. Someone asks you to hurry up for release
  2. MBR has pre-Sage template
  3. Your review contains an NCR
  4. Days between completion and turn-in
  5. The observation record has a time stamp
  6. You find a 'completion' TALC
  7. The MBR is for a Raw Material
  8. Tracked more than 3 lots of one material
  9. Contains a Concession
  10. Tracked the wrong lot
  11. Something wasn't circled / checked
  12. MBR/TLF contains a printed typo
  13. Your review contains a Defect
  14. Your review contains a Variance
  15. You forget to initial status log / assignments log (post-review)
  16. Initials from ex employee
  17. Technician corrected themselves in-process
  18. Supposed to track something and didn't
  19. Required additional diluting / concentrating (Spiked)
  20. Forgot to initial and date
  21. Someone using colorful ink
  22. Contains hand writing you can hardly read
  23. Quantity > WO predicted
  24. You see repeating numbers (ex. 555mg)