Worked on a mass timber project PUGET SOUND SCL member Worked on an all- electric project have included more than just structure and enclosure in an LCA On a technical advisory group / working group Performed an LCA (what tool?) SEAW SDC member Made carbon reductions through specification changes Presented at a conference in 2023 specified sustainably harvested biogenic materials (FSC, SFI, PEFC, Climate Smart) Went on a CLF tour CLF member had a project influenced by carbon policy of incentives Has a favorite carbon reduction strategy (what is it?) signed onto a sustainability commitment (SE 2050, MEP 2040 AIA 2030, etc) Actively worked on or supported policy Made use of architectural salvage Tracked construction emissions contributed to obtaining a green certification for a project (LEED, ILFI, etc) AIA COTE member Presented at CLF Worked on an AIA COTE winner Project Had a new EPD created for a product Used (or tried to use) ultra- low carbon concrete on a project Worked on a mass timber project PUGET SOUND SCL member Worked on an all- electric project have included more than just structure and enclosure in an LCA On a technical advisory group / working group Performed an LCA (what tool?) SEAW SDC member Made carbon reductions through specification changes Presented at a conference in 2023 specified sustainably harvested biogenic materials (FSC, SFI, PEFC, Climate Smart) Went on a CLF tour CLF member had a project influenced by carbon policy of incentives Has a favorite carbon reduction strategy (what is it?) signed onto a sustainability commitment (SE 2050, MEP 2040 AIA 2030, etc) Actively worked on or supported policy Made use of architectural salvage Tracked construction emissions contributed to obtaining a green certification for a project (LEED, ILFI, etc) AIA COTE member Presented at CLF Worked on an AIA COTE winner Project Had a new EPD created for a product Used (or tried to use) ultra- low carbon concrete on a project
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Worked on a mass timber project
PUGET SOUND SCL member
Worked on an all-electric project
have included more than just structure and enclosure in an LCA
On a technical advisory group / working group
Performed an LCA (what tool?)
SEAW SDC member
Made carbon reductions through specification changes
Presented at a conference in 2023
specified sustainably harvested biogenic materials (FSC, SFI, PEFC, Climate Smart)
Went on a CLF tour
CLF member
had a project influenced by carbon policy of incentives
Has a favorite carbon reduction strategy
(what is it?)
signed onto a sustainability commitment (SE 2050, MEP 2040 AIA 2030, etc)
Actively worked on or supported policy
Made use of architectural salvage
Tracked construction emissions
contributed to obtaining a green certification for a project (LEED, ILFI, etc)
AIA COTE member
Presented at CLF
Worked on an AIA COTE winner Project
Had a new EPD created for a product
Used (or tried to use) ultra-low carbon concrete on a project