DemoplanThis isrequiredprior toany demoSlips/FallsGoodhousekeepinghelps preventthis.RadiationKnownpotentialhazard in theradiologydept.FireExtinguisherRequired onevery projectand must becheckedmonthlyPTPRequireddaily priorto the startof workForemanWho isresponsiblefor thePTP?6'Triggerpoint for fallprotectionrequired?MedGasThis utilitycan befound inthe hospitalHousekeepingShould bedonethroughoutthe day onsite.LadderShould beset upcorrectlybefore using.SilicaCan causesilicosis ifnotcontrolledSubstitution2nd step inthehierarchyof controls.metatarsalfootguardsType of PPErequiredwhen usinga jackhammerExcavationpermitRequiredwheneverany dirt isbeingdisturbedPayattention!Is not anacceptableresponseon a PTPMaterial&ladderOver 8'long shouldbe carriedby 2 peopleLightingJobsitesshould haveproper ____PowderactuatedYou mustbe certifiedto use thistoolHearingprotectionPPE that isonly requiredwhen noiseis @ 85sB orhigherLOTOUsed toensureutilities aresafe to workon or around.FaceshieldIs requiredwhen usinga chop sawor grinder.ElectricalShould bedeenergizedprior toworking onor nearelimination1st andpreferredstep in thehierarchy ofcontrols.2-1/2moreinjurieswhen a PTPis not usedGlovesShould beworn whenworking withsharpobjects.ScaffoldMust beInspected by cacompetentperson & greentagged prior touse.HolesMust becoveredandlabeledHierarchyofcontrols5 levels ofactions toreduce orremovehazardsSubcontractorWho mustalso fillout a PTPdaily?DemoplanThis isrequiredprior toany demoSlips/FallsGoodhousekeepinghelps preventthis.RadiationKnownpotentialhazard in theradiologydept.FireExtinguisherRequired onevery projectand must becheckedmonthlyPTPRequireddaily priorto the startof workForemanWho isresponsiblefor thePTP?6'Triggerpoint for fallprotectionrequired?MedGasThis utilitycan befound inthe hospitalHousekeepingShould bedonethroughoutthe day onsite.LadderShould beset upcorrectlybefore using.SilicaCan causesilicosis ifnotcontrolledSubstitution2nd step inthehierarchyof controls.metatarsalfootguardsType of PPErequiredwhen usinga jackhammerExcavationpermitRequiredwheneverany dirt isbeingdisturbedPayattention!Is not anacceptableresponseon a PTPMaterial&ladderOver 8'long shouldbe carriedby 2 peopleLightingJobsitesshould haveproper ____PowderactuatedYou mustbe certifiedto use thistoolHearingprotectionPPE that isonly requiredwhen noiseis @ 85sB orhigherLOTOUsed toensureutilities aresafe to workon or around.FaceshieldIs requiredwhen usinga chop sawor grinder.ElectricalShould bedeenergizedprior toworking onor nearelimination1st andpreferredstep in thehierarchy ofcontrols.2-1/2moreinjurieswhen a PTPis not usedGlovesShould beworn whenworking withsharpobjects.ScaffoldMust beInspected by cacompetentperson & greentagged prior touse.HolesMust becoveredandlabeledHierarchyofcontrols5 levels ofactions toreduce orremovehazardsSubcontractorWho mustalso fillout a PTPdaily?

PTP - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
  1. This is required prior to any demo
    Demo plan
  2. Good housekeeping helps prevent this.
    Slips/Falls
  3. Known potential hazard in the radiology dept.
    Radiation
  4. Required on every project and must be checked monthly
    Fire Extinguisher
  5. Required daily prior to the start of work
    PTP
  6. Who is responsible for the PTP?
    Foreman
  7. Trigger point for fall protection required?
    6'
  8. This utility can be found in the hospital
    Med Gas
  9. Should be done throughout the day on site.
    Housekeeping
  10. Should be set up correctly before using.
    Ladder
  11. Can cause silicosis if not controlled
    Silica
  12. 2nd step in the hierarchy of controls.
    Substitution
  13. Type of PPE required when using a jack hammer
    metatarsal foot guards
  14. Required whenever any dirt is being disturbed
    Excavation permit
  15. Is not an acceptable response on a PTP
    Pay attention!
  16. Over 8' long should be carried by 2 people
    Material & ladder
  17. Jobsites should have proper ____
    Lighting
  18. You must be certified to use this tool
    Powder actuated
  19. PPE that is only required when noise is @ 85sB or higher
    Hearing protection
  20. Used to ensure utilities are safe to work on or around.
    LOTO
  21. Is required when using a chop saw or grinder.
    Face shield
  22. Should be deenergized prior to working on or near
    Electrical
  23. 1st and preferred step in the hierarchy of controls.
    elimination
  24. more injuries when a PTP is not used
    2-1/2
  25. Should be worn when working with sharp objects.
    Gloves
  26. Must be Inspected by ca competent person & green tagged prior to use.
    Scaffold
  27. Must be covered and labeled
    Holes
  28. 5 levels of actions to reduce or remove hazards
    Hierarchy of controls
  29. Who must also fill out a PTP daily?
    Subcontractor