RadiationKnownpotentialhazard in theradiologydept.SilicaCan causesilicosis ifnotcontrolledHearingprotectionPPE that isonly requiredwhen noiseis @ 85sB orhigherScaffoldMust beInspected by cacompetentperson & greentagged prior touse.HousekeepingShould bedonethroughoutthe day onsite.ExcavationpermitRequiredwheneverany dirt isbeingdisturbedLightingJobsitesshould haveproper ____LadderShould beset upcorrectlybefore using.Substitution2nd step inthehierarchyof controls.LOTOUsed toensureutilities aresafe to workon or around.GlovesShould beworn whenworking withsharpobjects.Material&ladderOver 8'long shouldbe carriedby 2 peoplePayattention!Is not anacceptableresponseon a PTPElectricalShould bedeenergizedprior toworking onor nearForemanWho isresponsiblefor thePTP?DemoplanThis isrequiredprior toany demometatarsalfootguardsType of PPErequiredwhen usinga jackhammer6'Triggerpoint for fallprotectionrequired?2-1/2moreinjurieswhen a PTPis not usedFireExtinguisherRequired onevery projectand must becheckedmonthlyFaceshieldIs requiredwhen usinga chop sawor grinder.MedGasThis utilitycan befound inthe hospitalelimination1st andpreferredstep in thehierarchy ofcontrols.Slips/FallsGoodhousekeepinghelps preventthis.PTPRequireddaily priorto the startof workPowderactuatedYou mustbe certifiedto use thistoolHolesMust becoveredandlabeledHierarchyofcontrols5 levels ofactions toreduce orremovehazardsSubcontractorWho mustalso fillout a PTPdaily?RadiationKnownpotentialhazard in theradiologydept.SilicaCan causesilicosis ifnotcontrolledHearingprotectionPPE that isonly requiredwhen noiseis @ 85sB orhigherScaffoldMust beInspected by cacompetentperson & greentagged prior touse.HousekeepingShould bedonethroughoutthe day onsite.ExcavationpermitRequiredwheneverany dirt isbeingdisturbedLightingJobsitesshould haveproper ____LadderShould beset upcorrectlybefore using.Substitution2nd step inthehierarchyof controls.LOTOUsed toensureutilities aresafe to workon or around.GlovesShould beworn whenworking withsharpobjects.Material&ladderOver 8'long shouldbe carriedby 2 peoplePayattention!Is not anacceptableresponseon a PTPElectricalShould bedeenergizedprior toworking onor nearForemanWho isresponsiblefor thePTP?DemoplanThis isrequiredprior toany demometatarsalfootguardsType of PPErequiredwhen usinga jackhammer6'Triggerpoint for fallprotectionrequired?2-1/2moreinjurieswhen a PTPis not usedFireExtinguisherRequired onevery projectand must becheckedmonthlyFaceshieldIs requiredwhen usinga chop sawor grinder.MedGasThis utilitycan befound inthe hospitalelimination1st andpreferredstep in thehierarchy ofcontrols.Slips/FallsGoodhousekeepinghelps preventthis.PTPRequireddaily priorto the startof workPowderactuatedYou mustbe certifiedto use thistoolHolesMust becoveredandlabeledHierarchyofcontrols5 levels ofactions toreduce orremovehazardsSubcontractorWho mustalso fillout a PTPdaily?

PTP - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
  1. Known potential hazard in the radiology dept.
    Radiation
  2. Can cause silicosis if not controlled
    Silica
  3. PPE that is only required when noise is @ 85sB or higher
    Hearing protection
  4. Must be Inspected by ca competent person & green tagged prior to use.
    Scaffold
  5. Should be done throughout the day on site.
    Housekeeping
  6. Required whenever any dirt is being disturbed
    Excavation permit
  7. Jobsites should have proper ____
    Lighting
  8. Should be set up correctly before using.
    Ladder
  9. 2nd step in the hierarchy of controls.
    Substitution
  10. Used to ensure utilities are safe to work on or around.
    LOTO
  11. Should be worn when working with sharp objects.
    Gloves
  12. Over 8' long should be carried by 2 people
    Material & ladder
  13. Is not an acceptable response on a PTP
    Pay attention!
  14. Should be deenergized prior to working on or near
    Electrical
  15. Who is responsible for the PTP?
    Foreman
  16. This is required prior to any demo
    Demo plan
  17. Type of PPE required when using a jack hammer
    metatarsal foot guards
  18. Trigger point for fall protection required?
    6'
  19. more injuries when a PTP is not used
    2-1/2
  20. Required on every project and must be checked monthly
    Fire Extinguisher
  21. Is required when using a chop saw or grinder.
    Face shield
  22. This utility can be found in the hospital
    Med Gas
  23. 1st and preferred step in the hierarchy of controls.
    elimination
  24. Good housekeeping helps prevent this.
    Slips/Falls
  25. Required daily prior to the start of work
    PTP
  26. You must be certified to use this tool
    Powder actuated
  27. Must be covered and labeled
    Holes
  28. 5 levels of actions to reduce or remove hazards
    Hierarchy of controls
  29. Who must also fill out a PTP daily?
    Subcontractor