(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Required daily prior to the start of work
PTP
Should be set up correctly before using.
Ladder
PPE that is only required when noise is @ 85sB or higher
Hearing protection
Can cause silicosis if not controlled
Silica
Should be done throughout the day on site.
Housekeeping
This is required prior to any demo
Demo plan
Required on every project and must be checked monthly
Fire Extinguisher
Must be Inspected by ca competent person & green tagged prior to use.
Scaffold
Is not an acceptable response on a PTP
Pay attention!
2nd step in the hierarchy of controls.
Substitution
This utility can be found in the hospital
Med Gas
Required whenever any dirt is being disturbed
Excavation permit
Over 8' long should be carried by 2 people
Material & ladder
You must be certified to use this tool
Powder actuated
Who is responsible for the PTP?
Foreman
Used to ensure utilities are safe to work on or around.
LOTO
Should be deenergized prior to working on or near
Electrical
5 levels of actions to reduce or remove hazards
Hierarchy of controls
Good housekeeping helps prevent this.
Slips/Falls
Should be worn when working with sharp objects.
Gloves
Who must also fill out a PTP daily?
Subcontractor
1st and preferred step in the hierarchy of controls.
elimination
Jobsites should have proper ____
Lighting
Trigger point for fall protection required?
6'
Must be covered and labeled
Holes
Is required when using a chop saw or grinder.
Face shield
Known potential hazard in the radiology dept.
Radiation
more injuries when a PTP is not used
2-1/2
Type of PPE required when using a jack hammer
metatarsal foot guards