SubcontractorWho mustalso fillout a PTPdaily?RadiationKnownpotentialhazard in theradiologydept.FireExtinguisherRequired onevery projectand must becheckedmonthlyLightingJobsitesshould haveproper ____PowderactuatedYou mustbe certifiedto use thistoolForemanWho isresponsiblefor thePTP?elimination1st andpreferredstep in thehierarchy ofcontrols.Substitution2nd step inthehierarchyof controls.GlovesShould beworn whenworking withsharpobjects.SilicaCan causesilicosis ifnotcontrolledMedGasThis utilitycan befound inthe hospital6'Triggerpoint for fallprotectionrequired?ScaffoldMust beInspected by cacompetentperson & greentagged prior touse.PTPRequireddaily priorto the startof workPayattention!Is not anacceptableresponseon a PTPExcavationpermitRequiredwheneverany dirt isbeingdisturbedLOTOUsed toensureutilities aresafe to workon or around.2-1/2moreinjurieswhen a PTPis not usedHolesMust becoveredandlabeledDemoplanThis isrequiredprior toany demoSlips/FallsGoodhousekeepinghelps preventthis.FaceshieldIs requiredwhen usinga chop sawor grinder.Hierarchyofcontrols5 levels ofactions toreduce orremovehazardsHearingprotectionPPE that isonly requiredwhen noiseis @ 85sB orhighermetatarsalfootguardsType of PPErequiredwhen usinga jackhammerHousekeepingShould bedonethroughoutthe day onsite.LadderShould beset upcorrectlybefore using.Material&ladderOver 8'long shouldbe carriedby 2 peopleElectricalShould bedeenergizedprior toworking onor nearSubcontractorWho mustalso fillout a PTPdaily?RadiationKnownpotentialhazard in theradiologydept.FireExtinguisherRequired onevery projectand must becheckedmonthlyLightingJobsitesshould haveproper ____PowderactuatedYou mustbe certifiedto use thistoolForemanWho isresponsiblefor thePTP?elimination1st andpreferredstep in thehierarchy ofcontrols.Substitution2nd step inthehierarchyof controls.GlovesShould beworn whenworking withsharpobjects.SilicaCan causesilicosis ifnotcontrolledMedGasThis utilitycan befound inthe hospital6'Triggerpoint for fallprotectionrequired?ScaffoldMust beInspected by cacompetentperson & greentagged prior touse.PTPRequireddaily priorto the startof workPayattention!Is not anacceptableresponseon a PTPExcavationpermitRequiredwheneverany dirt isbeingdisturbedLOTOUsed toensureutilities aresafe to workon or around.2-1/2moreinjurieswhen a PTPis not usedHolesMust becoveredandlabeledDemoplanThis isrequiredprior toany demoSlips/FallsGoodhousekeepinghelps preventthis.FaceshieldIs requiredwhen usinga chop sawor grinder.Hierarchyofcontrols5 levels ofactions toreduce orremovehazardsHearingprotectionPPE that isonly requiredwhen noiseis @ 85sB orhighermetatarsalfootguardsType of PPErequiredwhen usinga jackhammerHousekeepingShould bedonethroughoutthe day onsite.LadderShould beset upcorrectlybefore using.Material&ladderOver 8'long shouldbe carriedby 2 peopleElectricalShould bedeenergizedprior toworking onor near

PTP - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
  1. Who must also fill out a PTP daily?
    Subcontractor
  2. Known potential hazard in the radiology dept.
    Radiation
  3. Required on every project and must be checked monthly
    Fire Extinguisher
  4. Jobsites should have proper ____
    Lighting
  5. You must be certified to use this tool
    Powder actuated
  6. Who is responsible for the PTP?
    Foreman
  7. 1st and preferred step in the hierarchy of controls.
    elimination
  8. 2nd step in the hierarchy of controls.
    Substitution
  9. Should be worn when working with sharp objects.
    Gloves
  10. Can cause silicosis if not controlled
    Silica
  11. This utility can be found in the hospital
    Med Gas
  12. Trigger point for fall protection required?
    6'
  13. Must be Inspected by ca competent person & green tagged prior to use.
    Scaffold
  14. Required daily prior to the start of work
    PTP
  15. Is not an acceptable response on a PTP
    Pay attention!
  16. Required whenever any dirt is being disturbed
    Excavation permit
  17. Used to ensure utilities are safe to work on or around.
    LOTO
  18. more injuries when a PTP is not used
    2-1/2
  19. Must be covered and labeled
    Holes
  20. This is required prior to any demo
    Demo plan
  21. Good housekeeping helps prevent this.
    Slips/Falls
  22. Is required when using a chop saw or grinder.
    Face shield
  23. 5 levels of actions to reduce or remove hazards
    Hierarchy of controls
  24. PPE that is only required when noise is @ 85sB or higher
    Hearing protection
  25. Type of PPE required when using a jack hammer
    metatarsal foot guards
  26. Should be done throughout the day on site.
    Housekeeping
  27. Should be set up correctly before using.
    Ladder
  28. Over 8' long should be carried by 2 people
    Material & ladder
  29. Should be deenergized prior to working on or near
    Electrical