PTPRequireddaily priorto the startof workDemoplanThis isrequiredprior toany demoLOTOUsed toensureutilities aresafe to workon or around.Slips/FallsGoodhousekeepinghelps preventthis.MedGasThis utilitycan befound inthe hospitalScaffoldMust beInspected by cacompetentperson & greentagged prior touse.elimination1st andpreferredstep in thehierarchy ofcontrols.GlovesShould beworn whenworking withsharpobjects.PowderactuatedYou mustbe certifiedto use thistoolSilicaCan causesilicosis ifnotcontrolledMaterial&ladderOver 8'long shouldbe carriedby 2 peopleHolesMust becoveredandlabeledSubcontractorWho mustalso fillout a PTPdaily?HousekeepingShould bedonethroughoutthe day onsite.metatarsalfootguardsType of PPErequiredwhen usinga jackhammerHearingprotectionPPE that isonly requiredwhen noiseis @ 85sB orhigherRadiationKnownpotentialhazard in theradiologydept.Payattention!Is not anacceptableresponseon a PTPLadderShould beset upcorrectlybefore using.ForemanWho isresponsiblefor thePTP?ExcavationpermitRequiredwheneverany dirt isbeingdisturbedLightingJobsitesshould haveproper ____Substitution2nd step inthehierarchyof controls.6'Triggerpoint for fallprotectionrequired?Hierarchyofcontrols5 levels ofactions toreduce orremovehazardsElectricalShould bedeenergizedprior toworking onor nearFireExtinguisherRequired onevery projectand must becheckedmonthlyFaceshieldIs requiredwhen usinga chop sawor grinder.2-1/2moreinjurieswhen a PTPis not usedPTPRequireddaily priorto the startof workDemoplanThis isrequiredprior toany demoLOTOUsed toensureutilities aresafe to workon or around.Slips/FallsGoodhousekeepinghelps preventthis.MedGasThis utilitycan befound inthe hospitalScaffoldMust beInspected by cacompetentperson & greentagged prior touse.elimination1st andpreferredstep in thehierarchy ofcontrols.GlovesShould beworn whenworking withsharpobjects.PowderactuatedYou mustbe certifiedto use thistoolSilicaCan causesilicosis ifnotcontrolledMaterial&ladderOver 8'long shouldbe carriedby 2 peopleHolesMust becoveredandlabeledSubcontractorWho mustalso fillout a PTPdaily?HousekeepingShould bedonethroughoutthe day onsite.metatarsalfootguardsType of PPErequiredwhen usinga jackhammerHearingprotectionPPE that isonly requiredwhen noiseis @ 85sB orhigherRadiationKnownpotentialhazard in theradiologydept.Payattention!Is not anacceptableresponseon a PTPLadderShould beset upcorrectlybefore using.ForemanWho isresponsiblefor thePTP?ExcavationpermitRequiredwheneverany dirt isbeingdisturbedLightingJobsitesshould haveproper ____Substitution2nd step inthehierarchyof controls.6'Triggerpoint for fallprotectionrequired?Hierarchyofcontrols5 levels ofactions toreduce orremovehazardsElectricalShould bedeenergizedprior toworking onor nearFireExtinguisherRequired onevery projectand must becheckedmonthlyFaceshieldIs requiredwhen usinga chop sawor grinder.2-1/2moreinjurieswhen a PTPis not used

PTP - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
  1. Required daily prior to the start of work
    PTP
  2. This is required prior to any demo
    Demo plan
  3. Used to ensure utilities are safe to work on or around.
    LOTO
  4. Good housekeeping helps prevent this.
    Slips/Falls
  5. This utility can be found in the hospital
    Med Gas
  6. Must be Inspected by ca competent person & green tagged prior to use.
    Scaffold
  7. 1st and preferred step in the hierarchy of controls.
    elimination
  8. Should be worn when working with sharp objects.
    Gloves
  9. You must be certified to use this tool
    Powder actuated
  10. Can cause silicosis if not controlled
    Silica
  11. Over 8' long should be carried by 2 people
    Material & ladder
  12. Must be covered and labeled
    Holes
  13. Who must also fill out a PTP daily?
    Subcontractor
  14. Should be done throughout the day on site.
    Housekeeping
  15. Type of PPE required when using a jack hammer
    metatarsal foot guards
  16. PPE that is only required when noise is @ 85sB or higher
    Hearing protection
  17. Known potential hazard in the radiology dept.
    Radiation
  18. Is not an acceptable response on a PTP
    Pay attention!
  19. Should be set up correctly before using.
    Ladder
  20. Who is responsible for the PTP?
    Foreman
  21. Required whenever any dirt is being disturbed
    Excavation permit
  22. Jobsites should have proper ____
    Lighting
  23. 2nd step in the hierarchy of controls.
    Substitution
  24. Trigger point for fall protection required?
    6'
  25. 5 levels of actions to reduce or remove hazards
    Hierarchy of controls
  26. Should be deenergized prior to working on or near
    Electrical
  27. Required on every project and must be checked monthly
    Fire Extinguisher
  28. Is required when using a chop saw or grinder.
    Face shield
  29. more injuries when a PTP is not used
    2-1/2