HousekeepingShould bedonethroughoutthe day onsite.ScaffoldMust beInspected by cacompetentperson & greentagged prior touse.Substitution2nd step inthehierarchyof controls.ElectricalShould bedeenergizedprior toworking onor nearLightingJobsitesshould haveproper ____DemoplanThis isrequiredprior toany demoHierarchyofcontrols5 levels ofactions toreduce orremovehazardsGlovesShould beworn whenworking withsharpobjects.LOTOUsed toensureutilities aresafe to workon or around.6'Triggerpoint for fallprotectionrequired?PTPRequireddaily priorto the startof workSilicaCan causesilicosis ifnotcontrolledSlips/FallsGoodhousekeepinghelps preventthis.Payattention!Is not anacceptableresponseon a PTPMedGasThis utilitycan befound inthe hospitalmetatarsalfootguardsType of PPErequiredwhen usinga jackhammerFaceshieldIs requiredwhen usinga chop sawor grinder.LadderShould beset upcorrectlybefore using.ForemanWho isresponsiblefor thePTP?PowderactuatedYou mustbe certifiedto use thistoolelimination1st andpreferredstep in thehierarchy ofcontrols.RadiationKnownpotentialhazard in theradiologydept.FireExtinguisherRequired onevery projectand must becheckedmonthlyExcavationpermitRequiredwheneverany dirt isbeingdisturbedHearingprotectionPPE that isonly requiredwhen noiseis @ 85sB orhigherSubcontractorWho mustalso fillout a PTPdaily?HolesMust becoveredandlabeledMaterial&ladderOver 8'long shouldbe carriedby 2 people2-1/2moreinjurieswhen a PTPis not usedHousekeepingShould bedonethroughoutthe day onsite.ScaffoldMust beInspected by cacompetentperson & greentagged prior touse.Substitution2nd step inthehierarchyof controls.ElectricalShould bedeenergizedprior toworking onor nearLightingJobsitesshould haveproper ____DemoplanThis isrequiredprior toany demoHierarchyofcontrols5 levels ofactions toreduce orremovehazardsGlovesShould beworn whenworking withsharpobjects.LOTOUsed toensureutilities aresafe to workon or around.6'Triggerpoint for fallprotectionrequired?PTPRequireddaily priorto the startof workSilicaCan causesilicosis ifnotcontrolledSlips/FallsGoodhousekeepinghelps preventthis.Payattention!Is not anacceptableresponseon a PTPMedGasThis utilitycan befound inthe hospitalmetatarsalfootguardsType of PPErequiredwhen usinga jackhammerFaceshieldIs requiredwhen usinga chop sawor grinder.LadderShould beset upcorrectlybefore using.ForemanWho isresponsiblefor thePTP?PowderactuatedYou mustbe certifiedto use thistoolelimination1st andpreferredstep in thehierarchy ofcontrols.RadiationKnownpotentialhazard in theradiologydept.FireExtinguisherRequired onevery projectand must becheckedmonthlyExcavationpermitRequiredwheneverany dirt isbeingdisturbedHearingprotectionPPE that isonly requiredwhen noiseis @ 85sB orhigherSubcontractorWho mustalso fillout a PTPdaily?HolesMust becoveredandlabeledMaterial&ladderOver 8'long shouldbe carriedby 2 people2-1/2moreinjurieswhen a PTPis not used

PTP - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
  1. Should be done throughout the day on site.
    Housekeeping
  2. Must be Inspected by ca competent person & green tagged prior to use.
    Scaffold
  3. 2nd step in the hierarchy of controls.
    Substitution
  4. Should be deenergized prior to working on or near
    Electrical
  5. Jobsites should have proper ____
    Lighting
  6. This is required prior to any demo
    Demo plan
  7. 5 levels of actions to reduce or remove hazards
    Hierarchy of controls
  8. Should be worn when working with sharp objects.
    Gloves
  9. Used to ensure utilities are safe to work on or around.
    LOTO
  10. Trigger point for fall protection required?
    6'
  11. Required daily prior to the start of work
    PTP
  12. Can cause silicosis if not controlled
    Silica
  13. Good housekeeping helps prevent this.
    Slips/Falls
  14. Is not an acceptable response on a PTP
    Pay attention!
  15. This utility can be found in the hospital
    Med Gas
  16. Type of PPE required when using a jack hammer
    metatarsal foot guards
  17. Is required when using a chop saw or grinder.
    Face shield
  18. Should be set up correctly before using.
    Ladder
  19. Who is responsible for the PTP?
    Foreman
  20. You must be certified to use this tool
    Powder actuated
  21. 1st and preferred step in the hierarchy of controls.
    elimination
  22. Known potential hazard in the radiology dept.
    Radiation
  23. Required on every project and must be checked monthly
    Fire Extinguisher
  24. Required whenever any dirt is being disturbed
    Excavation permit
  25. PPE that is only required when noise is @ 85sB or higher
    Hearing protection
  26. Who must also fill out a PTP daily?
    Subcontractor
  27. Must be covered and labeled
    Holes
  28. Over 8' long should be carried by 2 people
    Material & ladder
  29. more injuries when a PTP is not used
    2-1/2