2-1/2moreinjurieswhen a PTPis not usedRadiationKnownpotentialhazard in theradiologydept.HolesMust becoveredandlabeledSlips/FallsGoodhousekeepinghelps preventthis.ElectricalShould bedeenergizedprior toworking onor nearPTPRequireddaily priorto the startof workForemanWho isresponsiblefor thePTP?Hierarchyofcontrols5 levels ofactions toreduce orremovehazardsLightingJobsitesshould haveproper ____Payattention!Is not anacceptableresponseon a PTPmetatarsalfootguardsType of PPErequiredwhen usinga jackhammerSilicaCan causesilicosis ifnotcontrolledMaterial&ladderOver 8'long shouldbe carriedby 2 peopleHearingprotectionPPE that isonly requiredwhen noiseis @ 85sB orhigher6'Triggerpoint for fallprotectionrequired?DemoplanThis isrequiredprior toany demoLOTOUsed toensureutilities aresafe to workon or around.elimination1st andpreferredstep in thehierarchy ofcontrols.LadderShould beset upcorrectlybefore using.FireExtinguisherRequired onevery projectand must becheckedmonthlyScaffoldMust beInspected by cacompetentperson & greentagged prior touse.ExcavationpermitRequiredwheneverany dirt isbeingdisturbedSubstitution2nd step inthehierarchyof controls.PowderactuatedYou mustbe certifiedto use thistoolHousekeepingShould bedonethroughoutthe day onsite.SubcontractorWho mustalso fillout a PTPdaily?GlovesShould beworn whenworking withsharpobjects.FaceshieldIs requiredwhen usinga chop sawor grinder.MedGasThis utilitycan befound inthe hospital2-1/2moreinjurieswhen a PTPis not usedRadiationKnownpotentialhazard in theradiologydept.HolesMust becoveredandlabeledSlips/FallsGoodhousekeepinghelps preventthis.ElectricalShould bedeenergizedprior toworking onor nearPTPRequireddaily priorto the startof workForemanWho isresponsiblefor thePTP?Hierarchyofcontrols5 levels ofactions toreduce orremovehazardsLightingJobsitesshould haveproper ____Payattention!Is not anacceptableresponseon a PTPmetatarsalfootguardsType of PPErequiredwhen usinga jackhammerSilicaCan causesilicosis ifnotcontrolledMaterial&ladderOver 8'long shouldbe carriedby 2 peopleHearingprotectionPPE that isonly requiredwhen noiseis @ 85sB orhigher6'Triggerpoint for fallprotectionrequired?DemoplanThis isrequiredprior toany demoLOTOUsed toensureutilities aresafe to workon or around.elimination1st andpreferredstep in thehierarchy ofcontrols.LadderShould beset upcorrectlybefore using.FireExtinguisherRequired onevery projectand must becheckedmonthlyScaffoldMust beInspected by cacompetentperson & greentagged prior touse.ExcavationpermitRequiredwheneverany dirt isbeingdisturbedSubstitution2nd step inthehierarchyof controls.PowderactuatedYou mustbe certifiedto use thistoolHousekeepingShould bedonethroughoutthe day onsite.SubcontractorWho mustalso fillout a PTPdaily?GlovesShould beworn whenworking withsharpobjects.FaceshieldIs requiredwhen usinga chop sawor grinder.MedGasThis utilitycan befound inthe hospital

PTP - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
  1. more injuries when a PTP is not used
    2-1/2
  2. Known potential hazard in the radiology dept.
    Radiation
  3. Must be covered and labeled
    Holes
  4. Good housekeeping helps prevent this.
    Slips/Falls
  5. Should be deenergized prior to working on or near
    Electrical
  6. Required daily prior to the start of work
    PTP
  7. Who is responsible for the PTP?
    Foreman
  8. 5 levels of actions to reduce or remove hazards
    Hierarchy of controls
  9. Jobsites should have proper ____
    Lighting
  10. Is not an acceptable response on a PTP
    Pay attention!
  11. Type of PPE required when using a jack hammer
    metatarsal foot guards
  12. Can cause silicosis if not controlled
    Silica
  13. Over 8' long should be carried by 2 people
    Material & ladder
  14. PPE that is only required when noise is @ 85sB or higher
    Hearing protection
  15. Trigger point for fall protection required?
    6'
  16. This is required prior to any demo
    Demo plan
  17. Used to ensure utilities are safe to work on or around.
    LOTO
  18. 1st and preferred step in the hierarchy of controls.
    elimination
  19. Should be set up correctly before using.
    Ladder
  20. Required on every project and must be checked monthly
    Fire Extinguisher
  21. Must be Inspected by ca competent person & green tagged prior to use.
    Scaffold
  22. Required whenever any dirt is being disturbed
    Excavation permit
  23. 2nd step in the hierarchy of controls.
    Substitution
  24. You must be certified to use this tool
    Powder actuated
  25. Should be done throughout the day on site.
    Housekeeping
  26. Who must also fill out a PTP daily?
    Subcontractor
  27. Should be worn when working with sharp objects.
    Gloves
  28. Is required when using a chop saw or grinder.
    Face shield
  29. This utility can be found in the hospital
    Med Gas