(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Should be done throughout the day on site.
Housekeeping
Must be Inspected by ca competent person & green tagged prior to use.
Scaffold
2nd step in the hierarchy of controls.
Substitution
Should be deenergized prior to working on or near
Electrical
Jobsites should have proper ____
Lighting
This is required prior to any demo
Demo plan
5 levels of actions to reduce or remove hazards
Hierarchy of controls
Should be worn when working with sharp objects.
Gloves
Used to ensure utilities are safe to work on or around.
LOTO
Trigger point for fall protection required?
6'
Required daily prior to the start of work
PTP
Can cause silicosis if not controlled
Silica
Good housekeeping helps prevent this.
Slips/Falls
Is not an acceptable response on a PTP
Pay attention!
This utility can be found in the hospital
Med Gas
Type of PPE required when using a jack hammer
metatarsal foot guards
Is required when using a chop saw or grinder.
Face shield
Should be set up correctly before using.
Ladder
Who is responsible for the PTP?
Foreman
You must be certified to use this tool
Powder actuated
1st and preferred step in the hierarchy of controls.
elimination
Known potential hazard in the radiology dept.
Radiation
Required on every project and must be checked monthly
Fire Extinguisher
Required whenever any dirt is being disturbed
Excavation permit
PPE that is only required when noise is @ 85sB or higher
Hearing protection
Who must also fill out a PTP daily?
Subcontractor
Must be covered and labeled
Holes
Over 8' long should be carried by 2 people
Material & ladder