Cross Sections End the streak Underwater Inspection FTW Bridge BSSP AssestWise Vertical Clearance Measurements Flood Inspection Bridge Inspection Reports Asbestos Culverts RRP Fire Damage HBP Checker BRG_PD_PSE@txdot.gov 2 year inspection cycle MBITS 3D Model Organization chart Bridge Layout Checklist Bridge Detailing Guide EIT Span Bridge Bridge Division Air Monitoring Local Govenments BPM Steel bent caps District Bridge Corrosion Designer Columns Bridge Hit Bridge Layout BMIP FUA Project Wise Scour Data Sheets Rescue plan PBLR Memo Bridge Inspection Railroad Exhibit A Caps H&H Report Plan and Profile Sheets Confined Space District Bridge Engineer Ventilation Restricted entry PBLR Retaining Walls PSN Quality Assurance (QA) Condition Ratings New bridges Cursory Review Bridge widening CAT 6 Funding Bridge Project Development Manual Signed Page 3 of 1002 NBI Quality Control (QC) As Builts Load Ratings Deck Punchouts Co- Op Lead Abatement Non- redundant Steel Member 0.36% Cross Sections End the streak Underwater Inspection FTW Bridge BSSP AssestWise Vertical Clearance Measurements Flood Inspection Bridge Inspection Reports Asbestos Culverts RRP Fire Damage HBP Checker BRG_PD_PSE@txdot.gov 2 year inspection cycle MBITS 3D Model Organization chart Bridge Layout Checklist Bridge Detailing Guide EIT Span Bridge Bridge Division Air Monitoring Local Govenments BPM Steel bent caps District Bridge Corrosion Designer Columns Bridge Hit Bridge Layout BMIP FUA Project Wise Scour Data Sheets Rescue plan PBLR Memo Bridge Inspection Railroad Exhibit A Caps H&H Report Plan and Profile Sheets Confined Space District Bridge Engineer Ventilation Restricted entry PBLR Retaining Walls PSN Quality Assurance (QA) Condition Ratings New bridges Cursory Review Bridge widening CAT 6 Funding Bridge Project Development Manual Signed Page 3 of 1002 NBI Quality Control (QC) As Builts Load Ratings Deck Punchouts Co- Op Lead Abatement Non- redundant Steel Member 0.36%
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Cross Sections
End the streak
Underwater Inspection
FTW Bridge
BSSP
AssestWise
Vertical Clearance Measurements
Flood Inspection
Bridge Inspection Reports
Asbestos
Culverts
RRP
Fire Damage
HBP
Checker
BRG_PD_PSE@txdot.gov
2 year inspection cycle
MBITS
3D Model
Organization chart
Bridge Layout Checklist
Bridge Detailing Guide
EIT
Span Bridge
Bridge Division
Air Monitoring
Local Govenments
BPM
Steel bent caps
District Bridge
Corrosion
Designer
Columns
Bridge Hit
Bridge Layout
BMIP
FUA
Project Wise
Scour Data Sheets
Rescue plan
PBLR Memo
Bridge Inspection
Railroad Exhibit A
Caps
H&H Report
Plan and Profile Sheets
Confined Space
District Bridge Engineer
Ventilation
Restricted entry
PBLR
Retaining Walls
PSN
Quality Assurance (QA)
Condition Ratings
New bridges
Cursory Review
Bridge widening
CAT 6 Funding
Bridge Project Development Manual
Signed Page 3 of 1002
NBI
Quality Control (QC)
As Builts
Load Ratings
Deck Punchouts
Co-Op
Lead Abatement
Non-redundant Steel Member
0.36%