Assembly Point RIDDOR Risk assessment Slips, trips and falls Ergonomics First aid kit First Aiders High- Visibility Vest Safety Culture Hand sanitisers Electrical safety RISKS Telephone Harassment Hazards Safe lifting Occupational Health and Safety Act Slip hazard Test Smoke Alarms Monthly DSE (Display Screen Equipment) Emergency exit Fire Extinguisher Enhanced Emergency Evacuation PPE (Personal Protective Equipment) Workplace injury Fire drill Emergency Contacts Near Miss Workstation setup Fire Alarm Incident reporting Spill cleanup Good Housekeeping Practices Datix First Aid Fully charged Phone Health and Safety Policy Health and Safety Site Assessment Survive and Thrive Compliance Navigating Winter Roads Stress Management Keeping Fire Doors Closed Fire Warden 20-20- 20 Rule Line Managers Responsibilities Evacuation plan PAT Testing Keeping Corridors Clear Fire Risk Assessment Lone Working Procedures Emergency Exit Ventilation DSE (Display Screen Equipment) Assessment Spill Control Assembly Point RIDDOR Risk assessment Slips, trips and falls Ergonomics First aid kit First Aiders High- Visibility Vest Safety Culture Hand sanitisers Electrical safety RISKS Telephone Harassment Hazards Safe lifting Occupational Health and Safety Act Slip hazard Test Smoke Alarms Monthly DSE (Display Screen Equipment) Emergency exit Fire Extinguisher Enhanced Emergency Evacuation PPE (Personal Protective Equipment) Workplace injury Fire drill Emergency Contacts Near Miss Workstation setup Fire Alarm Incident reporting Spill cleanup Good Housekeeping Practices Datix First Aid Fully charged Phone Health and Safety Policy Health and Safety Site Assessment Survive and Thrive Compliance Navigating Winter Roads Stress Management Keeping Fire Doors Closed Fire Warden 20-20- 20 Rule Line Managers Responsibilities Evacuation plan PAT Testing Keeping Corridors Clear Fire Risk Assessment Lone Working Procedures Emergency Exit Ventilation DSE (Display Screen Equipment) Assessment Spill Control
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Assembly Point
RIDDOR
Risk assessment
Slips, trips and falls
Ergonomics
First aid kit
First Aiders
High-Visibility Vest
Safety Culture
Hand sanitisers
Electrical safety
RISKS
Telephone Harassment
Hazards
Safe lifting
Occupational Health and Safety Act
Slip hazard
Test Smoke Alarms Monthly
DSE (Display Screen Equipment)
Emergency exit
Fire Extinguisher
Enhanced Emergency Evacuation
PPE (Personal Protective Equipment)
Workplace injury
Fire drill
Emergency Contacts
Near Miss
Workstation setup
Fire Alarm
Incident reporting
Spill cleanup
Good Housekeeping Practices
Datix
First Aid
Fully charged Phone
Health and Safety Policy
Health and Safety Site Assessment
Survive and Thrive
Compliance
Navigating Winter Roads
Stress Management
Keeping Fire Doors Closed
Fire Warden
20-20-20 Rule
Line Managers Responsibilities
Evacuation plan
PAT Testing
Keeping Corridors Clear
Fire Risk Assessment
Lone Working Procedures
Emergency Exit
Ventilation
DSE (Display Screen Equipment) Assessment
Spill Control