Fire Extinguisher DSE (Display Screen Equipment) Assessment Spill cleanup Good Housekeeping Practices Occupational Health and Safety Act Emergency Exit Workplace injury Spill Control First Aid Evacuation plan Datix Ventilation Risk assessment Line Managers Responsibilities Telephone Harassment PPE (Personal Protective Equipment) Incident reporting Stress Management Health and Safety Policy Fire Warden 20-20- 20 Rule Navigating Winter Roads Assembly Point Health and Safety Site Assessment Fire Risk Assessment RIDDOR Fully charged Phone Fire drill Emergency exit Electrical safety Enhanced Emergency Evacuation Slips, trips and falls Near Miss High- Visibility Vest Safe lifting Compliance First aid kit Survive and Thrive Emergency Contacts Fire Alarm Hazards First Aiders Keeping Corridors Clear RISKS DSE (Display Screen Equipment) Test Smoke Alarms Monthly Lone Working Procedures PAT Testing Slip hazard Keeping Fire Doors Closed Hand sanitisers Safety Culture Ergonomics Workstation setup Fire Extinguisher DSE (Display Screen Equipment) Assessment Spill cleanup Good Housekeeping Practices Occupational Health and Safety Act Emergency Exit Workplace injury Spill Control First Aid Evacuation plan Datix Ventilation Risk assessment Line Managers Responsibilities Telephone Harassment PPE (Personal Protective Equipment) Incident reporting Stress Management Health and Safety Policy Fire Warden 20-20- 20 Rule Navigating Winter Roads Assembly Point Health and Safety Site Assessment Fire Risk Assessment RIDDOR Fully charged Phone Fire drill Emergency exit Electrical safety Enhanced Emergency Evacuation Slips, trips and falls Near Miss High- Visibility Vest Safe lifting Compliance First aid kit Survive and Thrive Emergency Contacts Fire Alarm Hazards First Aiders Keeping Corridors Clear RISKS DSE (Display Screen Equipment) Test Smoke Alarms Monthly Lone Working Procedures PAT Testing Slip hazard Keeping Fire Doors Closed Hand sanitisers Safety Culture Ergonomics Workstation setup
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Fire Extinguisher
DSE (Display Screen Equipment) Assessment
Spill cleanup
Good Housekeeping Practices
Occupational Health and Safety Act
Emergency Exit
Workplace injury
Spill Control
First Aid
Evacuation plan
Datix
Ventilation
Risk assessment
Line Managers Responsibilities
Telephone Harassment
PPE (Personal Protective Equipment)
Incident reporting
Stress Management
Health and Safety Policy
Fire Warden
20-20-20 Rule
Navigating Winter Roads
Assembly Point
Health and Safety Site Assessment
Fire Risk Assessment
RIDDOR
Fully charged Phone
Fire drill
Emergency exit
Electrical safety
Enhanced Emergency Evacuation
Slips, trips and falls
Near Miss
High-Visibility Vest
Safe lifting
Compliance
First aid kit
Survive and Thrive
Emergency Contacts
Fire Alarm
Hazards
First Aiders
Keeping Corridors Clear
RISKS
DSE (Display Screen Equipment)
Test Smoke Alarms Monthly
Lone Working Procedures
PAT Testing
Slip hazard
Keeping Fire Doors Closed
Hand sanitisers
Safety Culture
Ergonomics
Workstation setup