Compliance Safety Culture PPE (Personal Protective Equipment) DSE (Display Screen Equipment) Assessment Datix Fire Alarm DSE (Display Screen Equipment) RIDDOR Line Managers Responsibilities Evacuation plan Fire Extinguisher Health and Safety Policy PAT Testing Emergency Exit Enhanced Emergency Evacuation Ergonomics Telephone Harassment Keeping Corridors Clear First Aid Slips, trips and falls Navigating Winter Roads Emergency Contacts Incident reporting Lone Working Procedures Spill cleanup First Aiders Health and Safety Site Assessment Risk assessment Fully charged Phone Electrical safety Test Smoke Alarms Monthly Survive and Thrive Slip hazard Workstation setup Fire Warden 20-20- 20 Rule Stress Management First aid kit Occupational Health and Safety Act Hazards Spill Control Workplace injury RISKS Good Housekeeping Practices Ventilation Fire Risk Assessment High- Visibility Vest Safe lifting Near Miss Hand sanitisers Fire drill Emergency exit Keeping Fire Doors Closed Assembly Point Compliance Safety Culture PPE (Personal Protective Equipment) DSE (Display Screen Equipment) Assessment Datix Fire Alarm DSE (Display Screen Equipment) RIDDOR Line Managers Responsibilities Evacuation plan Fire Extinguisher Health and Safety Policy PAT Testing Emergency Exit Enhanced Emergency Evacuation Ergonomics Telephone Harassment Keeping Corridors Clear First Aid Slips, trips and falls Navigating Winter Roads Emergency Contacts Incident reporting Lone Working Procedures Spill cleanup First Aiders Health and Safety Site Assessment Risk assessment Fully charged Phone Electrical safety Test Smoke Alarms Monthly Survive and Thrive Slip hazard Workstation setup Fire Warden 20-20- 20 Rule Stress Management First aid kit Occupational Health and Safety Act Hazards Spill Control Workplace injury RISKS Good Housekeeping Practices Ventilation Fire Risk Assessment High- Visibility Vest Safe lifting Near Miss Hand sanitisers Fire drill Emergency exit Keeping Fire Doors Closed Assembly Point
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Compliance
Safety Culture
PPE (Personal Protective Equipment)
DSE (Display Screen Equipment) Assessment
Datix
Fire Alarm
DSE (Display Screen Equipment)
RIDDOR
Line Managers Responsibilities
Evacuation plan
Fire Extinguisher
Health and Safety Policy
PAT Testing
Emergency Exit
Enhanced Emergency Evacuation
Ergonomics
Telephone Harassment
Keeping Corridors Clear
First Aid
Slips, trips and falls
Navigating Winter Roads
Emergency Contacts
Incident reporting
Lone Working Procedures
Spill cleanup
First Aiders
Health and Safety Site Assessment
Risk assessment
Fully charged Phone
Electrical safety
Test Smoke Alarms Monthly
Survive and Thrive
Slip hazard
Workstation setup
Fire Warden
20-20-20 Rule
Stress Management
First aid kit
Occupational Health and Safety Act
Hazards
Spill Control
Workplace injury
RISKS
Good Housekeeping Practices
Ventilation
Fire Risk Assessment
High-Visibility Vest
Safe lifting
Near Miss
Hand sanitisers
Fire drill
Emergency exit
Keeping Fire Doors Closed
Assembly Point