1st PTis aBrainProblemdelay:ElectricalOperationalNov '24StatMRI callin techWronglightbulbsWindownottintedBrickdoesn'tmatchOperationalDec '24Alarmsgoing off,no reasonMachinewon't fitthroughwindow1st Pt isthruER/FLoorConstructionworkerinjuryProjectileby nonRad TechMRI cartdelayeddeliveryOutsidestructuredoneSept.Problemdelay:PlumbingCollinwill needPaulCeilingLeakForgot toschedulea craneProjectilebeforeopeningdayRadio nothookedupNoPhonehook upMRIdeliverydelayedOutsidestructuredone Oct1st PTis aBrainProblemdelay:ElectricalOperationalNov '24StatMRI callin techWronglightbulbsWindownottintedBrickdoesn'tmatchOperationalDec '24Alarmsgoing off,no reasonMachinewon't fitthroughwindow1st Pt isthruER/FLoorConstructionworkerinjuryProjectileby nonRad TechMRI cartdelayeddeliveryOutsidestructuredoneSept.Problemdelay:PlumbingCollinwill needPaulCeilingLeakForgot toschedulea craneProjectilebeforeopeningdayRadio nothookedupNoPhonehook upMRIdeliverydelayedOutsidestructuredone Oct

MRI - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  1. 1st PT is a Brain
  2. Problem delay: Electrical
  3. Operational Nov '24
  4. Stat MRI call in tech
  5. Wrong light bulbs
  6. Window not tinted
  7. Brick doesn't match
  8. Operational Dec '24
  9. Alarms going off, no reason
  10. Machine won't fit through window
  11. 1st Pt is thru ER/FLoor
  12. Construction worker injury
  13. Projectile by non Rad Tech
  14. MRI cart delayed delivery
  15. Outside structure done Sept.
  16. Problem delay: Plumbing
  17. Collin will need Paul
  18. Ceiling Leak
  19. Forgot to schedule a crane
  20. Projectile before opening day
  21. Radio not hooked up
  22. No Phone hook up
  23. MRI delivery delayed
  24. Outside structure done Oct