Water Reuse Why MEP Engineering? Energy Efficiency Resilient Design Energy Storage System Stage 1 – BD Positioning Stage 2 – Proposals Stage 4 – Construction Embodied Carbon Natural Refrigerants Wellness Integrated Project Delivery (IPD) Progressive Design Build (PDB) Microgrid Energy Use Intensity (EUI) Net-zero Energy Building Stage 3 – Design Water Conservation Decarbonization Hydronic System Marketing Sustainability Water Reuse Why MEP Engineering? Energy Efficiency Resilient Design Energy Storage System Stage 1 – BD Positioning Stage 2 – Proposals Stage 4 – Construction Embodied Carbon Natural Refrigerants Wellness Integrated Project Delivery (IPD) Progressive Design Build (PDB) Microgrid Energy Use Intensity (EUI) Net-zero Energy Building Stage 3 – Design Water Conservation Decarbonization Hydronic System Marketing Sustainability
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Water Reuse
Why MEP Engineering?
Energy Efficiency
Resilient Design
Energy Storage System
Stage 1 – BD Positioning
Stage 2 – Proposals
Stage 4 – Construction
Embodied Carbon
Natural Refrigerants
Wellness
Integrated Project Delivery (IPD)
Progressive Design Build (PDB)
Microgrid
Energy Use Intensity (EUI)
Net-zero Energy Building
Stage 3 – Design
Water Conservation
Decarbonization
Hydronic System
Marketing
Sustainability