Stage 2 –ProposalsMarketingNet-zeroEnergyBuildingNaturalRefrigerantsEnergyEfficiencyEnergyStorageSystemSustainabilityHydronicSystemStage3 –DesignStage 1 –BDPositioningStage 4 –ConstructionIntegratedProjectDelivery(IPD)MicrogridResilientDesignDecarbonizationWellnessEmbodiedCarbonWhy MEPEngineering?WaterConservationWaterReuseProgressiveDesignBuild (PDB)EnergyUseIntensity(EUI)Stage 2 –ProposalsMarketingNet-zeroEnergyBuildingNaturalRefrigerantsEnergyEfficiencyEnergyStorageSystemSustainabilityHydronicSystemStage3 –DesignStage 1 –BDPositioningStage 4 –ConstructionIntegratedProjectDelivery(IPD)MicrogridResilientDesignDecarbonizationWellnessEmbodiedCarbonWhy MEPEngineering?WaterConservationWaterReuseProgressiveDesignBuild (PDB)EnergyUseIntensity(EUI)

iEngineer & Glumac - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
  1. Stage 2 – Proposals
  2. Marketing
  3. Net-zero Energy Building
  4. Natural Refrigerants
  5. Energy Efficiency
  6. Energy Storage System
  7. Sustainability
  8. Hydronic System
  9. Stage 3 – Design
  10. Stage 1 – BD Positioning
  11. Stage 4 – Construction
  12. Integrated Project Delivery (IPD)
  13. Microgrid
  14. Resilient Design
  15. Decarbonization
  16. Wellness
  17. Embodied Carbon
  18. Why MEP Engineering?
  19. Water Conservation
  20. Water Reuse
  21. Progressive Design Build (PDB)
  22. Energy Use Intensity (EUI)