Why MEP Engineering? Microgrid Embodied Carbon Water Reuse Energy Storage System Energy Efficiency Energy Use Intensity (EUI) Decarbonization Integrated Project Delivery (IPD) Wellness Net-zero Energy Building Sustainability Stage 3 – Design Resilient Design Hydronic System Water Conservation Progressive Design Build (PDB) Stage 4 – Construction Natural Refrigerants Stage 1 – BD Positioning Stage 2 – Proposals Marketing Why MEP Engineering? Microgrid Embodied Carbon Water Reuse Energy Storage System Energy Efficiency Energy Use Intensity (EUI) Decarbonization Integrated Project Delivery (IPD) Wellness Net-zero Energy Building Sustainability Stage 3 – Design Resilient Design Hydronic System Water Conservation Progressive Design Build (PDB) Stage 4 – Construction Natural Refrigerants Stage 1 – BD Positioning Stage 2 – Proposals Marketing
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Why MEP Engineering?
Microgrid
Embodied Carbon
Water Reuse
Energy Storage System
Energy Efficiency
Energy Use Intensity (EUI)
Decarbonization
Integrated Project Delivery (IPD)
Wellness
Net-zero Energy Building
Sustainability
Stage 3 – Design
Resilient Design
Hydronic System
Water Conservation
Progressive Design Build (PDB)
Stage 4 – Construction
Natural Refrigerants
Stage 1 – BD Positioning
Stage 2 – Proposals
Marketing