Microgrid Decarbonization Integrated Project Delivery (IPD) Water Conservation Why MEP Engineering? Net-zero Energy Building Wellness Water Reuse Embodied Carbon Progressive Design Build (PDB) Energy Use Intensity (EUI) Energy Efficiency Stage 2 – Proposals Stage 3 – Design Stage 4 – Construction Marketing Hydronic System Sustainability Energy Storage System Stage 1 – BD Positioning Resilient Design Natural Refrigerants Microgrid Decarbonization Integrated Project Delivery (IPD) Water Conservation Why MEP Engineering? Net-zero Energy Building Wellness Water Reuse Embodied Carbon Progressive Design Build (PDB) Energy Use Intensity (EUI) Energy Efficiency Stage 2 – Proposals Stage 3 – Design Stage 4 – Construction Marketing Hydronic System Sustainability Energy Storage System Stage 1 – BD Positioning Resilient Design Natural Refrigerants
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Microgrid
Decarbonization
Integrated Project Delivery (IPD)
Water Conservation
Why MEP Engineering?
Net-zero Energy Building
Wellness
Water Reuse
Embodied Carbon
Progressive Design Build (PDB)
Energy Use Intensity (EUI)
Energy Efficiency
Stage 2 – Proposals
Stage 3 – Design
Stage 4 – Construction
Marketing
Hydronic System
Sustainability
Energy Storage System
Stage 1 – BD Positioning
Resilient Design
Natural Refrigerants