Water Conservation Integrated Project Delivery (IPD) Water Reuse Stage 3 – Design Decarbonization Energy Use Intensity (EUI) Why MEP Engineering? Energy Storage System Stage 1 – BD Positioning Energy Efficiency Resilient Design Stage 4 – Construction Hydronic System Marketing Sustainability Progressive Design Build (PDB) Stage 2 – Proposals Net-zero Energy Building Embodied Carbon Microgrid Wellness Natural Refrigerants Water Conservation Integrated Project Delivery (IPD) Water Reuse Stage 3 – Design Decarbonization Energy Use Intensity (EUI) Why MEP Engineering? Energy Storage System Stage 1 – BD Positioning Energy Efficiency Resilient Design Stage 4 – Construction Hydronic System Marketing Sustainability Progressive Design Build (PDB) Stage 2 – Proposals Net-zero Energy Building Embodied Carbon Microgrid Wellness Natural Refrigerants
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Water Conservation
Integrated Project Delivery (IPD)
Water Reuse
Stage 3 – Design
Decarbonization
Energy Use Intensity (EUI)
Why MEP Engineering?
Energy Storage System
Stage 1 – BD Positioning
Energy Efficiency
Resilient Design
Stage 4 – Construction
Hydronic System
Marketing
Sustainability
Progressive Design Build (PDB)
Stage 2 – Proposals
Net-zero Energy Building
Embodied Carbon
Microgrid
Wellness
Natural Refrigerants