Stage 3 – Design Why MEP Engineering? Progressive Design Build (PDB) Integrated Project Delivery (IPD) Water Reuse Natural Refrigerants Energy Storage System Decarbonization Net-zero Energy Building Sustainability Water Conservation Resilient Design Energy Efficiency Energy Use Intensity (EUI) Hydronic System Embodied Carbon Wellness Marketing Stage 4 – Construction Stage 2 – Proposals Stage 1 – BD Positioning Microgrid Stage 3 – Design Why MEP Engineering? Progressive Design Build (PDB) Integrated Project Delivery (IPD) Water Reuse Natural Refrigerants Energy Storage System Decarbonization Net-zero Energy Building Sustainability Water Conservation Resilient Design Energy Efficiency Energy Use Intensity (EUI) Hydronic System Embodied Carbon Wellness Marketing Stage 4 – Construction Stage 2 – Proposals Stage 1 – BD Positioning Microgrid
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Stage 3 – Design
Why MEP Engineering?
Progressive Design Build (PDB)
Integrated Project Delivery (IPD)
Water Reuse
Natural Refrigerants
Energy Storage System
Decarbonization
Net-zero Energy Building
Sustainability
Water Conservation
Resilient Design
Energy Efficiency
Energy Use Intensity (EUI)
Hydronic System
Embodied Carbon
Wellness
Marketing
Stage 4 – Construction
Stage 2 – Proposals
Stage 1 – BD Positioning
Microgrid