Net-zeroEnergyBuildingIntegratedProjectDelivery(IPD)EmbodiedCarbonWhy MEPEngineering?EnergyUseIntensity(EUI)HydronicSystemResilientDesignDecarbonizationWaterReuseProgressiveDesignBuild (PDB)NaturalRefrigerantsStage 2 –ProposalsWellnessStage3 –DesignStage 1 –BDPositioningMicrogridMarketingEnergyStorageSystemEnergyEfficiencyStage 4 –ConstructionSustainabilityWaterConservationNet-zeroEnergyBuildingIntegratedProjectDelivery(IPD)EmbodiedCarbonWhy MEPEngineering?EnergyUseIntensity(EUI)HydronicSystemResilientDesignDecarbonizationWaterReuseProgressiveDesignBuild (PDB)NaturalRefrigerantsStage 2 –ProposalsWellnessStage3 –DesignStage 1 –BDPositioningMicrogridMarketingEnergyStorageSystemEnergyEfficiencyStage 4 –ConstructionSustainabilityWaterConservation

iEngineer & Glumac - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
  1. Net-zero Energy Building
  2. Integrated Project Delivery (IPD)
  3. Embodied Carbon
  4. Why MEP Engineering?
  5. Energy Use Intensity (EUI)
  6. Hydronic System
  7. Resilient Design
  8. Decarbonization
  9. Water Reuse
  10. Progressive Design Build (PDB)
  11. Natural Refrigerants
  12. Stage 2 – Proposals
  13. Wellness
  14. Stage 3 – Design
  15. Stage 1 – BD Positioning
  16. Microgrid
  17. Marketing
  18. Energy Storage System
  19. Energy Efficiency
  20. Stage 4 – Construction
  21. Sustainability
  22. Water Conservation