HydronicSystemWhy MEPEngineering?MicrogridEnergyUseIntensity(EUI)ProgressiveDesignBuild (PDB)Stage 2 –ProposalsMarketingEnergyEfficiencyStage 4 –ConstructionDecarbonizationSustainabilityWaterReuseEmbodiedCarbonStage3 –DesignEnergyStorageSystemNet-zeroEnergyBuildingNaturalRefrigerantsStage 1 –BDPositioningIntegratedProjectDelivery(IPD)WellnessWaterConservationResilientDesignHydronicSystemWhy MEPEngineering?MicrogridEnergyUseIntensity(EUI)ProgressiveDesignBuild (PDB)Stage 2 –ProposalsMarketingEnergyEfficiencyStage 4 –ConstructionDecarbonizationSustainabilityWaterReuseEmbodiedCarbonStage3 –DesignEnergyStorageSystemNet-zeroEnergyBuildingNaturalRefrigerantsStage 1 –BDPositioningIntegratedProjectDelivery(IPD)WellnessWaterConservationResilientDesign

iEngineer & Glumac - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
  1. Hydronic System
  2. Why MEP Engineering?
  3. Microgrid
  4. Energy Use Intensity (EUI)
  5. Progressive Design Build (PDB)
  6. Stage 2 – Proposals
  7. Marketing
  8. Energy Efficiency
  9. Stage 4 – Construction
  10. Decarbonization
  11. Sustainability
  12. Water Reuse
  13. Embodied Carbon
  14. Stage 3 – Design
  15. Energy Storage System
  16. Net-zero Energy Building
  17. Natural Refrigerants
  18. Stage 1 – BD Positioning
  19. Integrated Project Delivery (IPD)
  20. Wellness
  21. Water Conservation
  22. Resilient Design