Hydronic System Why MEP Engineering? Microgrid Energy Use Intensity (EUI) Progressive Design Build (PDB) Stage 2 – Proposals Marketing Energy Efficiency Stage 4 – Construction Decarbonization Sustainability Water Reuse Embodied Carbon Stage 3 – Design Energy Storage System Net-zero Energy Building Natural Refrigerants Stage 1 – BD Positioning Integrated Project Delivery (IPD) Wellness Water Conservation Resilient Design Hydronic System Why MEP Engineering? Microgrid Energy Use Intensity (EUI) Progressive Design Build (PDB) Stage 2 – Proposals Marketing Energy Efficiency Stage 4 – Construction Decarbonization Sustainability Water Reuse Embodied Carbon Stage 3 – Design Energy Storage System Net-zero Energy Building Natural Refrigerants Stage 1 – BD Positioning Integrated Project Delivery (IPD) Wellness Water Conservation Resilient Design
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Hydronic System
Why MEP Engineering?
Microgrid
Energy Use Intensity (EUI)
Progressive Design Build (PDB)
Stage 2 – Proposals
Marketing
Energy Efficiency
Stage 4 – Construction
Decarbonization
Sustainability
Water Reuse
Embodied Carbon
Stage 3 – Design
Energy Storage System
Net-zero Energy Building
Natural Refrigerants
Stage 1 – BD Positioning
Integrated Project Delivery (IPD)
Wellness
Water Conservation
Resilient Design