Stage 3 – Design Water Reuse Water Conservation Sustainability Net-zero Energy Building Integrated Project Delivery (IPD) Stage 1 – BD Positioning Microgrid Hydronic System Stage 2 – Proposals Stage 4 – Construction Energy Storage System Energy Use Intensity (EUI) Embodied Carbon Resilient Design Decarbonization Progressive Design Build (PDB) Why MEP Engineering? Natural Refrigerants Wellness Marketing Energy Efficiency Stage 3 – Design Water Reuse Water Conservation Sustainability Net-zero Energy Building Integrated Project Delivery (IPD) Stage 1 – BD Positioning Microgrid Hydronic System Stage 2 – Proposals Stage 4 – Construction Energy Storage System Energy Use Intensity (EUI) Embodied Carbon Resilient Design Decarbonization Progressive Design Build (PDB) Why MEP Engineering? Natural Refrigerants Wellness Marketing Energy Efficiency
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Stage 3 – Design
Water Reuse
Water Conservation
Sustainability
Net-zero Energy Building
Integrated Project Delivery (IPD)
Stage 1 – BD Positioning
Microgrid
Hydronic System
Stage 2 – Proposals
Stage 4 – Construction
Energy Storage System
Energy Use Intensity (EUI)
Embodied Carbon
Resilient Design
Decarbonization
Progressive Design Build (PDB)
Why MEP Engineering?
Natural Refrigerants
Wellness
Marketing
Energy Efficiency