Strength Intermediate Beam Manpower Pile Cost Control Trial Mix BIM Physics Autocad Kahoy Shoring Culvert Progress Report Bearing capacity Masilya Aggregates Columns Tower Crane Scaffolding Road Solid Blocks Revit Hollow blocks Rebar Beams Steel Beam Plastering Hydraulics Footing PICE- UAE Concrete Oil and Gas Soil Spacer Timber Batching plant Tie Wire Tunnel Water Table Phenolic Board Cement Rock Primavera Facility QA/QC Infrastructure Tansi Fly Ash Tiebeam ETABS Backhoe Metal decking Ductility Water Foundation Eccentricity Harness Sand Quantity Surveying Labor STAAD Sustainability Dam Strength Intermediate Beam Manpower Pile Cost Control Trial Mix BIM Physics Autocad Kahoy Shoring Culvert Progress Report Bearing capacity Masilya Aggregates Columns Tower Crane Scaffolding Road Solid Blocks Revit Hollow blocks Rebar Beams Steel Beam Plastering Hydraulics Footing PICE- UAE Concrete Oil and Gas Soil Spacer Timber Batching plant Tie Wire Tunnel Water Table Phenolic Board Cement Rock Primavera Facility QA/QC Infrastructure Tansi Fly Ash Tiebeam ETABS Backhoe Metal decking Ductility Water Foundation Eccentricity Harness Sand Quantity Surveying Labor STAAD Sustainability Dam
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Strength
Intermediate Beam
Manpower
Pile
Cost Control
Trial Mix
BIM
Physics
Autocad
Kahoy
Shoring
Culvert
Progress Report
Bearing capacity
Masilya
Aggregates
Columns
Tower Crane
Scaffolding
Road
Solid Blocks
Revit
Hollow blocks
Rebar
Beams
Steel Beam
Plastering
Hydraulics
Footing
PICE-UAE
Concrete
Oil and Gas
Soil
Spacer
Timber
Batching plant
Tie Wire
Tunnel
Water Table
Phenolic Board
Cement
Rock
Primavera
Facility
QA/QC
Infrastructure
Tansi
Fly Ash
Tiebeam
ETABS
Backhoe
Metal decking
Ductility
Water
Foundation
Eccentricity
Harness
Sand
Quantity Surveying
Labor
STAAD
Sustainability
Dam