Total Quality Management Global sourcing Quality assurance Quality One piece flow Computer- aided design (CAD) Automated production line Global outsourcing Computer- aided manufacturing (CAM) Pull Takt Transformation process Lean management Tangible Materials management Quality control Outputs Waste minimisation Intangible Just in Time Materials requirement planning Inputs Production plan Zero Defects Operations management Overseas manufacture Inventory control Robotics Inventory Forecasting Master production schedule Total Quality Management Global sourcing Quality assurance Quality One piece flow Computer- aided design (CAD) Automated production line Global outsourcing Computer- aided manufacturing (CAM) Pull Takt Transformation process Lean management Tangible Materials management Quality control Outputs Waste minimisation Intangible Just in Time Materials requirement planning Inputs Production plan Zero Defects Operations management Overseas manufacture Inventory control Robotics Inventory Forecasting Master production schedule
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Total Quality Management
Global sourcing
Quality assurance
Quality
One piece flow
Computer-aided design (CAD)
Automated production line
Global outsourcing
Computer-aided manufacturing (CAM)
Pull
Takt
Transformation process
Lean management
Tangible
Materials management
Quality control
Outputs
Waste minimisation
Intangible
Just in Time
Materials requirement planning
Inputs
Production plan
Zero Defects
Operations management
Overseas manufacture
Inventory control
Robotics
Inventory
Forecasting
Master production schedule