Lean management One piece flow Computer- aided manufacturing (CAM) Overseas manufacture Robotics Takt Just in Time Transformation process Inventory control Computer- aided design (CAD) Global outsourcing Materials requirement planning Zero Defects Quality assurance Outputs Quality control Pull Inventory Production plan Intangible Total Quality Management Forecasting Operations management Master production schedule Global sourcing Inputs Waste minimisation Quality Tangible Materials management Automated production line Lean management One piece flow Computer- aided manufacturing (CAM) Overseas manufacture Robotics Takt Just in Time Transformation process Inventory control Computer- aided design (CAD) Global outsourcing Materials requirement planning Zero Defects Quality assurance Outputs Quality control Pull Inventory Production plan Intangible Total Quality Management Forecasting Operations management Master production schedule Global sourcing Inputs Waste minimisation Quality Tangible Materials management Automated production line
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Lean management
One piece flow
Computer-aided manufacturing (CAM)
Overseas manufacture
Robotics
Takt
Just in Time
Transformation process
Inventory control
Computer-aided design (CAD)
Global outsourcing
Materials requirement planning
Zero Defects
Quality assurance
Outputs
Quality control
Pull
Inventory
Production plan
Intangible
Total Quality Management
Forecasting
Operations management
Master production schedule
Global sourcing
Inputs
Waste minimisation
Quality
Tangible
Materials management
Automated production line