YawAerodynamicsPitchWarrentedPowerCurveCut-inSpeedInterconnectionCMIIFloatingPermitEnerconCut-outSpeedSiemensGearboxOEMBankabilityCapacityFactorRepoweringBOPNordexNacelleFirmOrderGridIntegrationFoundationsDesignLifeTimeOffshoreAnemometerPPAsLoadFactorSuzlonVestasRenewableEnergyCertificates(RECs)SubstationTurbulenceIntensityOnshoreHubDirectDriveWindVaneLandLeaseTurbineBladeOperatorWindShearWindResourceAssessmentRotorAvailabilityContractIcingWakeeffectCapacityAuctionScadaPowerCurveYawAerodynamicsPitchWarrentedPowerCurveCut-inSpeedInterconnectionCMIIFloatingPermitEnerconCut-outSpeedSiemensGearboxOEMBankabilityCapacityFactorRepoweringBOPNordexNacelleFirmOrderGridIntegrationFoundationsDesignLifeTimeOffshoreAnemometerPPAsLoadFactorSuzlonVestasRenewableEnergyCertificates(RECs)SubstationTurbulenceIntensityOnshoreHubDirectDriveWindVaneLandLeaseTurbineBladeOperatorWindShearWindResourceAssessmentRotorAvailabilityContractIcingWakeeffectCapacityAuctionScadaPowerCurve

Wind Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
  1. Yaw
  2. Aerodynamics
  3. Pitch
  4. Warrented Power Curve
  5. Cut-in Speed
  6. Interconnection
  7. CMII
  8. Floating
  9. Permit
  10. Enercon
  11. Cut-out Speed
  12. Siemens
  13. Gearbox
  14. OEM
  15. Bankability
  16. Capacity Factor
  17. Repowering
  18. BOP
  19. Nordex
  20. Nacelle
  21. Firm Order
  22. Grid Integration
  23. Foundations
  24. Design Life Time
  25. Offshore
  26. Anemometer
  27. PPAs
  28. Load Factor
  29. Suzlon
  30. Vestas
  31. Renewable Energy Certificates (RECs)
  32. Substation
  33. Turbulence Intensity
  34. Onshore
  35. Hub
  36. Direct Drive
  37. Wind Vane
  38. Land Lease
  39. Turbine Blade
  40. Operator
  41. Wind Shear
  42. Wind Resource Assessment
  43. Rotor
  44. Availability Contract
  45. Icing
  46. Wake effect
  47. Capacity Auction
  48. Scada
  49. Power Curve