WarrentedPowerCurveWakeeffectTurbulenceIntensityDirectDriveFoundationsAnemometerTurbineBladePowerCurveVestasLandLeaseWindVaneNacelleEnerconCut-inSpeedRepoweringCapacityFactorAvailabilityContractSiemensRotorWindResourceAssessmentCapacityAuctionOnshorePitchInterconnectionPermitPPAsScadaOffshoreSuzlonOperatorWindShearYawCMIISubstationBOPOEMFloatingFirmOrderIcingHubBankabilityLoadFactorRenewableEnergyCertificates(RECs)DesignLifeTimeCut-outSpeedNordexAerodynamicsGridIntegrationGearboxWarrentedPowerCurveWakeeffectTurbulenceIntensityDirectDriveFoundationsAnemometerTurbineBladePowerCurveVestasLandLeaseWindVaneNacelleEnerconCut-inSpeedRepoweringCapacityFactorAvailabilityContractSiemensRotorWindResourceAssessmentCapacityAuctionOnshorePitchInterconnectionPermitPPAsScadaOffshoreSuzlonOperatorWindShearYawCMIISubstationBOPOEMFloatingFirmOrderIcingHubBankabilityLoadFactorRenewableEnergyCertificates(RECs)DesignLifeTimeCut-outSpeedNordexAerodynamicsGridIntegrationGearbox

Wind Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
  1. Warrented Power Curve
  2. Wake effect
  3. Turbulence Intensity
  4. Direct Drive
  5. Foundations
  6. Anemometer
  7. Turbine Blade
  8. Power Curve
  9. Vestas
  10. Land Lease
  11. Wind Vane
  12. Nacelle
  13. Enercon
  14. Cut-in Speed
  15. Repowering
  16. Capacity Factor
  17. Availability Contract
  18. Siemens
  19. Rotor
  20. Wind Resource Assessment
  21. Capacity Auction
  22. Onshore
  23. Pitch
  24. Interconnection
  25. Permit
  26. PPAs
  27. Scada
  28. Offshore
  29. Suzlon
  30. Operator
  31. Wind Shear
  32. Yaw
  33. CMII
  34. Substation
  35. BOP
  36. OEM
  37. Floating
  38. Firm Order
  39. Icing
  40. Hub
  41. Bankability
  42. Load Factor
  43. Renewable Energy Certificates (RECs)
  44. Design Life Time
  45. Cut-out Speed
  46. Nordex
  47. Aerodynamics
  48. Grid Integration
  49. Gearbox