120 VA ANSI Z-89.1 Standard Calculation Excess of 12 KW Outside Dimensions ANSI Z-89.2 Optional Calculation Non- Coincident Loads Absorbtion 18 Inches Single Receptacle 10 Feet Class One Installation Criteria Threaded RMC Service Calculations Multiple Receptacle Neutral Load Electrical Service Conductors Demand Factor ANSI Z41.1 Inhalation 3 VA/SF 5/8 Inch 5000 VA 120 VA ANSI Z-89.1 Standard Calculation Excess of 12 KW Outside Dimensions ANSI Z-89.2 Optional Calculation Non- Coincident Loads Absorbtion 18 Inches Single Receptacle 10 Feet Class One Installation Criteria Threaded RMC Service Calculations Multiple Receptacle Neutral Load Electrical Service Conductors Demand Factor ANSI Z41.1 Inhalation 3 VA/SF 5/8 Inch 5000 VA
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
120 VA
ANSI Z-89.1
Standard Calculation
Excess
of
12 KW
Outside Dimensions
ANSI Z-89.2
Optional Calculation
Non-
Coincident
Loads
Absorbtion
18 Inches
Single Receptacle
10 Feet
Class One Installation Criteria
Threaded
RMC
Service Calculations
Multiple Receptacle
Neutral Load
Electrical Service Conductors
Demand
Factor
ANSI Z41.1
Inhalation
3 VA/SF
5/8 Inch
5000 VA