ExcavationSafetySpillsLineof FireOperateoverride andbypass ofsafeguards onlywithauthorizationPPEEmissionsinto theAtmosphereStay withinSafeOperatingLimitsPermittoWorkWasteStorageAreasDrivingSafetyWorkingatHeightEnvironmentalAspects ofHousekeepingVerifyprocess line-up conditionbefore startupStopWorkAuthorityFireSafetyProcessSafetyConfinedSpaceWaterResourcesandDischargesLiftingSafetyToxicGasesManagementof ChangeEmpty & de-energizeprocessequipmentbefore openingEnergizedSystemsRationalUse ofEnergySourcesExcavationSafetySpillsLineof FireOperateoverride andbypass ofsafeguards onlywithauthorizationPPEEmissionsinto theAtmosphereStay withinSafeOperatingLimitsPermittoWorkWasteStorageAreasDrivingSafetyWorkingatHeightEnvironmentalAspects ofHousekeepingVerifyprocess line-up conditionbefore startupStopWorkAuthorityFireSafetyProcessSafetyConfinedSpaceWaterResourcesandDischargesLiftingSafetyToxicGasesManagementof ChangeEmpty & de-energizeprocessequipmentbefore openingEnergizedSystemsRationalUse ofEnergySources

Scavenger Hunt - Call List

(Print) Use this randomly generated list as your call list when playing the game. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
B
2
B
3
I
4
I
5
B
6
G
7
O
8
O
9
G
10
N
11
B
12
I
13
G
14
N
15
O
16
I
17
O
18
B
19
G
20
O
21
G
22
N
23
I
24
N
  1. B-Excavation Safety
  2. B-Spills
  3. I-Line of Fire
  4. I-Operate override and bypass of safeguards only with authorization
  5. B-PPE
  6. G-Emissions into the Atmosphere
  7. O-Stay within Safe Operating Limits
  8. O-Permit to Work
  9. G-Waste Storage Areas
  10. N-Driving Safety
  11. B-Working at Height
  12. I-Environmental Aspects of Housekeeping
  13. G-Verify process line-up condition before start up
  14. N-Stop Work Authority
  15. O-Fire Safety
  16. I-Process Safety
  17. O-Confined Space
  18. B-Water Resources and Discharges
  19. G-Lifting Safety
  20. O-Toxic Gases
  21. G-Management of Change
  22. N-Empty & de-energize process equipment before opening
  23. I-Energized Systems
  24. N-Rational Use of Energy Sources