(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
techs can only do one job at a time once tech login on to job, they will receive their next job
If work is not out of the pools at the specified times, please inform an FTC supervisor immediately.
Once tech log in to first job the remaining of 8-10's will assign to tech
8:00-10 (all jobs should be out of the 7552/0000 and assigned to a technician by 8:30am)
Job+1
Techs should be logging in to first job by 8am -8:15
7:30-7:45 Ensure all techs are enroute to first job 8-9's
AD
Enroute Productive
1:00-3 (all jobs should be out of the 7552/0000 and assigned to a technician by 1:30pm)
Break Non-Productive
3:00-5 (all jobs should be out of the 7552/0000 and assigned to a technician by 3:30pm)
5:00-7 (all jobs should be out of the 7552/0000 and assigned to a technician by 4:30)
7:00 -7:30 Process calls offs make sure all 8-9's are covered out the pool and rerouted based off call offs
EOD Non-Productive
OTA
LOFF Non-Productive
8:30 please manually assign the remaining 8-10's that AD did not assign based off distance /blue flags/ etc.
BP Partners should be following this same process and should not receive their full routes at one time
If a tech happens to go to zero you will need to give tech their next job to kick start AD to route tech!
Top Golf outing July 18th deadline to sign up
Tech first job should be assigned no later than 7:30
10:00-12 (all jobs should be out of the 7552/0000 and assigned to a technician by 10:30am)