(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
techs can only do one job at a time once tech login on to job, they will receive their next job
Job+1
7:00 -7:30 Process calls offs make sure all 8-9's are covered out the pool and rerouted based off call offs
7:30-7:45 Ensure all techs are enroute to first job 8-9's
City
Avail Non-Productive
8:30 please manually assign the remaining 8-10's that AD did not assign based off distance /blue flags/ etc.
OTA
LOFF Non-Productive
Enroute Productive
Top Golf outing July 18th deadline to sign up
10:00-12 (all jobs should be out of the 7552/0000 and assigned to a technician by 10:30am)
5:00-7 (all jobs should be out of the 7552/0000 and assigned to a technician by 4:30)
If work is not out of the pools at the specified times, please inform an FTC supervisor immediately.
1:00-3 (all jobs should be out of the 7552/0000 and assigned to a technician by 1:30pm)
BP Partners should be following this same process and should not receive their full routes at one time
EOD Non-Productive
Break Non-Productive
3:00-5 (all jobs should be out of the 7552/0000 and assigned to a technician by 3:30pm)
Tech first job should be assigned no later than 7:30
AD
North CIL
South
8:00-10 (all jobs should be out of the 7552/0000 and assigned to a technician by 8:30am)
If a tech happens to go to zero you will need to give tech their next job to kick start AD to route tech!
Techs should be logging in to first job by 8am -8:15
Once tech log in to first job the remaining of 8-10's will assign to tech