BP Partnersshould befollowing thissame process andshould not receivetheir full routes atone timeCity1:00-3 (all jobsshould be out ofthe 7552/0000and assigned toa technician by1:30pm)NorthCentral3:00-5 (all jobsshould be out ofthe 7552/0000and assigned toa technician by3:30pm)7:00 -7:30 Processcalls offs makesure all 8-9's arecovered out thepool and reroutedbased off call offsJob+110:00-12 (all jobsshould be out ofthe 7552/0000and assigned to atechnician by10:30am)LOFFNon-ProductiveSouthIf work is not out ofthe pools at thespecified times,please inform anFTC supervisorimmediately.EOD Non-Productive5:00-7 (all jobsshould be out ofthe 7552/0000and assigned toa technician by4:30)BreakNon-Productivetechs can onlydo one job at atime once techlogin on to job,they will receivetheir next jobTop Golfouting July18thdeadline tosign up8:30 pleasemanually assignthe remaining 8-10's that AD didnot assign basedoff distance /blueflags/ etc.OTATech first jobshould beassigned nolater than7:30Once tech login to first jobthe remainingof 8-10's willassign to tech8:00-10 (all jobsshould be out ofthe 7552/0000and assigned toa technician by8:30am)ADAvail Non-ProductiveTechs shouldbe logging into first job by8am -8:15EnrouteProductiveIf a tech happensto go to zero youwill need to givetech their next jobto kick start AD toroute tech!7:30-7:45Ensure alltechs areenroute tofirst job 8-9'sBP Partnersshould befollowing thissame process andshould not receivetheir full routes atone timeCity1:00-3 (all jobsshould be out ofthe 7552/0000and assigned toa technician by1:30pm)NorthCentral3:00-5 (all jobsshould be out ofthe 7552/0000and assigned toa technician by3:30pm)7:00 -7:30 Processcalls offs makesure all 8-9's arecovered out thepool and reroutedbased off call offsJob+110:00-12 (all jobsshould be out ofthe 7552/0000and assigned to atechnician by10:30am)LOFFNon-ProductiveSouthIf work is not out ofthe pools at thespecified times,please inform anFTC supervisorimmediately.EOD Non-Productive5:00-7 (all jobsshould be out ofthe 7552/0000and assigned toa technician by4:30)BreakNon-Productivetechs can onlydo one job at atime once techlogin on to job,they will receivetheir next jobTop Golfouting July18thdeadline tosign up8:30 pleasemanually assignthe remaining 8-10's that AD didnot assign basedoff distance /blueflags/ etc.OTATech first jobshould beassigned nolater than7:30Once tech login to first jobthe remainingof 8-10's willassign to tech8:00-10 (all jobsshould be out ofthe 7552/0000and assigned toa technician by8:30am)ADAvail Non-ProductiveTechs shouldbe logging into first job by8am -8:15EnrouteProductiveIf a tech happensto go to zero youwill need to givetech their next jobto kick start AD toroute tech!7:30-7:45Ensure alltechs areenroute tofirst job 8-9's

Untitled Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
  1. BP Partners should be following this same process and should not receive their full routes at one time
  2. City
  3. 1:00-3 (all jobs should be out of the 7552/0000 and assigned to a technician by 1:30pm)
  4. North Central
  5. 3:00-5 (all jobs should be out of the 7552/0000 and assigned to a technician by 3:30pm)
  6. 7:00 -7:30 Process calls offs make sure all 8-9's are covered out the pool and rerouted based off call offs
  7. Job+1
  8. 10:00-12 (all jobs should be out of the 7552/0000 and assigned to a technician by 10:30am)
  9. LOFF Non-Productive
  10. South
  11. If work is not out of the pools at the specified times, please inform an FTC supervisor immediately.
  12. EOD Non-Productive
  13. 5:00-7 (all jobs should be out of the 7552/0000 and assigned to a technician by 4:30)
  14. Break Non-Productive
  15. techs can only do one job at a time once tech login on to job, they will receive their next job
  16. Top Golf outing July 18th deadline to sign up
  17. 8:30 please manually assign the remaining 8-10's that AD did not assign based off distance /blue flags/ etc.
  18. OTA
  19. Tech first job should be assigned no later than 7:30
  20. Once tech log in to first job the remaining of 8-10's will assign to tech
  21. 8:00-10 (all jobs should be out of the 7552/0000 and assigned to a technician by 8:30am)
  22. AD
  23. Avail Non-Productive
  24. Techs should be logging in to first job by 8am -8:15
  25. Enroute Productive
  26. If a tech happens to go to zero you will need to give tech their next job to kick start AD to route tech!
  27. 7:30-7:45 Ensure all techs are enroute to first job 8-9's