NorthCentralIf a tech happensto go to zero youwill need to givetech their next jobto kick start AD toroute tech!3:00-5 (all jobsshould be out ofthe 7552/0000and assigned toa technician by3:30pm)EOD Non-ProductiveJob+1Once tech login to first jobthe remainingof 8-10's willassign to techTech first jobshould beassigned nolater than7:308:00-10 (all jobsshould be out ofthe 7552/0000and assigned toa technician by8:30am)OTAIf work is not out ofthe pools at thespecified times,please inform anFTC supervisorimmediately.1:00-3 (all jobsshould be out ofthe 7552/0000and assigned toa technician by1:30pm)SouthCityEnrouteProductive5:00-7 (all jobsshould be out ofthe 7552/0000and assigned toa technician by4:30)8:30 pleasemanually assignthe remaining 8-10's that AD didnot assign basedoff distance /blueflags/ etc.Techs shouldbe logging into first job by8am -8:15Avail Non-ProductiveBP Partnersshould befollowing thissame process andshould not receivetheir full routes atone time10:00-12 (all jobsshould be out ofthe 7552/0000and assigned to atechnician by10:30am)ADTop Golfouting July18thdeadline tosign upLOFFNon-Productivetechs can onlydo one job at atime once techlogin on to job,they will receivetheir next job7:30-7:45Ensure alltechs areenroute tofirst job 8-9's7:00 -7:30 Processcalls offs makesure all 8-9's arecovered out thepool and reroutedbased off call offsBreakNon-ProductiveNorthCentralIf a tech happensto go to zero youwill need to givetech their next jobto kick start AD toroute tech!3:00-5 (all jobsshould be out ofthe 7552/0000and assigned toa technician by3:30pm)EOD Non-ProductiveJob+1Once tech login to first jobthe remainingof 8-10's willassign to techTech first jobshould beassigned nolater than7:308:00-10 (all jobsshould be out ofthe 7552/0000and assigned toa technician by8:30am)OTAIf work is not out ofthe pools at thespecified times,please inform anFTC supervisorimmediately.1:00-3 (all jobsshould be out ofthe 7552/0000and assigned toa technician by1:30pm)SouthCityEnrouteProductive5:00-7 (all jobsshould be out ofthe 7552/0000and assigned toa technician by4:30)8:30 pleasemanually assignthe remaining 8-10's that AD didnot assign basedoff distance /blueflags/ etc.Techs shouldbe logging into first job by8am -8:15Avail Non-ProductiveBP Partnersshould befollowing thissame process andshould not receivetheir full routes atone time10:00-12 (all jobsshould be out ofthe 7552/0000and assigned to atechnician by10:30am)ADTop Golfouting July18thdeadline tosign upLOFFNon-Productivetechs can onlydo one job at atime once techlogin on to job,they will receivetheir next job7:30-7:45Ensure alltechs areenroute tofirst job 8-9's7:00 -7:30 Processcalls offs makesure all 8-9's arecovered out thepool and reroutedbased off call offsBreakNon-Productive

Untitled Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
  1. North Central
  2. If a tech happens to go to zero you will need to give tech their next job to kick start AD to route tech!
  3. 3:00-5 (all jobs should be out of the 7552/0000 and assigned to a technician by 3:30pm)
  4. EOD Non-Productive
  5. Job+1
  6. Once tech log in to first job the remaining of 8-10's will assign to tech
  7. Tech first job should be assigned no later than 7:30
  8. 8:00-10 (all jobs should be out of the 7552/0000 and assigned to a technician by 8:30am)
  9. OTA
  10. If work is not out of the pools at the specified times, please inform an FTC supervisor immediately.
  11. 1:00-3 (all jobs should be out of the 7552/0000 and assigned to a technician by 1:30pm)
  12. South
  13. City
  14. Enroute Productive
  15. 5:00-7 (all jobs should be out of the 7552/0000 and assigned to a technician by 4:30)
  16. 8:30 please manually assign the remaining 8-10's that AD did not assign based off distance /blue flags/ etc.
  17. Techs should be logging in to first job by 8am -8:15
  18. Avail Non-Productive
  19. BP Partners should be following this same process and should not receive their full routes at one time
  20. 10:00-12 (all jobs should be out of the 7552/0000 and assigned to a technician by 10:30am)
  21. AD
  22. Top Golf outing July 18th deadline to sign up
  23. LOFF Non-Productive
  24. techs can only do one job at a time once tech login on to job, they will receive their next job
  25. 7:30-7:45 Ensure all techs are enroute to first job 8-9's
  26. 7:00 -7:30 Process calls offs make sure all 8-9's are covered out the pool and rerouted based off call offs
  27. Break Non-Productive