HVAC Clean- in-Place (CIP) Logbook Quality Culture Environmental Monitoring Preventive Maintenance Hand Hygiene Sampling Plan ISO Class 8 Controlled Copy Regulatory Inspection Electronic Records Retention Period Calibration Area Classification Risk Assessment Cleanroom Behavior Out of Specification (OOS) Gowning Manufacturing Instructions (MIs) Footwear Sanitization Illness Reporting Utility System (e.g., Water- for-Injection) Equipment Qualification (IQ/OQ/PQ) HEPA Filter Change Control Quality Control Audit Trail Validation Master Plan Data Integrity Supplier Qualification Final Product Release Batch Record Lot Number 🔹 Documentation & Records 🔹 Personnel & Hygiene Beard Cover Hair Cover Sterility Root Cause Analysis 🔹 Facility & Equipment 🔹 Quality & Compliance ALCOA+ (Attributable, Legible, etc.) Contamination Control Deviation Quality Assurance Internal Audit Quarantine Area CAPA No Personal Items Visual Inspection Glove Protocol 🔹 Processes & Products PPE Material Receipt HVAC Clean- in-Place (CIP) Logbook Quality Culture Environmental Monitoring Preventive Maintenance Hand Hygiene Sampling Plan ISO Class 8 Controlled Copy Regulatory Inspection Electronic Records Retention Period Calibration Area Classification Risk Assessment Cleanroom Behavior Out of Specification (OOS) Gowning Manufacturing Instructions (MIs) Footwear Sanitization Illness Reporting Utility System (e.g., Water- for-Injection) Equipment Qualification (IQ/OQ/PQ) HEPA Filter Change Control Quality Control Audit Trail Validation Master Plan Data Integrity Supplier Qualification Final Product Release Batch Record Lot Number 🔹 Documentation & Records 🔹 Personnel & Hygiene Beard Cover Hair Cover Sterility Root Cause Analysis 🔹 Facility & Equipment 🔹 Quality & Compliance ALCOA+ (Attributable, Legible, etc.) Contamination Control Deviation Quality Assurance Internal Audit Quarantine Area CAPA No Personal Items Visual Inspection Glove Protocol 🔹 Processes & Products PPE Material Receipt
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
HVAC
Clean-in-Place (CIP)
Logbook
Quality Culture
Environmental Monitoring
Preventive Maintenance
Hand Hygiene
Sampling Plan
ISO Class 8
Controlled Copy
Regulatory Inspection
Electronic Records
Retention Period
Calibration
Area Classification
Risk Assessment
Cleanroom Behavior
Out of Specification (OOS)
Gowning
Manufacturing Instructions (MIs)
Footwear Sanitization
Illness Reporting
Utility System (e.g., Water-for-Injection)
Equipment Qualification (IQ/OQ/PQ)
HEPA Filter
Change Control
Quality Control
Audit Trail
Validation Master Plan
Data Integrity
Supplier Qualification
Final Product Release
Batch Record
Lot Number
🔹 Documentation & Records
🔹 Personnel & Hygiene
Beard Cover
Hair Cover
Sterility
Root Cause Analysis
🔹 Facility & Equipment
🔹 Quality & Compliance
ALCOA+ (Attributable, Legible, etc.)
Contamination Control
Deviation
Quality Assurance
Internal Audit
Quarantine Area
CAPA
No Personal Items
Visual Inspection
Glove Protocol
🔹 Processes & Products
PPE
Material Receipt